Versiunea din 03.02.2017. Text extras automat din fișierul original; aspectul poate diferi. Lipsesc: numerotarea automată, casetele de text, desenele. descarcă originalul (.doc, 539 KB)

FINANCING AGREEMENT

SECTOR REFORM CONTRACT

SPECIAL CONDITIONS

The European Commission, hereinafter referred to as "the Commission", acting on behalf of the European Union, hereinafter referred to as "the EU",

of the one part, and

the Government of the Republic of Moldova hereinafter referred to as "the Partner Country",

of the other part,

have agreed as follows:

Article 1 - Nature of the action

1.1. The EU agrees to finance and the Partner Country agrees to accept the financing of the following budget support action:

Support to Police Reform

CRIS number: ENI/2015/038-144

This action is financed from the EU Budget under the following basic act: European Neighbourhood Instrument.

1.2. The total estimated cost of this action is EUR 57,200,000 and the maximum EU contribution to this action is set at EUR 57,000,000.

This budget support action is composed of:

  1. a budget support component with a maximum EU contribution of EUR 51,000,000.
  2. a complementary support component with a total estimated cost of EUR 6,200,000 and a maximum EU contribution of EUR 6,000,000.

1.3. The Partner Country shall not co-finance the action.

Article 2 – Execution period

2.1. The execution period of this Financing Agreement as defined in Article 15 of Annex II (General Conditions) shall commence on the entry into force of this Financing Agreement and end 84 months after this date.

2.2. The duration of the operational implementation phase is fixed at 60 months.

2.3. The duration of the closure phase is fixed at 24 months.

Article 3 – Addresses

All communications concerning the implementation of this Financing Agreement shall be in writing, shall refer expressly to this action as identified in Article 1.1 of these Special Conditions and shall be sent to the following addresses:

  1. for the Commission

Mr Pirkka TAPIOLA

Head of the EU Delegation to the Republic of Moldova

12, Kogalniceanu Street

MD-2001 Chisinau

Republic of Moldova

DELEGATION-MOLDOVA@eeas.europa.eu

  1. for the Partner Country

Mr Pavel FILIP

Prime Minister of the Republic of Moldova

1, Piata Marii Adunari Nationale

MD-2001 Chisinau

Republic of Moldova

Article 4 – OLAF contact point

The contact point of the Partner Country having the appropriate powers to cooperate directly with the European Anti-Fraud Office (OLAF) in order to facilitate OLAF's operational activities shall be:

Mr Veaceslav UNTILĂ

Court of Accounts of the Republic of Moldova

69, Stefan cel Mare Bd., Chisinau 2001, Republic of Moldova

Tel: +373 22 233-776

Article 5 - Annexes

5.1. This Financing Agreement is composed of:

(a) these Special Conditions;

(b) Annex I: Technical and Administrative Provisions, detailing the objectives, expected results, activities, description of the budget-implementation tasks entrusted and budget of this Action;

(c) Annex II: General Conditions;

(d) Annex III: Reporting Template – not applicable to and not included in this Financing Agreement;

(e) Annex IV: Management Declaration Template – not applicable to and not included in this Financing Agreement.

5.2. In the event of a conflict between, on the one hand, the provisions of the Annexes and, on the other hand, the provisions of these Special Conditions, the latter shall take precedence. In the event of a conflict between, on the one hand, the provisions of Annex I (Technical and Administrative Provisions) and, on the other hand, the provisions of Annex II (General Conditions), the latter shall take precedence.

Article 6 - Provisions derogating from or supplementing Annex II (General Conditions)

The foreign exchange transfers will be accounted for under the value date of the notification of credit to the EUR account of the Ministry of Finance of the Republic of Moldova held at the National Bank of Moldova.

The exchange rate will be the official exchange rate set by the National Bank of Moldova, on the value date of the notification of credit[1].

Article 7– Entry into force

This Financing Agreement shall enter into force on the date on which it is signed by the last party, but not later than by 31/12/2016.

Done in two original copies, one copy being handed to the Commission and one to the Partner Country.

For the Partner Country: For the Commission:

H.E. Pavel FILIP Mr Lawrence MEREDITH

Prime Minister of the Republic of Moldova Director Neighbourhood East

Directorate-General for Neighbourhood and Enlargement Negotiations

Signature: Signature:

Date: 14/12/2014 Date: 09/12/2016

ANNEX I TO FINANCING AGREEMENT ENI/2015/038-144

TECHNICAL AND ADMINISTRATIVE PROVISIONS

1. Title/basic act/ CRIS number

Support to Police Reform

CRIS number: ENI/2015/038-144

Financed under European Neighbourhood Instrument

2. Zone benefiting from the action/location

Republic of Moldova

The action shall be carried out at the following location: the whole territory of the Republic of Moldova.

3. Programming document

Single Support Framework (SSF) for EU support to the Republic of Moldova (2014-2017)

4. Sector of concentration/ thematic area

Police reform and border management

5. Amounts concerned

Total estimated cost: EUR 57.2million

Total amount of EU budget contribution is EUR 57million, of which:

- EUR 51million for budget support, and

- EUR 6 million for complementary support

This action is co-financed by potential grant beneficiaries for an indicative amount of EUR 0.2 million

6. Aid modality(ies)and implementation modality(ies)

Direct management - Budget Support: Sector Reform Contract, procurement of services and grants – calls for proposals (including Twinning)

7. DAC code(s)

15130 – Legal and judicial development

8. Markers (from CRIS DAC form)

General policy objective

Not targeted

Significant objective

Main objective

Participation development/good governance

□

□

Aid to environment

□

□

Gender equality (including Women In Development)

□

□

Trade Development

□

□

Reproductive, Maternal, New born and child health

□

□

RIO Convention markers

Not targeted

Significant objective

Main objective

Biological diversity

□

□

Combat desertification

□

□

Climate change mitigation

□

□

Climate change adaptation

□

□

9. Global Public Goods and Challenges (GPGC) thematic flagships

Not applicable

Summary

The cooperation between the Republic of Moldova and the European Union (EU) is guided by the Association Agreement (AA) signed on 27 June 2014.The AA highlights the need for key priority reforms in democracy, the rule of law, human rights and fundamental freedoms, good governance, a functioning market economy and sustainable development.

EU financial assistance to Moldova is synchronised with the priorities and objectives set out in the new Agreement and it is framed in the Single Support Framework (SSF) 2014-2017 focusing support in the fields of public administration reform, agriculture and rural development, police and border management.

Police reform is coordinated by the Ministry of Internal Affairs of the Republic of Moldova (MIA) and its subordinated units and is carried out in the wider framework of the reform of the justice and law enforcement authorities in the Republic of Moldova (justice sector reform, reform of National Anti-corruption Centre, security and border management reform).

The proposed action for a Sector Reform Contract (SRC) “Support to Police reform" is in line with the SSF and its overall objective is to assist the Government of the Republic of Moldova in ensuring the rule of law, enhancement of public order and security and protection of human rights through development of an accessible, accountable, efficient, transparent and professional police force.

The SRC will consist of a budget support component for the implementation of the Police reform, a technical assistance project accompanying the budget support programme and institutional capacity building activities, communication and visibility activities. It will be complemented by a Twinning project - with a Member State Institution - focused on the reform of the initial and continuous training of the Police system and by grants for Non-Governmental Organisations (NGOs) to support the external monitoring and oversight of the Police reform.

  1. Description of the action
    1. Objectives/results

The overall objective of the Sector Reform Contract (SRC) “Support to Police reform” is to assist the Government of the Republic of Moldova in ensuring the rule of law, enhancement of public order and security, combatting organised crime and protection of human rights through development of an accessible, accountable, efficient, transparent and professional police force.

The specific objectives (SO) of the programme are:

  1. To strengthen accountability, efficiency, transparency and professionalism of the Police force in line with best EU and international standards and practices.
  2. To ensure the fair, efficient and effective enforcement of the law through the application of a rights-based approach to policing.
  3. To strengthen the capacities of Police to participate in the fight against organised crime, human trafficking, cybercrime, violence, including gender-based crimes, drugs and armament smuggling, counterfeiting, money laundering and financial crimes, including the search, seizure, management and confiscation of the proceeds of crime.
  4. To develop and implement the concept of community policing in line with best EU and international standards and practices.
  5. To promote and implement the principle of zero-tolerance to corruption, discrimination and ill-treatment in the Police force.

The expected results of the programme are:

SO 1

Expected result 1:Police force is well-trained and equipped, accountable, efficient, transparent and professional, notably with respect to:

Expected result 2: Reorganisation and demilitarisation of Carabineer Troops within the Police and clear delimitation of tasks and duties within the Police force is completed, notably with respect to:

SO 2

Expected result 3: The process of pre-trial investigation and prosecution is streamlined, notably with respect to:

Expected result 4: Human rights-based approach to policing applied in line with United Nations (UN) human rights standards and practices for the police, notably with respect to:

SO 3

Expected result 5: The level of organised crime, human trafficking, cybercrime, violence, including gender-based crimes, drugs and armament smuggling, counterfeiting, money laundering and financial crimes is reduced, notably with respect to:

SO 4

Expected result 6: Community policing concept developed and implemented, notably with respect to:

SO 5

Expected result 7: Corruption in the Police force significantly reduced, notably with respect to:

Main activities

Main activities to implement this assistance programme are budget support dialogue and policy dialogue, financial transfer, performance assessment, reporting and capacity development and will include:

Budget support

Main activities to be carried out within the framework of the Budget Support component of this SRC will include:

Complementary support

Main activities to be carried out will include:

Intervention logic

The reform of Police continues to be a priority of the Government of the Republic of Moldova as foreseen in the Government's Programme of Activity 2015-2018. Moreover, in the context of the recent developments, namely liberalisation of the visa regime with EU and provisional application of the EU-Moldova Association Agreement, as well as considering the unstable regional security context, the Moldovan authorities acknowledge the importance to maintain the speed and dynamics of the reform and continue implementation of the existing commitments and planned activities.

The whole spectrum of activities foreseen by this SRC should take stock of the achievements of Visa Liberalisation Action Plan (VLAP) in the area of public order and security and focus on supporting the implementation of the Strategy on Police Development 2016-2020. The achievement of the specific objectives, expected results and main activities listed in the sections 1.1 and 1.2 will contribute to the successful implementation of the sector reform strategy and accomplishment of the overall objective of the programme ensuring the rule of law, enhancement of public order and security and protection of human rights through development of an accessible, accountable, efficient, representative, transparent and professional police force in the Republic of Moldova.

In the same respect, the complementary support activities listed in section1.2.2 will contribute to and facilitate the implementation of the budget support programme. A technical assistance project will be contracted in order to strengthen the institutional capacities of Police and support the Moldovan authorities in implementation of the SRC. In parallel, a Twinning project will be launched in order to support the institutional establishment and development of the Joint Law Enforcement Training Centre and modernisation of the Moldovan Police Academy in line with EU and international standards and best practices.

Another important aspect for the successful implementation of the SRC is external monitoring and oversight through civil society involvement. In this regard, a Call for proposals for participation of NGO's will be launched as complementary part to the budget support component and indicatively two grant contracts will be concluded with the aim to supervise the respect of human rights within the process of implementation of the sector reform strategy.

  1. Implementation

2.1Implementation of the budget support component

2.1.1Rationale for the amounts allocated to budget support

The total amount of the EU contribution allocated for the budget support component of this SRC is EUR 51million, and for complementary support is EUR 6 million.

The rationale for this amount is based on a broad qualitative assessment that took into consideration an analysis of the following elements:

This amount is based on the identification of needs to implement the Police reform within the broader reforms of justice and law enforcement sectors, including in the framework of efficient implementation of EU-Moldova Association Agreement and the visa-free regime with EU. In a comprehensive information gathering phase, several stakeholders were involved to identify these needs and to agree on a list of priorities, which included improvements to the legal and regulatory framework, necessities to reorganise structures, to define clearly the missions of the Police, to enhance their capacities and abilities in order to create citizens' oriented services, to provide conditions meeting international human rights standards and increase the trust of the population in state institutions and its personnel.

As regards budgetary resource allocations for reform of MIA and its subordinated units (including Police and Carabineer Troops), these are mentioned under the heading "Public order and national security" which have the following total estimation according to latest medium-term budgetary frameworks (MTBF): 2016 – MDL 2653.40 million (approx. EUR 133.13 million); and 2017 – MDL 2706.00 million (approx. EUR 135.76 million).

In 2014, the amount allocated for MIA and its units was budgeted at MDL 1919.1 million (approx. EUR 104 million) and 46.2% out of it have been allocated and spent on Police, Carabineer Troops and reform needs (approx. EUR 47 million). In 2015, the amount for MIA and its units was budgeted at 2444.4 million MDL (approx. EUR 120 million) and 48.4% out of it have been allocated for Police, Carabineer Troops and reform needs (approx. EUR 58.1 million).

2.1.2 Criteria for disbursement of budget support

a) The general conditions for disbursement of all tranches are as follows:

b) The specific conditions for disbursement that may be used for variable tranches are covering the following five components:

  1. Accountability, efficiency, transparency and professionalism of the Police force strengthened in line with best EU and international standards and practices.
  2. Fair, efficient and effective enforcement of the law through the application of a rights-based approach to policing ensured.
  3. Capacities of Police to participate in the fight against organised crime, human trafficking, cybercrime, violence, including gender-based crimes, drugs and armament smuggling, counterfeiting, money laundering and financial crimes strengthened.
  4. The concept of community policing developed and implemented in line with best EU and international standards and practices.
  5. Principle of zero-tolerance to corruption, discrimination and ill-treatment in the Police force implemented.

Detailed description of the specific conditions and annual indicators (Policy Matrix) is presented in Annex 1.

The chosen performance targets and indicators to be used for disbursements will apply for the duration of the programme. However, in duly justified circumstances, the Government of Moldova may submit a request to the Commission for the targets and indicators to be changed. The changes agreed to the targets and indicators may be authorised by exchange of letters between the two parties.

In case of a significant deterioration of fundamental values, budget support disbursements may be formally suspended, temporarily suspended, reduced or cancelled, in accordance with the relevant provisions of the financing agreement.

2.1.3Budget support details

Budget support is provided as direct untargeted budget support to the national Treasury. The crediting of the euro transfers disbursed into Moldovan lei (MDL) will be undertaken at the appropriate exchanges rates in line with the relevant provisions of the financing agreement. The indicative schedule of disbursements is summarised in the table below (all figures in EUR millions) based on fiscal year of the partner country.

Country fiscal year[3]

2017

2018

2019

2020

2021

Total

Type of tranche

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Fixed

tranche

7

Variable tranche

10

12

10

12

Total

7

10

12

10

12

51

The programme foresees the payment of five instalments: one fixed tranche and four variable annual tranches. The fixed tranche is paid upon compliance with the General Conditions for disbursement only. The variable tranches will be paid depending on compliance with the General Conditions and the Specific Conditions.

Detailed description of the disbursement arrangements and timetable, including financial allocation per indicator, is presented in Annex 1.

2.2 Implementation modalities for complementary support

2.2.1Grants: call for proposals "Ensuring the monitoring, contribution and oversight of the implementation of the programme related reforms and activities, with a special focus on the respect of human rights" (direct management)

(a) Objectives of the grants, fields of intervention, priorities of the year and expected results

Objectives:

Fields of intervention:

Priorities of the grants:

  1. External contribution, monitoring and assessment of the implementation of the rights-based approach to policing.
  2. External oversight and evaluation of the implementation of the programme related reforms and activities, including in the area of management of public expenditures.

Expected results:

(b) Eligibility conditions

In order to be eligible for a grant, the applicants must be non-governmental organisations. Subject to information to be published in the call for proposals, the indicative amount of the EU contribution per grant is maximum EUR 400.000 (the indicative number of grant contracts will be two) and the grants may be awarded to sole beneficiaries and to consortia of beneficiaries (coordinator and co-beneficiaries). The indicative duration of the grant (its implementation period) is 36 months.

(c) Essential selection and award criteria

The essential selection criteria are financial and operational capacity of the applicant.

The essential award criteria are relevance of the proposed action to the objectives of the call; design, effectiveness, feasibility, sustainability and cost-effectiveness of the action.

(d) Maximum rate of co-financing

The maximum possible rate of co-financing for grants under this call is 80 %. In accordance with Article 192 of Regulation (EU, Euratom) No 966/2012, if full funding is essential for the action to be carried out, the maximum possible rate of co-financing may be increased up to 100 %. The essentiality of full funding will be justified by the Commission’s authorising officer responsible in the award decision, in respect of the principles of equal treatment and sound financial management.

(e) Indicative timing to launch the call

Second trimester of 2017

2.2.2 Grants: call for proposal for Twinning project ''Reform of the initial and continuous training of the Police system"(direct management)

Under the present programme, it is expected to conclude one Twinning grant contract.

(a) Objectives of the grants, fields of intervention, priorities of the year and expected results

Objectives:

Fields of intervention:

Priorities of the grant:

Expected results:

(b) Eligibility conditions

In line with Article 4(10)(b) of Regulation (EU) No 236/2014 participation in Twinning calls for proposals is limited to public administrations of the EU Member States, being understood as central or regional authorities of a Member State as well as their bodies and administrative structures and private law bodies with a public service mission under their control provided they act for the account and under the responsibility of that Member State.

(c) Essential selection and award criteria

The essential selection criterion is the operational capacity of the applicant.

The essential award criteria are the technical expertise of the applicant, and the relevance, methodology and sustainability of the proposed action.

(d) Maximum rate of co-financing

The rate of co-financing for eligible costs for Twinning grant contracts is 100%[4].

(e) Indicative timing to launch the call

Third trimester of 2017

(f) Use of lump sums/flat rates/unit costs

Twinning contracts include a system of unit costs and flat rate financing, defined in the Twinning Manual, for the reimbursement of the public sector expertise provided by the selected Member States administrations. The use of this system of unit costs and flat rate financing, which exceeds the amount of EUR 60 000 per beneficiary of a Twinning contract, is subject to the adoption of a separate, horizontal Commission decision.

2.2.3Procurement (direct management)

Subject

Type (works, supplies, services)

Indicative number of contracts

Indicative trimester of launch of the procedure

Technical assistance

Services

1

First trimester 2017

Communication and visibility

Services

1

Fourth trimester 2018

Review missions, evaluation and audit

Services

4

Fourth trimester 2018

Fourth trimester 2019

First trimester 2020

First trimester 2020

2.3Scope of geographical eligibility for procurement and grants

The geographical eligibility in terms of place of establishment for participating in procurement and grant award procedures and in terms of origin of supplies purchased as established in the basic act and set out in the relevant contractual documents shall apply.

The Commission’s authorising officer responsible may extend the geographical eligibility in accordance with Article 9(2)(b) of Regulation (EU) No 236/2014 on the basis of urgency or of unavailability of products and services in the markets of the countries concerned, or in other duly substantiated cases where the eligibility rules would make the realisation of this action impossible or exceedingly difficult.

2.4Indicative budget

Implementation modalities

EU contribution

(amount in EUR)

Indicative third party contribution, in currency identified

2.1 - Budget support Sector Reform Contract

51 000 000

N/A

2.2 – Complementary support composed of

6 000 000

200 000

2.2.1. – Call for Proposals "Ensuring the monitoring, contribution and oversight of the implementation of the programme related reforms and activities, with a special focus on the respect of human rights" (direct management)

800 000

200 000

2.2.2 – Twinning on "Reform of the initial and continuous training of the Police system" (direct management)

2 000 000

N/A

2.2.3 – Procurement (direct management) - Technical Assistance and compliance with budget support conditions (direct management)

2 850 000

N/A

2.7, 2.8 – Evaluation and Audit

100 000

N/A

2.9 - Communication and visibility

250 000

N/A

Total

57 000 000

200 000

2.5Organisational set-up and responsibilities

A coordination team will be consolidated within the MIA, at the Central Apparatus level, to manage the activities to be performed under the action and to prepare regular progress reports. It will be managed by the General Department for International Relations and European Integration, dealing also with donor coordination and projects management and reporting directly to the Minister. The coordination team will also have the responsibility to provide guidelines for the implementation of the SRC objectives. The Police and other related MIA units will have the direct responsibility to implement the planned activities.

Programme Steering Committee meetings will be held at least twice a year for reviewing and assessment of overall performance in achieving the SRC's reform objectives and indicators. The Steering Committee's meetings will be co-chaired by the MIA and the EU Delegation and will be attended by the duly authorized representatives from the Ministry of Foreign Affairs and European Integration, the Ministry of Finance and the State Chancellery, as well as by any other relevant authority if and when required. At these meetings, corrective measures, if so required, will also be discussed and agreed upon.

At the top level, the overall strategic guidance of the implementation of this Sector Reform Contract will be carried out by Governmental Commission for European Integration, chaired by the Prime Minister.

2.6Performance monitoring and reporting

The day-to-day technical and financial monitoring of the implementation of this action will be a continuous process and part of the implementing partner’s responsibilities. To this aim, the implementing partner shall establish a permanent internal, technical and financial monitoring system for the action and elaborate regular progress reports (not less than annual) and final reports. Every report shall provide an accurate account of implementation of the action, difficulties encountered, changes introduced, as well as the degree of achievement of its results (outputs and direct outcomes) as measured by corresponding indicators, using as reference the list of result indicators (for budget support). The report shall be laid out in such a way as to allow monitoring of the means envisaged and employed and of the budget details for the action. The final report, narrative and financial, will cover the entire period of the action implementation.

The Commission may undertake additional project monitoring visits both through its own staff and through independent consultants recruited directly by the Commission for independent monitoring reviews (or recruited by the responsible agent contracted by the Commission for implementing such reviews).

Review missions will be contracted by the Commission to assist in assessing the fulfilment of budget support conditions for disbursement as stipulated in Annex I. The review missions will take place at the end of the financial year to review the progress of the reform.

The baseline reviews and discussions on evaluation reports will also consider involvement of civil society, especially sector relevant NGOs.

On-going technical and financial monitoring of the implementation of this Sector Reform Contract is the responsibility of the MIA. The results of both the technical and financial monitoring will be reported at least twice a year to the Steering Committee and will form the basis for the assessment of the sector reform performance.

2.7Evaluation

Having regard to the importance of the action, amid-term evaluation will be carried out for this action or its components via independent consultants contracted by the Commission.

It will be carried out for accountability and learning purposes at various levels (including for policy revision), taking into account in particular the fact that the Police reform is still in process and results will depend on the regional and national security situation and the political circumstances from the country.

The Commission shall inform the implementing partner at least two months in advance of the dates foreseen for the evaluation missions. The implementing partner shall collaborate efficiently and effectively with the evaluation experts, and inter alia provide them with all necessary information and documentation, as well as access to the project premises and activities.

The evaluation reports shall be shared with the partner country and other key stakeholders. The implementing partner and the Commission shall analyse the conclusions and recommendations of the evaluations and, where appropriate, in agreement with the partner country, jointly decide on the follow-up actions to be taken and any adjustments necessary, including, if indicated, the reorientation of the project.

2.8 Audit

Without prejudice to the obligations applicable to contracts concluded for the implementation of this action, the Commission may, on the basis of a risk assessment, contract independent audits or expenditure verification assignments for one or several contracts or agreements.

2.9 Communication and visibility

Communication and visibility of the EU is a legal obligation for all external actions funded by the EU.

This action shall contain communication and visibility measures which shall be based on a specific Communication and Visibility Plan of the Action, to be elaborated by a contractor on basis of a separate service contract at the start of implementation and supported with the budget indicated in section 2.4above.

In terms of legal obligations on communication and visibility, the measures shall be implemented by the Commission, the partner country, contractors, grant beneficiaries and/or entrusted entities. Appropriate contractual obligations shall be included in, respectively, the financing agreement, procurement and grant contracts, and delegation agreements.

The Communication and Visibility Manual for European Union External Action shall be used to establish the Communication and Visibility Plan of the Action and the appropriate contractual obligations. The Communication and Visibility activities will be implemented through procurement of services and will be conducted in accordance with the Communication and Visibility Manual.

The Government of the Republic of Moldova will ensure that the visibility of the EU contribution to the SRC is given appropriate coverage in the various publicity media. The accompanying TA and communication and visibility service contracts will endeavour to further enhance the positive image of the EU in the context of its work in the Republic of Moldova and specific provision for this purpose will be included in these contracts. At appropriate milestones during the SRC duration and after appropriate events, press releases will be issued, by MIA in co-operation with the EU Delegation to Moldova. In all these actions, the EU visibility guidelines will be strictly adhered to.

Appendix: Indicative list of result indicators

Annex1: Disbursement arrangements and timetable

APPENDIX - Indicative list of result indicators (for Budget Support)

The inputs, the expected direct and induced outputs and all the indicators, targets and baselines included in the list of result indicators are indicative and may be updated during the implementation of the action without an amendment to the financing decision. The table with the indicative list of result indicators will evolve during the lifetime of the action: new columns will be added for intermediary targets (milestones), when it is relevant and for reporting purpose on the achievement of results as measured by indicators.

Intervention logic

Indicators

Baselines

(incl. reference year)

Targets

(incl. reference year)

Sources and means of verification

Overall objective: Impact

Rule of law ensured by enhancement of public order and security and protection of human rights through the development of an accessible, accountable, efficient, transparent and professional police force.

Level of trust in police is improved and maintained (% of people who trust police is gradually increased).

Cumulative trust in Police of 31% in April 2014.

Cumulative trust in Police of at least 41% by 2019.

Annual statistical data from National Bureau of Statistics.

Yearly progress reports on implementation of Strategy on Police reform 2016-2019.

Barometer of Public Opinion.

Specific objective(s): Outcome(s)

SO 1. Accountability, efficiency, transparency and professionalism of the Police force strengthened.

SO 2. Fair, efficient and effective enforcement of the law through the application of a rights-based approach to policing ensured.

SO 3. Capacities of Police to participate in the fight against organised crime, human trafficking, cybercrime, violence, including gender-based crimes, drugs and armament smuggling, counterfeiting and money laundering strengthened.

SO 4. Modern police service in line with best EU and international standards and practices able to proactively respond in an equal manner to the needs of citizens and society as a whole established.

SO 5. Principle of zero-tolerance to corruption in the Police force implemented.

Police force well-trained and equipped, accountable, efficient, transparent and professional.

Reorganisation and demilitarisation of Carabineer Troops within the Police and delimitation of tasks and duties within the Police force completed.

Process of pre-trial investigation and prosecution enhanced.

Human rights-based approach to policing applied in line with UN human rights standards and practices for the police

Level of organised crime, human trafficking, cybercrime, violence, including gender-based crimes, drugs and armament smuggling, counterfeiting and money laundering reduced.

Community policing developed and implemented.

Corruption in the Police force significantly reduced.

Intervention time of 42 minutes in 2015.

Convictions and complaints statistics (women and men) from 2015.

Crime, traffic and public order incident statistics from 2015.

% of citizens (women and men) who believe Government is committed to tackling corruption of 11% in April 2015.

Intervention time reduced to 15 minutes by 2019.

Ratio of redress close to 35% by 2019 and ratio of investigations sent to court resulting in convictions close to 75% by 2019.

Rate of criminality reduced with at least 2% every year by 2019.

% of citizens (women and men) who believe Government is committed to tackling corruption increased to at least 30% by 2019.

EU Progress Reports (including reports from EU Member States).

MIA reports and web-site.

CSO monitoring reports.

Court Reports.

Reports from Superior Council of Prosecutors and Magistrates.

Bar Association Reports.

Ombudsman’s Reports.

ECHR Reports.

ICC Reports.

Corruption Perception Index.

Barometer of Public Opinion.

Annual statistical data from National Bureau of Statistics.

Induced outputs

1. Improved human resources management system of the Police through development of regulations and procedures for personnel merit-based recruitment, remuneration, evaluation and promotion, including at regional level and taking into consideration the gender disparities of access, especially to senior management posts.

2. Increased access of citizens at central, regional and local levels to police services and public information regarding activity, budget and expenditures of Police.

3. Increased capabilities to ensure public order and security by complete professionalization of carabineers and avoiding overlapping in police competences.

4. Improved cooperation between Police and prosecutors.

5. Ensuring the respect of international human rights standards during arrests and other operative measures, including fair and tailor-made approaches to children and gender issues.

6. Reduction of all kind of ill-treatment and abuse measures and practices, including discriminatory actions against any kind of minorities or people with special needs.

7. Improved police capabilities in the fight against crime, including by improved ability to use of intelligence-led policing tools (strategic threat analysis).

8. Improved access to Police services at district level in municipalities and towns and at local level in villages through implementation of community policing, especially with regard to gender and minors-related issues.

9. Improved cooperation at intra- (with the Service for Internal Protection and Anticorruption of MIA) and inter-institutional level (with the National Anticorruption Centre and Prosecutor’s General Office) on corruption prevention and combatting within the Police system.

Internal regulations and decisions adopted to reflect demilitarisation of the police and merit-based practices in human resources management.

No. of women serving in Police, including in senior management posts.

No. of reports with qualitative and quantitative data on police forces activities made publically available on MIA web-site.

No. of complaints from citizens received through all channels, and ratio of redress.

Average length of time taken to prepare case by prosecution.

No. of complaints officially recorded.

No. of investigations concluded on human rights violation cases.

No. and level of persons charged and sentenced with organised crime offences.

Value of counterfeit goods, drugs, arms etc. seized.

No. of convictions for trafficking, organised crime, smuggling and counterfeiting offences.

Inter-institutional coordination system on transfer of data between the Police and other law enforcement authorities established.

Convictions and complaints statistics from 2015.

Crime, traffic and public order incident statistics from 2015.

Police organigram and HR chart from 2015.

Police legal and regulatory framework from 2015.

Ratio of redress close to 35% by 2019 and ratio of investigations sent to court resulting in convictions close to 75% by 2019.

Rate of criminality reduced with at least 2% every year by 2019.

Number of women in Police force increased to 25% by 2019, including an increase of 50% of women in management posts.

Police HR legal and regulatory framework fully reviewed in line with EU best practices by 2019.

EU Progress Reports (including reports from EU Member States).

MIA reports and web-site.

CSO monitoring reports.

Court Reports.

Reports from Superior Council of Prosecutors and Magistrates.

Bar Association Reports.

Ombudsman’s Reports.

ECHR Reports.

ICC Reports.

Corruption Perception Index.

Barometer of Public Opinion.

Annual statistical data from National Bureau of Statistics.

Direct outputs

1. Operational Joint Law Enforcement Training Centre applying training curricula in line with EU and international standards and best practices (with emphasis on application of fundamental human rights, modern management techniques, and facilitated access of women).

2. Enhanced investment in physical infrastructure, logistics and supply needs for all police units (special and territorial) at central, regional and local levels and ensuring an equal, fair and tailor-made access of women officers to facilities and equipment.

3. Enhanced capacities of Moldovan Police to participate in international missions and EU crisis management operations.

4. Increased rate of investigations and arrests leading to convictions.

5. Improved conditions of temporary detention premises and interrogation rooms according to the international human rights standards, including access to recognition procedure.

6. Improved investigation and forensic capacities at central, regional and local levels.

7. Upgraded electronic registry of weapons respecting the personal data protection standards, including by introduction of a mechanism for marking weapons.

8. Improving the inter-institutional cooperation between Police and National Anti-corruption Centre on preventing and combating money laundering and financing of terrorism.

9. Enhanced operative and investigative rapid-reaction and intervention capacities of Police in emergency situations.

10. Enhanced capacities of Police in dealing with traffic safety and security (with an emphasis put on enhancing the communications skills), including the documentation and investigation of traffic accidents.

12. Enhanced police prevention capacities through development and implementation of community joint action plans on public awareness campaigns.

13. Enhanced capacities of corruption prevention and combating activities within the Police, especially for ensuring the professional integrity of public officials with police status and combating corruption within public procurement and misuse of budgetary and extra-budgetary funds.

No. of policemen trained, including female officers.

Criminal database for police investigations established according to EU standards.

No. of criminal laboratories equipped according to EU reference standards at central, regional and local levels.

No. of central, regional and local police inspectorates and units equipped and functioning according to EU best practices.

No. and % of arrests leading to convictions.

No. of temporary detention premises and interrogation rooms in line with the CoE Convention on Prevention of Torture standards.

Level of electronic registration and marking of weapons.

No. of joint anti-corruption and anti-money laundering investigations and operations between Police and National Anti-corruption Centre.

Reduced time for documentation and investigation of traffic incidents.

No. of cases initiated thanks to or through strategic or intelligence analysis (intelligence-led policing).

No. of joint action plans and events aiming raising awareness on prevention.

No. and level of members of the police (all units included) charged and sentenced for offences linked to corrupt behaviour or ill treatment cases.

Data on policemen trained, including female officers in 2015.

State of Carabineer Troops in 2015.

Convictions and complaints statistics from 2015.

Crime, traffic, corruption and public order incident statistics from 2015.

State of Police premises and facilities at central, regional and local level from 2015.

Joint Law Enforcement Training Centre fully functional by 2020.

All Police staff trained and equipped in line with best EU practices by 2019.

Carabineers fully integrated, trained and professionalised within Police by 2019.

Ratio of redress close to 35% by 2019 and ratio of investigations sent to court resulting in convictions close to 75% by 2019.

Rate of criminality reduced with at least 2% every year by 2019.

All Police premises and facilities at central, regional and local level renovated and equipped in line with best EU standards by 2019, including gender specific needs.

EU Progress Reports (including reports from EU Member States).

MIA reports and web-site.

CSO monitoring reports.

Court Reports.

Reports from Superior Council of Prosecutors and Magistrates.

Bar Association Reports.

Ombudsman’s Reports.

ECHR Reports.

ICC Reports.

Corruption Perception Index.

Barometer of Public Opinion.

Annual statistical data from National Bureau of Statistics.

Annex 1: Disbursement arrangements and timetable

This annex covers the following four main areas according to the country/intervention sector context: (1) responsibilities; (2) the indicative disbursement timetable; (3) the general conditions for each disbursement tranche; (4) the specific conditions for each disbursement tranche.

1. Responsibilities

On the basis of the disbursement conditions stipulated in the Financing Agreement, the Government of Moldova will send a formal request to the European Commission for the disbursement of each tranche in accordance with the timetable specified in Table A below. The request must include: (i) a full analysis and justification for payment of the funds, with the required supporting documents attached; (ii) a financial information form, duly signed, to facilitate the corresponding payment.

2. Indicative disbursement timetable

An indicative timetable is given below:

Table A: Indicative disbursement timetable (amounts in EUR million)

Country fiscal year[5]

2017

2018

2019

2020

2021

Total

Type of tranche

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Fixed

tranche

7

Variable tranche

10

12

10

12

Total

7

10

12

10

12

51

  1. General conditions for the disbursement of each tranche

The general conditions set out below for the disbursement of each tranche shall apply to the disbursement of all tranches and all tranche release requests must be accompanied by all appropriate information and documents.

Table B: General conditions for the release of tranches

Area

Conditions

Verification source

Public Policy

Satisfactory progress in the implementation of the Police reform strategy and continued credibility and relevance thereof.

  • Government of Moldova's reports on the implementation of the strategy.

Macroeconomic stability

Implementation of a credible stability-oriented macroeconomic policy.

  • Government of Moldova's reports.
  • EU, IMF, WB reports.

Public financial management

Satisfactory progress in the implementation of the programme to improve public financial management.

  • Government of Moldova's progress reports on the implementation of the strategy to improve PFM.
  • EU, SIGMA, IMF, WB reports

Budget Transparency

Satisfactory progress with regard to the public availability of accessible, timely, comprehensive, and sound budgetary information.

  • Official government documents and relevant websites.
  • Open budget related surveys and reports.

4. Specific conditions for the disbursement of tranches

The specific conditions for the disbursement set out in Table C shall apply to the disbursement of a specific tranche. Tranche release requests shall include evidence of compliance with each specific condition.

Table C: Specific conditions for the release of tranches

Budget Support

Components

2017

Performance Criteria

for the first variable tranche

Achievement by 31/12/2017

Assessment by March 2018

Disbursement by July 2018

2018

Performance Criteria

for the second variable tranche

Achievement by 31/12/2018

Assessment by March 2019

Disbursement by July 2019

2019

Performance Criteria

for the third variable tranche

Achievement by 31/12/2019

Assessment by March 2020

Disbursement by July 2020

2020

Performance Criteria

for the fourth variable tranche

Achievement by 31/12/2020

Assessment by March 2021

Disbursement by July 2021

A.1 Strengthening accountability, efficiency, transparency and professionalism of the police

A.1.1 - Improve human resources management (HRM) system to ensure transparent and merit-based selection, evaluation and promotion procedures.

A regulatory framework on transparent and merit-based selection, evaluation and promotion, with a view to securing a career path for sub-officers to the ranks of officers by annually recruiting a minimum of 25% of new officers from sub-officers, is adopted by the Ministry of Internal Affairs.

HRM units are regionalized and a minimum of three pilot units are equipped with and trained to use the HRM-related hardware and software.

All regional HRM units apply a single human resource management procedure.

Transparent and merit-based HRM system is in place; and the ratio of 40% officers/60% sub-officers within the police force is met.

Baseline:

  • In 2016, police forces consist of 9231 FTEs, with approx. 900posts or 10% unfilled.
  • Officers: 70% (6462 FTEs)

Sub-officers: 30% (2769 FTEs).

  • No career path from sub-officer to officer through internal evaluation/ competition.
  • HRM-units without streamlined criteria for selecting candidates to the police.

Means of verification:

  • Adopted Ministerial order
  • Police Career Guide published on MIA's General Police Inspectorate (GPI) website.

Means of verification:

  • One consolidated report on inspection missions' findings- and eventual recommendations - at selected HRM units.

Means of verification:

  • One consolidated report validated by MIA and including information on (i) the final version of the single HRM manual for the police force and (ii) its implementation in all regional HRM units as well as (iii) information on completed trainings.
  • One consolidated report on inspection missions' findings- and eventual recommendations - at selected HRM units.

Means of verification:

  • One consolidated report on inspection missions' findings- and eventual recommendations -at selected HRM units including evidence of changes in terms of transparency and merit in the HRM system in place.
  • Human resources-related statistics on the police force validated by the GPI and providing evidence of the achieved officers/sub-officers ratio.

A.1.2 – Increase women's participation in the police force

Action plan with a view to increasing the participation of women in the police force is established in cooperation with the Police Women's Association and adopted by the General Police Inspectorate (GPI).

Overall women participation in the police force increased to 16%.

Overall women participation in the police force increased to 18%.

A minimum of 20% of overall police staff are women and a minimum of 15% in officers' ranks are women.

Baseline:

  • The current percentage of women in the police force stands at 14%.

Means of verification:

  • GPI-adopted action plan published on GPI web-site
  • The opinion of the Police Women's Association on the action plan is published on MIA's website.

Means of verification:

  • Human resources-related statistics on women participation in the police force provided by GPI.
  • The opinion of the Police Women's Association on the progress in the annual implementation of the action plan is published on MIA website.

Means of verification:

  • Human resources-related statistics on women participation in the police force provided by GPI.
  • The opinion of the Police Women's Association on the progress in the annual implementation of the action plan is published on MIA website.

Means of verification:

  • Human resources-related statistics on women participation and ranking in the police force provided by GPI.
  • The opinion of the Police Women's Association on the progress in the implementation of the action plan since 2017 is published on MIA website.

A.1.3 - Improve the basic and in-service training capacities, with emphasis on human rights, modern management techniques and anti-corruption.

An action plan for establishing a Joint Law Enforcement Training Centre (JLETC) containing annual benchmarks is approved and published by the Government of the Republic of Moldova.

Action plan is executed as per the agreed annual benchmarks, management staff of JLETC is appointed and training curricula are established (16 weeks basic training for sub-officers and in-service trainings for officers and sub-officers).

The action plan is executed as per the agreed annual benchmarks, a 16 weeks basic training for sub-officers (minimum of 50 participants) is completed.

JLETC fully operational with two 16 weeks basic trainings for sub-officers (minimum of 200 participants trained) and at least 15 in-service trainings (minimum of 400 participants trained).

Baseline:

  • Officers: basic training is the prerogative of the Police Academy. An average of 150 officers per year graduate.
  • Sub-officers: no formal basic training. Training and recruitment standards on regional level are neither streamlined nor transparent and statistics are lacking.
  • No clear policy exists on in-service training for officers and sub-officers.
  • Concept note on the JLETC developed.

Means of verification:

  • Official decision transmitted by the Ministry of Internal Affairs (MIA)on the JLETC location.
  • Action plan approved and published by the Government of the Republic of Moldova.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i)achieved versus planned annual benchmarks, (ii) appointment of JLETC managers and (iii) JLETC training curricula.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of(i) achieved versus planned annual benchmarks, (ii) delivery of JLETC infrastructure, and(iii)completed basic training for sub-officers.

Means of verification:

  • One consolidated report on the implementation of the Action plan transmitted by MIA and including evidence of progress in terms of (i) achieved versus planned annual benchmarks, and (ii) completed trainings.

A.2 Ensuring fair, efficient and effective enforcement of the law through the application of a rights-based approach to policing

A.2.1 - Reduce ill-treatment, abuse and discrimination of people held in police custody

An action plan containing annual benchmarks aiming at establishing minimum standards for (a) police detention conditions and (b) police detainees' transportation conditions is adopted and published by the Government of the Republic of Moldova.

Action plan is executed as per the agreed annual benchmarks, procurement contracts required for refurbishing and equipping temporary detention isolators as well as for purchasing at least 25 specialized transportation vehicles for police detainees are signed.

Action plan is executed as per the agreed annual benchmarks, a minimum of 15 temporary detention isolators and 100 police cells are operational, a police custody training with at least 250 participants trained, and at least 25 specialized transportation vehicles for police detainees delivered.

Detention and transportation conditions for police detainees improved by completing the implementation of the minimum standards for (a) police detention conditions and (b) police detainees' transportation conditions as per the action plan.

Baseline:

  • Lack of adequate, dedicated space for temporary detention isolators (TDIs) and police cells of police stations (i.e. lacking infrastructures to set up private meetings with lawyers or medical personnel; lack of communication equipment to inform next of kin; lack of access to natural light and/or poor artificial light; problematic sanitary conditions; etc.).
  • Current curricula for police training lack sufficient attention to principles and rules governing police custody.
  • The 42 inspectorates operate transfer vehicles that are beyond their end-of-life cycle and not equipped to deal with aggressive detainees.

Means of verification:

  • Action plan adopted and published by the Government of the Republic of Moldova.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) achieved versus planned annual benchmarks, and (ii) signed contracts.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) achieved versus planned annual benchmarks, (ii) completed trainings and (iii) delivered vehicles/infrastructure.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and summarizing evidence of progress in terms of achieved versus planned benchmarks since 2017.
  • One consolidated report on the main achievements in the implementation of the action plan since 2017 is jointly produced by a working group composed of staff of MIA, EU Delegation and Civil Society Organisations. The report shall include the following initial statement:"The document reflects the opinion of the members of the working group only and does not necessarily reflect the position or the opinion of the respective organizations" and eventual differences of opinion shall be duly justified and reported.

A.3 Strengthening the police capacities to fight organized and cross-border crime

A.3.1 - Develop capacities to fight organized and cross-border crime including through increased crime scene investigation capacities.

An action plan containing annual benchmarks in view of setting up regional investigation units and reinforcing crime scene management capacities (evidence collection) is approved by the Ministry of Internal Affairs.

Action plan is executed as per the agreed annual benchmarks, a minimum of three regional investigation units are fully operational, a supplier for 30 crime scene investigation vehicles (evidence collection) is contracted.

Action plan is executed as per the agreed annual benchmarks, two additional regional investigation units are fully operational.

Improved crime scene investigation capacities.

Baseline:

  • 2 regional investigation units exist – other such units exist on the level of police inspectorates, but are deemed too small.
  • 5 regional forensic units (laboratories) exist and 1 to 2 forensic expert per inspectorate.
  • Basic infrastructure, equipment and training are lacking however.
  • Police force currently operates 8 mobile crime scene investigation vehicles and 5 more are expected.

Means of verification:

  • GPI Order regarding common standards for investigation units.
  • Action plan published on MIA website.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) achieved versus planned annual benchmarks, (ii) operational units and (iii) vehicles.
  • One consolidated annual report of MIA inspection of the regional investigation units.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) achieved versus planned annual benchmarks and (ii) operational units.
  • One consolidated annual report of MIA inspection of the regional investigation units.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and (i) summarizing evidence of progress in terms of achieved versus planned benchmarks since 2017, and providing evidence on (ii) improved crime scene investigation capabilities, and (iii) useof 30 crime scene investigation vehicles.

A.4 Setting up a modern police service in line with best European and international standards and practices, able to proactively and equally respond to

the needs of the community

A.4.1 Implement the community policing concept by improving physical and informational access to quality and equal police services across country.

Following consultation with civil society, a concept and an action plan on community policing are approved and published by the Government of the Republic of Moldova.

Evaluation of a pilot phase of at least 6 months in 5 selected police sectors, of which at least 2outside the capital.

A minimum of 200 police officers trained in community policing and a public promotion campaign on community policing is conducted in all 42 police inspectorates.

Improved implementation of the community policing and related in-service training (a minimum of 200 additional police officers trained).

Baseline:

  • First community policing centre for the general public in Chisinau opened in September 2016.
  • Old infrastructures and logistics: 45% or 90 police stations require capital improvements (ca. 31000€/station) and 41% or 84 police stations require cosmetic works (ca. 14000€/station).
  • No community policing-training exists.

Means of verification:

  • Evidence of consultation with civil society organizations (CSOs) before the finalisation of the Concept Note and the Action Plan
  • After consultation with CSOs, the approved concept note on community policing issued by the GPI is published in the GPI website.
  • Action plan approved and published by the Government of the Republic of Moldova.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of the achievements in the annual implementation of the action plan.
  • Pilot phase evaluation report validated by MIA.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including (i) evidence of progress in terms of the achievements in the annual implementation of the action plan,andquantitative and qualitative information on (ii) delivered training and (iii) public promotion campaign on community policing.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and (i) summarizing evidence of progress in terms of achievements in the implementation of the action plan since 2017,and providing evidence on achievements in (ii) infrastructure-related improvements in at least 90 police stations, and (iii)delivered trainings.

A.4.2 – Ensure reliable and effective communications for operational purposes within the police force.

Action plan containing annual benchmarks for the implementation of a secure voice and data communications network is approved by the Ministry of Internal Affairs, and a monitoring committee within the GPI is established.

A supply contract for purchasing, installing and maintaining a secure voice and data communications network is awarded.

A pilot phase with the selected network with at least three police inspectorates participating is completed and evaluated.

Secure communications system fully implemented.

Baseline:

  • TETRA-communication network exists only within the Chisinau police department.
  • Police vehicles can currently not be tracked.
  • Border police operates a dedicated TETRA-communication network.

Means of verification:

  • Action plan approved by the Ministry of Internal Affairs (MIA).
  • GPI Order on establishing a monitoring committee on the implementation of the network.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress on (i) the achievements in the annual implementation of the action plan and (ii) award of the supply contract.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of annual progress on the achievements in the annual implementation of the action plan.
  • Pilot phase evaluation report validated by MIA.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and (i) summarizing evidence of progress in terms of the achievements in the implementation of the action plan since 2017, and providing evidence that (ii) all fixed and mobile patrols are connected and tracked, and that (iii) the system is used in all police inspectorates.

A.4.3 - Strengthen the rapid-reaction capacities of the police intervention teams to emergency calls.

An action plan containing annual benchmarks with a view to improving logistics, equipment and training for dispatchers and intervention teams is adopted, including the concept of an Integrated System for Emergency Calls Management (ISECM).

Action plan is executed as per the agreed benchmarks, a minimum number of rapid intervention teams per administrative sector in Chisinau increased to 6 and in the police rayons outside Chisinau to at least 2.

Action plan is executed as per the agreed benchmarks, a 6 months pilot phase for ISECM in two principal urban centres and two rural areas, including in-service training on ISECM for all dispatchers, is completed and evaluated.

Maximum intervention time nationwide is reduced to 15 minutes by also increasing the number of rapid intervention teams per sector (a) in Chisinau (minimum 7 teams per administrative sector) and (b) 2 to 5 teams per police rayon outside Chisinau, with ISECM driven dispatching.

Baseline:

  • Recurring problems connecting emergency calls to dispatchers.
  • Chisinau is split in 5 sectors with 4 to 5 intervention teams each. This number is considered too low as it has an adverse effect on intervention times.
  • Outside Chisinau: average intervention time of 42 minutes.

Means of verification:

  • MIA-validated action plan including annual benchmarks and explaining the adopted ISECM conceptual analysis.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) the achievements in the annual implementation of the action plan, and (ii) transmitting the police organizational chart inclusive of intervention teams.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) the achievements in the annual implementation of the action plan, and (ii) delivered trainings.
  • Pilot phase evaluation report validated by MIA.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and (i) summarizing evidence of progress in terms of the achievements in the implementation of the action plan since 2017, (ii) providing evidence on intervention times at police department levels, and (iii) transmitting the latest police organizational chart inclusive of intervention teams.

A.5 Promoting and implementing the principle of zero tolerance to corruption in the police force

A.5.1 - Enhance capacities to prevent and combat corrupt behaviour within the police force, especially by targeting in-house anti-corruption capacities while improving motivation.

An action plan containing annual benchmarks with a view to setting up and reinforcing an institutional and regulatory anti-corruption structure within the police force is adopted.

Action plan is executed as per the agreed annual benchmarks, the police salary grid is adjusted to ensure that the lowest basic salary corresponds to at least 90% of the minimum subsistence cost as established by the National Bureau of Statistics.

Action plan is executed as per the agreed annual benchmarks, basic and in-service training on ethics and anti-corruption measures is delivered by the JLETC to a minimum of 250 participants.

Action plan is implemented as per the agreed annual benchmarks, the police salary grid is adjusted to ensure that the lowest basic salary corresponds to at least100% of the minimum subsistence cost as established by the National Bureau of Statistics.

Baseline:

  • Wide perception of corruption within the police force and a loss of prestige for the profession (e.g., public survey January 2016).
  • Lacking training, working conditions and extra-legal advantages (e.g. annual health check for police staff)
  • 2016 Police salary grid showing basic salaries ranging from min. 1160 MDL to max. 2150 MDL
  • 2015 min. subsistence cost (Nat. Bureau of Statistics): 1734 MDL

Means of verification:

  • Action plan approved by the Ministry of Internal Affairs
  • MIA Order on setting up reinforced anti-corruption structures at police level.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) the achievements in the annual implementation of the action plan, (ii) reinforced anti-corruption structures at police level, (iii) police salary grid 2018, and (iv) information on minimum subsistence cost published by the National Bureau of Statistics (NBS).

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and including evidence of progress in terms of (i) the achievements in the annual implementation of the action plan, (ii) reinforced anti-corruption structures at police level, and (iii) delivered trainings on ethics and anti-corruption.

Means of verification:

  • One consolidated report on the implementation of the Action plantransmitted by MIA and (i) summarizing evidence of progress in terms of the achievements in the implementation of the action plan since 2017, (ii) providing evidence on reinforced anti-corruption structures at police level, (iii) police personnel salary grid 2020, and (iv) information on NBS-published minimum subsistence cost.

5. Variable tranche calculation

The programme foresees four variable annual tranches. The variable tranches will be paid depending on compliance with the General Conditions and the Specific Conditions. Once the compliance with the General Conditions (Eligibility Criteria) has been positively assessed by the European Commission, the variable tranche will then be assessed and paid by the European Commission according to the level of compliance with each of the Specific Conditions.

Each Specific Condition is scored 0, 0.5 or 1 depending on whether there was (i) no or minor progress, (ii) significant but partial progress, or (iii)indicators/targets met, respectively. The total amount for disbursement under each variable tranche consists of the sum of the achievements (0, 0.5 or 1) related to each Specific Condition and their respective financial value as summarized in Table D (Weights of Specific Conditions in tranches and timetable) below. In any case, the final decision on the degree of compliance with the General Conditions/Eligibility Criteria and the Specific Conditions rests with the European Commission.

Table D: Weights of Specific Conditions in Tranches and Timetable

Tranches

1st variable tranche

Achievement by 31/12/2017

Assessment by March 2018

Disbursement by July 2018

2nd variable tranche

Achievement by 31/12/2018

Assessment by March 2019

Disbursement by July 2019

3rd variable tranche

Achievement by 31/12/2019

Assessment by March 2020

Disbursement by July 2020

4th variable tranche

Achievement by 31/12/2020

Assessment by March 2021

Disbursement by July 2021

Specific Conditions

Financial allocation per Specific Condition for variable tranches

A.1.1

0.3million €

0.3 million €

0.7 million €

0.3 million €

A.1.2

0.2million €

0.2million €

0.3million €

0.2million €

A.1.3

2 million €

2.5 million €

2 million €

2 million €

A.2.1

0.5 million €

0.5 million €

0.5 million €

0.5 million €

A.3.1

0.5 million €

1 million €

0.5 million €

1 million €

A.4.1

0.5 million €

1.5 million €

1 million €

2 million €

A.4.2

2 million €

1.5 million €

1.5 million €

2 million €

A.4.3

1 million €

1.5 million €

1 million €

1 million €

A.5.1

1 million €

1 million €

0.5 million €

1 million €

Carabineer Reserve[6]

2 million €

2 million €

2 million €

2 million €

TOTAL Tranches

10 million €

12 million €

10 million €

12 million €

ANNEX II - GENERAL CONDITIONS

Part One: Provisions Applicable to Activities for which the
Partner Country is the Contracting Authority

Article 1 - General principles

  1. The purpose of Part One is to define the tasks entrusted to the Partner Country in indirect management as described in Annex I (Technical and Administrative Provisions) and to define the rights and obligations of the Partner Country and of the Commission in carrying out these tasks.

Part One shall apply to the tasks related to the EU contribution alone or in combination with the funds of the Partner Country or of a third party where such funds are implemented in joint co­financing, i.e. where they are pooled.

These tasks encompass the implementation by the Partner Country as contracting authority of procurement and grant award procedures, and the awarding, signing and enforcing the resulting procurement and grant contracts.

The designation of entities pertaining to the Partner Country's government or administrative structure and identified in Annex I (Technical and Administrative Provisions) to carry out certain tasks, does not qualify as sub-delegation. Such entities shall respect the rights and obligations laid down in Part One for the Partner Country as contracting authorities, while at the same time the Partner Country remains fully responsible for the fulfilment of the obligations stipulated in this Financing Agreement. References in the Financing Agreement to Partner Country also encompass those entities.

As contracting authority, the Partner Country shall act under Partial delegation, unless if it acts under the Imprest component of a programme estimate or under a Partner Country managed Pool fund:

Where the Partner Country is an ACP State and the action is financed by the EDF pursuant to

Article 1.1 of the Special Conditions, the tasks entrusted shall be those listed in points (c) to (k) of the sixth subparagraph of Article 35(1) and in Article 35(2) of Annex IV to the ACP-EC Partnership Agreement

Where the Partner Country is an OCT and the action is financed by the EDF pursuant to Article

  1. of the Special Conditions, the implementation of tasks entrusted shall also respect the conditions of Article 86(3) of Council Decision 2013/755/EU of 25 November 2013 on the association of the overseas countries and territories with the European Union (Overseas Association Decision).
  2. The Partner Country shall remain responsible for the fulfilment of the obligations stipulated in this Financing Agreement even if it designates other entities identified in Annex I (Technical and Administrative Provisions) to carry out certain tasks. The Commission, in particular, reserves the right to suspend payments, and to suspend and/or terminate this Financing Agreement on the basis of the acts, omissions and/or situations of any designated entity.
  3. The Partner Country shall set up and ensure the functioning of an effective and efficient internal control system. The Partner Country shall respect the principles of sound financial management, transparency and non-discrimination and avoid situations of conflict of interest.

A conflict of interest exists where the impartial and objective exercise of the functions of any responsible person is compromised for reasons involving family, emotional life, political or national affinity, economic interest or any other shared interest with a tenderer or applicant, or contractor or grant beneficiary.

Internal control system is a process aimed at providing reasonable assurance that operations are effective, efficient and economical, that the reporting is reliable, that assets and information are safeguarded, that fraud and irregularities are prevented, detected and corrected, and that risks relating to the legality and regularity of the financial operation are adequately managed, taking into account the multiannual character of the activities as well as the nature of the payments concerned.

In particular, where the Partner Country carries out payments under the Imprest component of a programme estimate or in the framework of a Pool Fund managed by the Partner Country, the functions of the authorising and accounting officers shall be segregated and mutually incompatible and the Partner Country shall operate an accounting system that provides accurate, complete, reliable and timely information.

  1. Outside the cases where the Partner Country applies its own (including in the case of a Pool Fund, those agreed upon by the Pool Fund's donors) procedures and standard documents for the award of procurement contracts and grant contracts, the Partner Country shall conduct the award procedures and conclude the resulting contracts and agreements in the language of this Financing Agreement.
  2. The Partner Country shall take the necessary measures to ensure the visibility of EU funding for the activities entrusted to it or for other activities under this action. These measures shall either be defined in Annex I (Technical and Administrative Provisions) or shall be agreed later between the Partner Country and the Commission.

These communication and information measures shall comply with the Communications and Visibility Manual for EU External Actions laid down and published by the Commission, in force at the time of the measures.

  1. Under Partial delegation and under the Imprest component of a programme estimate, the Partner Country shall keep all relevant financial and contractual supporting documents from the date of the entry into force of this Financing Agreement or as from an earlier date which is stipulated as the start date of cost eligibility in Article 6 of the Special Conditions for five years as from the end of the execution period, in particular, the following:

Procurement procedures:

  1. Forecast notice with proof of publication of the procurement notice and any corrigenda
  2. Appointment of shortlist panel
  3. Shortlist report (incl. annexes) and applications
  4. Proof of publication of the shortlist notice
  5. Letters to non-shortlisted candidates
  6. Invitation to tender or equivalent
  7. Tender dossier including annexes, clarifications, minutes of the meetings, proof of publication
  8. Appointment of the evaluation committee
  9. Tender opening report, including annexes
  10. Evaluation / negotiation report, including annexes and bids received[7]
  11. Notification letter
  12. Supporting documents
  13. Cover letter for submission of contract
  14. Letters to unsuccessful candidates
  15. Award / cancellation notice, including proof of publication
  16. Signed contracts, amendments, riders and relevant correspondence Calls for proposals and direct award of grants:
  17. Appointment of the evaluation committee
  18. Opening and administrative report including annexes and applications received[8]
  19. Letters to successful and unsuccessful applicants following concept note evaluation
  20. Concept note evaluation report
  21. Evaluation report of the full application or negotiation report with relevant annexes f Eligibility check and supporting documents
  22. Letters to successful and unsuccessful applicants with approved reserve list following full application evaluation
  23. Cover letter for submission of grant contract

1. Award/cancellation notice with proof of publication

j. Signed contracts, amendments, riders and relevant correspondence.

  1. The Partner Country shall ensure an appropriate protection of personal data. Personal data means any information relating to an identified or identifiable natural person. Any operation involving the processing of personal data, such as collection, recording, organisation, storage, adaption or alteration, retrieval, consultation, use, disclosure, erasure or destruction, shall be based on rules and procedures of the Partner Country and shall only be done as far as it is necessary for the implementation of this Financing Agreement.

In particular, the Partner Country shall take appropriate technical and organisational security measures concerning the risks inherent in any such operation and the nature of the information relating to the natural person concerned, in order to:

  1. Prevent any unauthorised person from gaining access to computer systems performing such operations, and especially unauthorised reading, copying, alteration or removal of storage media; unauthorised data input as well as any unauthorised disclosure, alteration or erasure of stored information;
  2. Ensure that authorised users of an IT system performing such operations can access only the information to which their access right refers;
  3. Design its organisational structure in such a way that it meets the above requirements.

Article 2 - Deadline for the signature of contracts and agreements by the Partner Country

  1. The procurement contracts and grant contracts shall be signed during the operational implementation phase of this Financing Agreement.

When implementing co-financed actions, the procurement contracts and grant contracts shall be concluded within the contracting deadline set out in the Special Conditions or set out for the imprest component of the programme estimate.

When the Action is not co-financed, procurement contracts and grant contracts shall be concluded at the latest within three years of the entry into force of this Financing Agreement.

Additional procurement contracts and grant contracts resulting from an amendment of this Financing Agreement which adds new activities and increases the EU contribution, shall be signed at the latest within three years of the entry into force of that amendment of this Financing Agreement, or for co-financed actions within the fixed contracting deadline.

The three years-deadline for non-cofinanced actions may not be extended, except when the action is financed by the EDF. In such cases, the extension shall be stipulated in Article 6 of the Special Conditions.

  1. However, the following transactions may be signed at any time during the operational implementation phase:
  2. amendments to procurement contracts and grant contracts already signed;
  3. individual procurement contracts to be concluded after early termination of existing procurement contracts;
  4. contracts relating to audit and evaluation, which may also be signed during the closure phase;
  5. operating costs referred to in Article 5.1;
  6. After expiry of the deadlines referred to in Article 2.1, the financial balance for the related activities entrusted to the Partner Country for which contracts have not been duly signed shall be decommitted by the Commission.
  7. No such decommitment shall apply to the funds budgeted for audit and evaluations referred to in Article 2.2.c) or the operating costs referred to in Article 2.2.d).

Likewise, no such decommitment shall apply to any financial balance of the contingency reserve or to funds available again after early termination of a contract referred to in Article 2.2.b), which both may be used to finance contracts referred to in Article 2.2.

Article 3 - Exclusion and administrative sanctions

  1. Exclusion criteria
  2. When applying the procedures and standard documents laid down and published by the Commission for the award of procurement and grant contracts, the Partner Country shall accordingly ensure:
  1. has misrepresented the information required as a condition of participation in the procedure or has failed to supply that information;
  2. was previously involved in the preparation of procurement documents where this entails a distortion of competition that cannot be remedied otherwise.

a) is bankrupt, subject to insolvency or winding-up procedures or in any analogous situation arising from a similar procedure provided for under national laws or regulations;

  1. is by final judgment or final administrative decision declared to be in breach of its obligations relating to the payment of taxes or social security contributions.
  2. is by final judgment or final administrative decision declared to be guilty of grave professional misconduct;
  3. is by final judgment declared to be guilty of fraud, corruption, participation in a criminal organisation, money laundering, terrorist-related offences, child labour or trafficking in human beings;
  4. has shown significant deficiencies in complying with main obligations in the performance of an EU financed contract;
  5. is by final judgment or final administrative decision declared to have committed an irregularity affecting the EU's financial interest.
  6. When applying its own (including, in the case of a Pool Fund, those agreed upon by the Pool Fund's donors) procedures and standard documents for the award of procurement and grant contracts, the Partner Country shall adopt measures, in accordance with its own national legislation, to ensure that no EU financed procurement or grant contract is awarded to an economic operator or grant applicant who is in one of the situations referred to in Article 3.1.1, 1st indent, a), Article 3.1.1, 2nd indent, d) and Article 3.1.1, 2nd indent, f).

The Partner Country may take into account, as appropriate and on its own responsibility, the information contained in the Commission's Early Detection and Exclusion System when awarding procurement and grant contracts. Access to the information can be provided through the liaison point(s) or via consultation to the Commission (European Commission, Directorate- General for Budget, Accounting Officer of the Commission, BRE2-13/505, B-1049 Brussels, Belgium and by email to BUDG-C01 -EXCL-DB@ec.europa.eu in copy to the Commission address identified in Article 3 of the Special Conditions). The Commission may refuse payments to a contractor or grant beneficiary in an exclusion situation.

  1. Information duty

The Partner Country shall inform the Commission when an economic operator or grant applicant is in a situation referred to in Article 3.1, or has committed irregularities and fraud, or has been found in serious breach of its contractual obligations.

  1. Administrative sanctions

Where the Partner Country becomes aware of one of the situations referred to in Article 3.1 in the implementation of the tasks described in Annex I, the Partner Country shall, under the conditions of its national legislation, impose upon the economic operator or grant applicant, an exclusion from its future procurement or grant award procedures and/or a financial penalty proportional to the value of the contract concerned. Such financial penalties or exclusions shall be imposed following an adversarial procedure ensuring the right of defence of the person concerned.

With respect to the first paragraph, the Partner Country is considered in failure to act, among others, where:

In case of such failures, the Partner Country will notify its impediment to the Commission. The Commission may decide to impose an exclusion from future EU financed award procedures and/or a financial penalty between 2 % and 10 % of the total value of the contract concerned.

Article 4 - Partial delegation

Award procedures

  1. The tasks shall be carried out by the Partner Country in accordance with the procedures and standard documents laid down and published by the Commission for the award of procurement contracts and grant contracts, in force at the time of the launch of the procedure in question.

Ex ante control

  1. To allow ex ante control, the Partner Country shall submit tender dossiers and documents for calls for proposals, to the Commission for approval before launching invitations to tender and calls for proposals. Likewise, the Partner Country shall invite the Commission to the opening of tenders and proposals, and shall provide the Commission with copies of tenders and proposals received. The Partner Country shall notify the Commission of the results of the examination of tenders and proposals and shall submit the award proposal, as well as the draft procurement contracts and grant contracts to the Commission for approval.

During the implementation of the procurement contracts and grant contracts, the Partner Country shall equally submit draft addenda and draft administrative orders thereto, to the Commission for prior approval.

The Partner Country shall invite the Commission for provisional and final acceptance.

Report

  1. If Article 5 of the Special Conditions so provides, the report on the implementation of the tasks entrusted to the Partner Country shall follow the template provided in Annex III and the management declaration shall follow the template provided in Annex IV. An independent external audit opinion on the management declaration, performed in accordance with internationally accepted auditing standards, does not have to be provided in this case as the Commission shall conduct the audits for this action. These audits will verify the truthfulness of the assertions made in the management declaration and the legality and regularity of the underlying transactions made.

Payment procedures

  1. The Partner Country shall provide the Commission with the approved payment requests within the following deadlines, starting from the date of receipt of the payment request, not counting the periods of suspension of the time-limit for payment:

(a) for pre-financing specified in the procurement contract and grant contract:

  1. 15 calendar days for an action financed under the Budget;
  2. 30 calendar days for an action financed under the EDF;

b) 45 calendar days for other payments

The Commission shall act in accordance with Articles 4.9 and 4.10 within the period amounting to the time-limit for payment provided for in the procurement contract and grant contracts minus the above deadlines.

  1. Upon receipt of a payment request from a contractor or grant beneficiary, the Partner Country shall inform the Commission of its receipt and shall immediately examine whether the request is admissible, i.e. whether it contains the identification of that contractor or grant beneficiary, the contract or agreement concerned, the amount, the currency and the date. If the Partner Country concludes that the request is inadmissible, it shall reject it and inform the contractor or grant beneficiary of this rejection and of its reasons within 30 days of receipt of the request. The Partner Country shall also inform the Commission of this rejection and its reasons.
  2. Upon receipt of an admissible payment request, the Partner Country shall examine whether a payment is due, i.e. whether all contractual obligations justifying the payment have been fulfilled, including examining a report, where applicable. If the Partner Country concludes that a payment is not due, it shall inform the contractor or grant beneficiary thereof and of the reasons. The dispatch of this information suspends the time-limit for payment. The Commission shall receive a copy of the information so dispatched. The Commission shall also be informed of the reply or corrective action of the contractor or grant beneficiary. That reply or action aimed at correcting the non-compliance with its contractual obligations shall restart the time-limit for payment. The Partner Country shall examine this reply or action pursuant to this paragraph.
  3. If the Commission disagrees with the Partner Country's conclusion that a payment is not due, it shall inform the Partner Country thereof. The Partner Country shall re-examine its positions and, if it concludes that the payment is due, it shall inform thereof the contractor or grant beneficiary. The suspension of the time-limit for payment shall be lifted upon dispatch of this information. The Partner Country shall also inform the Commission. The Partner Country shall further proceed as provided for in Article 4.8.

If disagreement between the Partner Country and the Commission persists, the Commission may pay the undisputed part of the invoiced amount provided that it is clearly separable from the disputed amount. It shall inform the Partner Country and the contractor or grant beneficiary of this partial payment.

  1. Where the Partner Country concludes that the payment is due, it shall transfer the payment request and all necessary accompanying documents to the Commission for approval and payment. It shall provide an overview of how many days of the time-limit for payment are left and of all periods of suspension of this time-limit.
  2. After transfer of the payment request pursuant to Article 4.8, if the Commission concludes that the payment is not due, it shall inform the Partner Country and, in copy, the contractor or grant beneficiary thereof and of the reasons. Informing the contractor or grant beneficiary shall have the effect of suspending the time-limit for payment, as provided for in the contract concluded. A reply or corrective action of the contractor or grant beneficiary shall be treated by the Partner Country in accordance with Article 4.6.
  3. Where the Partner Country and the Commission conclude that the payment is due, the Commission shall execute the payment.
  4. Where late-payment interest is due to the contractor or grant beneficiary, it shall be allocated between the Partner Country and the Commission pro rata to the days of delay in excess of the time limits stipulated in Article 4.4, subject to the following:
  5. the number of days used by the Partner Country is calculated from the date of the registration of an admissible payment request referred to in Article 4.6 to the date of the transfer of the request to the Commission referred to in Article 4.8 and from the date of information by the Commission referred to Article 4.9 to the following transfer of the request to the Commission referred to in Article 4.8. Any period of suspension of the time-limit for payment shall be deducted.
  6. the number of days used by the Commission is calculated from the date following that of transfer of the request by the Partner Country referred to in Article 4.8 to the date of payment and from the date of transfer to the date of informing the Partner Country pursuant to Article 4.9.
  7. Any circumstances unforeseen by the above procedure shall be solved in a spirit of cooperation between the Partner Country and the Commission by analogy to the above provisions while respecting the contractual relations of the Partner Country with the contractor or grant beneficiary.

Where feasible, one party shall cooperate at the request of the other party in providing useful information for the assessment of the payment request, even before the payment request is formally transferred to or returned from the first party.

  1. A procurement contract or grant contract which has not given rise to any payment within two years of its signature shall be automatically terminated and its funding shall be decommitted, except in case of litigation before judicial courts or arbitral bodies.

Article 5 - Imprest component of the programme estimate

Application

  1. The programme estimate is a document laying down the programme of activities to be carried out and the human and material resources required, the corresponding budget and the detailed technical and administrative implementing arrangements for the execution of these operational activities over the operational implementation phase of this Financing Agreement.

The programme estimate implementing the Financing Agreement must respect the procedures and standard documents concerning programme estimates laid down by the Commission, in force at the time of the adoption of the programme estimate in question.

The body implementing those operational activities within the programme estimate, may be the central government of the Partner Country itself (central operations) or a commissioned public law or private law body with a public-service mission (public commissioned operations) or, under EDF only, a private law body without a public-service mission on the basis of a service contract (private commissioned operations).

The programme estimate shall have an Imprest component and may have a component of specific commitments.

Under the component of specific commitments, Article 4 shall apply.

Under the Imprest component of the programme estimate, the implementing body may, up to established thresholds, conduct procurement and grant award procedures without or with limited ex ante control of the Commission and execute payments to the contractors and grant beneficiaries, as well as in the context of direct labour.

Direct labour relates to the operational activities which the implementing body executes directly using staff it employs and/or its existing resources (machinery, equipment, other inputs).

The operating costs incurred by the implementing body may be eligible for EU financing under the Imprest component of the programme estimate. If so, they shall be eligible for EU financing during the entire duration of the execution period of this Financing Agreement, unless an earlier start of cost eligibility is stipulated in Article 6 of the Special Conditions. Operating costs are costs of the implementing body incurred in carrying out implementation tasks and include local staff, utilities (e.g. water, gas, and electricity), rental of premises, consumables, maintenance, short-term business trips and fuel for vehicles. They shall not include procurement of vehicles or of any other equipment, or any operational activity. Such ordinary operating costs may be charged and paid in accordance with the implementing body's own procedures.

Award procedures

  1. Under the Imprest component of the programme estimate, the implementing body may carry out, totally or partially, the award procedures for procurement and grant contracts in accordance with its own procedures and standard documents, to the extent that prior evidence is obtained by the Commission that the Partner country's implementing body:

To the extent that no such evidence is obtained, the award procedures for procurement and grant contracts shall be carried out by the implementing body in accordance with the procedures and standard documents laid down and published by the Commission, in force at the time of the launch of the procedure in question.

Ex ante control

  1. Under the Imprest component, unless the Technical and Administrative Arrangements of the programme estimate stipulate otherwise, the implementing body shall submit to the Commission for prior approval, the tender dossiers and proposals for award decision of procurement contracts whose value exceeds 100,000 EUR, as well as all guidelines for applications and proposals for award decisions of grant contracts, which follow the procedures and standard documents laid down and published by the Commission.

In addition to the record-keeping obligations laid down in Article 1.6 of these General Conditions, the Partner Country shall, during the same period, keep all relevant financial and contractual supporting documents.

Management declaration

  1. The Partner Country shall submit to the Commission annually, by the date stipulated in Article 6 of the Special Conditions, a management declaration signed by the Partner Country using the template in Annex IV.

An independent external audit opinion on the management declaration, performed in accordance with internationally accepted auditing standards, does not have to be provided in this case as the Commission shall conduct the audits for this action. These audits will verify the truthfulness of the assertions made in the management declaration and the legality and regularity of the underlying transactions made.

Payments

  1. The Commission shall transfer the first pre-financing instalment, upon signature of the programme estimate by all parties, within 60 calendar days where the programme estimate is financed by the EDF and 30 calendar days where it is financed from the EU Budget,

The Commission shall pay the further pre-financing instalments within 60 calendar days of receiving and approving the payment request and its reports.

Late-payment interest shall be due pursuant to the applicable Financial Regulation. The time­limit for the payment may be suspended by the Commission by informing the Partner Country, at any time during the period referred to above, that the payment request cannot be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request comes to the notice of the Commission, the Commission may suspend the time­limit for the payment for the purpose of further verification, including an on-the-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible. The suspension and the reasons for it shall be communicated to the Partner Country as soon as possible. The time­limit for the payment shall resume once the missing supporting documents have been provided or the payment request has been corrected.

  1. The Commission shall make payments to a bank account opened at a financial institution accepted by the Commission.
  2. The Partner Country shall guarantee that funds paid by the Commission can be identified in this bank account.
  3. Transfers in euro shall, if necessary, be converted into the Partner Country's national currency as and when payments have to be made by the Partner Country, at the bank rate in force on the day of payment by the Partner Country.
  4. The Imprest component of the programme estimate which has not given rise to any payment to the Partner Country within two years of the conclusion of the programme estimate shall be automatically terminated, and its funding shall be decommitted. For actions financed under the EDF, an extension of that deadline may be stipulated in Article 6 of the Special Conditions.

Article 6 - Pool Fund managed by the Partner Country Application

  1. The Partner Country managing a Pool Fund, may be eligible for an EU Contribution to that Pool Fund, to the extent that prior evidence is obtained by the Commission that the managing entity within the Partner Country:

Award procedures

  1. Under the EU Contribution to a Partner Country managed Pool Fund, the managing entity within the Partner Country shall carry out the tasks in accordance with its own procedures and standard documents for the award of procurement and grant contracts, or with those agreed upon among the donors.

Implementation

  1. In the case of an EU Contribution to a Partner Country managed Pool Fund, in addition to the rights and obligations already laid down in these General Conditions, further rules detailed in

Annex V to the Financing Agreement shall apply to the Partner Country for the implementation of the EU Contribution to the Pool Fund.

Article 7 - Publication of information on procurement and grant contracts by the Partner Country

  1. The Partner Country undertakes to publish each year in a dedicated and easily accessible place of its internet site, for each procurement and grant contract for which it is contracting authority under the Imprest Component of the programme estimate referred to in Article 5 and the Pool Funds referred to in Article 6, its nature and purpose, the name and locality of the contractor (contractors in case of a consortium) or grant beneficiary (grant beneficiaries in case of a multi­beneficiary grant), as well as the amount of the contract.

The locality of a natural person shall be a region at NUTS2 level. The locality of a legal person shall be its address.

If such internet publication is impossible, the information shall be published by any other appropriate means, including the official journal of the Partner Country.

Article 6 of the Special Conditions shall stipulate the location, on the internet or otherwise, of the place of publication; reference shall be made to this location in the dedicated place of the internet site of the Commission.

  1. Scholarships and direct financial support to natural persons most in need shall be published anonymously and in an accumulated manner by category of expenditure.

Otherwise, names of natural persons shall be replaced by "natural person" two years after publication. The name of a legal entity containing that of a natural person involved in this entity shall be treated as a natural person's name.

Publication of names of natural persons shall be waived if such publication risks violating their fundamental rights or damaging their commercial interests.

The Partner Country shall present a list of data to be published on natural persons with any justifications for proposed waivers of publication to the Commission which must grant prior authorisation to this list. Where necessary, the Commission shall complete the locality of the natural person limited to a region at NUTS2 level.

  1. Publication of the procurement and grant contracts concluded (i.e. signed by the Partner Country and the contractor or grant beneficiary) during the reporting period shall take place within six months following the date for submitting the report pursuant to Article 6 of Special Conditions.
  2. Publication of contracts may be waived if such publication risks harming the commercial interests of contractors or grant beneficiaries. The Partner Country shall present a list with such justifications to the Commission which must grant prior authorisation to such publication waiver.
  3. Where the Commission carries out payments to contractors or grant beneficiaries pursuant to Article 4, it shall ensure the publication of information on procurement contracts and grant contracts according to its rules.

Article 8 - Recovery of funds

  1. The Partner Country shall take any appropriate measures to recover the funds unduly paid.

Amounts unduly paid and recovered by the Partner Country, amounts from financial guarantees lodged on the basis of procurement and grant award procedures, amounts from financial penalties imposed by the Partner Country, as well as damages awarded to the Partner Country shall be returned to the Commission.

  1. Without prejudice to the above responsibility of the Partner Country to recover funds unduly paid, the Partner Country agrees that the Commission may, in accordance with the provisions of the Financial Regulation applicable and this Financing Agreement, formally establish an amount as being unduly paid under procurement contracts and grant contracts financed under Part One and proceed to its recovery by any means on behalf of the Partner Country, including by offsetting the amount owed by the contractor or grant beneficiary against any of its claims against the EU and by forced recovery before the competent courts.
  2. To this end, the Partner Country shall provide to the Commission all the documentation and information necessary. The Partner Country hereby empowers the Commission to carry out the recovery in particular by calling on a guarantee of a contractor or grant beneficiary of which the Partner Country is the contracting authority or by offsetting the funds to be recovered against any amounts owed to the contractor or grant beneficiary by the Partner Country as contracting authority and financed by the EU under this or another Financing Agreement or by forced recovery before the competent courts.
  3. The Commission shall inform the Partner Country that the recovery proceedings have been initiated (including where necessary before a national court).
  4. Where the Partner Country is a grant beneficiary, subdelegatee or implementing partner of an entity with which the Commission concluded a delegation agreement, the Commission may recover funds from the Partner Country which are due to the entity but which the entity was not able to recover itself.

Article 9 - Financial claims under contracts and agreements

The Partner Country undertakes to confer with the Commission before taking any decision concerning a request for compensation made by a contractor or grant beneficiary and considered by the Partner Country to be justified in whole or in part. The financial consequences may be borne by the EU only where the Commission has given its prior authorisation. Such prior authorisation is also required for any use of funds committed under the present Financing Agreement to cover costs arising from disputes relating to contracts or agreements.

Article 10 - Cost overruns and ways of financing them

  1. Individual overruns of the budget headings of the activities implemented by the Partner Country shall be dealt with by reallocating funds within the overall budget, in accordance with Article 25 of these General Conditions.
  2. Wherever there is a risk of overrunning the amount foreseen for the activity implemented by the Partner Country, the Partner Country shall immediately inform the Commission and seek its prior authorisation for the corrective activities planned to cover the overrun, proposing either to scale down the activities or to draw on its own or other non-EU resources.
  3. If the activities cannot be scaled down, or if the overrun cannot be covered either by the Partner Country's own resources or other resources, the Commission may, at the Partner Country's duly substantiated request, decide to grant additional EU financing. Should the Commission take such a decision, the excess costs shall be financed, without prejudice to the relevant EU rules and procedures, by the release of an additional financial contribution to be set by the Commission. This Financing Agreement shall be amended accordingly.

Part Two: Provisions Applicable to Budget Support

Article 11 - Policy dialogue

The Partner Country and the EU commit to engage in a regular constructive dialogue at the appropriate level on the implementation of this Financing Agreement.

Where the Partner Country is an ACP State and this action is financed under the EDF pursuant to Article 1.1 of the Special Conditions, this dialogue may form a part of the broader political dialogue provided for in Article 8 of the ACP-EC Partnership Agreement.

Article 12 - Verification of conditions and disbursement

  1. The Commission shall verify the conditions for the payment of the tranches of the budget support component, as identified in Annex I (Technical and Administrative Provisions).

Where the Commission concludes that the conditions for payment are not fulfilled, it shall inform the Partner Country thereof without undue delay.

  1. Disbursement requests submitted by the Partner Country shall be eligible for EU financing provided that they are in accordance with the provisions set out in Annex I (Technical and Administrative Provisions) and that they are submitted during the operational implementation phase.
  2. The Partner Country shall apply its national foreign exchange regulations in a non- discriminatory manner to all disbursements of the budget support component.
  3. If no payment to the Partner Country is made within two years of the entry into force of this Financing Agreement, its budget support component shall be automatically terminated and its funding shall be decommitted. For actions financed under the EDF, an extension of that deadline may be stipulated in Article 6 of the Special Conditions.

Article 13 - Transparency of budget support

The Partner Country hereby agrees to the publication by the Commission, of this Financing Agreement and any amendment thereof, including by electronic means, and of such basic information on the budget support which the Commission deems appropriate. Such publication shall not contain any data in violation of the EU laws applicable to the protection of personal data.

Article 14 - Recovery of budget support

All or part of the budget support disbursements may be recovered by the Commission, with due respect to the principle of proportionality, if the Commission establishes that payment has been vitiated by a serious irregularity attributable to the Partner Country, in particular if the Partner Country provided unreliable or incorrect information, or if corruption or fraud was involved.

Part Three: Provisions Applicable to this Action as a Whole,
Irrespective of the Management Mode

Article 15 - Execution period and contracting deadline

  1. The execution period of this Financing Agreement shall comprise two phases:

These periods shall be reflected in the agreements to be concluded by the Partner Country and by the Commission in the implementation of this Financing Agreement, in particular in delegation agreements and procurement and grant contracts.

  1. Costs related to the operational activities shall be eligible for EU financing only if they have been incurred during the operational implementation phase; the costs incurred before the entry into force of this Financing Agreement shall not be eligible for EU financing unless provided otherwise in Article 6 of the Special Conditions. Costs related to final audits and evaluation, to closure activities and operating costs referred to in Article 5.1 shall be eligible until the end of the closure phase.
  2. Any balance remaining from the EU contribution shall be automatically decommitted no later than six months after the end of the execution period.
  3. In exceptional and duly substantiated cases, a request may be made for the extension of the operational implementation phase or the closure phase, as well as correlatively of the execution period. If agreed upon, the Financing Agreement shall be amended accordingly.
  4. Article 2 of these General Conditions shall apply to procurement contracts and grant contracts awarded by the Commission as contracting authority (direct management) with the exception of the last subparagraph of Article 2.1.

Delegation Agreements concluded by the Commission are subject to a different contracting deadline set out by the EU Financial Regulation. If after expiry of that deadline, the related funds are to be de-committed, the Commission will duly inform the Partner Country thereof.

Article 16 - Verifications and checks bv the Commission, the European Anti-Fraud Office (OLAF) and the European Court of Auditors

  1. The Partner Country shall assist and support the verifications and checks carried out by the Commission, OLAF and the European Court of Auditors at their request.

The Partner Country agrees to the Commission, OLAF and the European Court of Auditors conducting documentary and on-the-spot controls on the use made of EU financing under the activities under this Financing Agreement and carrying out a full audit, if necessary, on the basis of supporting documents of accounts and accounting documents and any other documents relating to the financing of the activities, throughout the duration of this Financing Agreement and for five years from the end of the execution period.

  1. The Partner Country also agrees that OLAF may carry out on-the-spot checks and verifications in accordance with the procedures laid down by EU law for the protection of the EU's financial interests against fraud and other irregularities.

To that end, the Partner Country shall grant officials of the Commission, OLAF and the European Court of Auditors and their authorised agents access to sites and premises at which operations financed under this Financing Agreement are carried out, including their computer systems, and to any documents and computerised data concerning the technical and financial management of those operations, and to take every appropriate measure to facilitate their work. Access by authorised agents of the Commission, OLAF and the European Court of Auditors shall be granted on conditions of strict confidentiality with regard to third parties, without prejudice to public law obligations to which they are subject. Documents must be accessible and filed in a manner permitting easy inspection, the Partner Country being bound to inform the Commission, OLAF or the European Court of Auditors of the exact location at which they are kept.

  1. The checks and audits described above shall also apply to contractors, grant beneficiaries and subcontractors who have received EU financing.
  2. The Partner Country shall be notified of on the spot missions by agents appointed by the Commission, OLAF or the European Court of Auditors.

Article 17 - Tasks of the Partner Country in fighting irregularities, fraud and corruption

  1. The Partner Country shall immediately inform the Commission of any element brought to its attention which arouses suspicions of irregularities, fraud or corruption and of any measure taken or planned to deal with them.
  2. The Partner Country shall ensure and check regularly that the actions financed from the budget are effectively carried out and implemented correctly. It shall take appropriate measures to prevent, detect and correct irregularities and fraud and where necessary, bring prosecutions and recover funds unduly paid.

"Irregularity" shall mean any infringement of this Financing Agreement, implementing contracts and programme estimate or of EU law resulting from an act or omission by anyone who has, or would have, the effect of prejudicing the funds of the EU, either by reducing or losing revenue owed to the EU, or by an unjustified item of expenditure.

"Fraud" shall mean any intentional act or omission concerning:

  1. The Partner Country undertakes to take every appropriate measure to prevent, detect and punish any practices of active or passive corruption during the implementation of the Financing Agreement.

"Passive corruption" shall mean the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or for a third party, or accepts a promise of such an advantage, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

"Active corruption" shall mean the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official, for himself or for a third party, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

  1. If the Partner Country does not take appropriate measures to prevent fraud, irregularities and corruption, the Commission may adopt precautionary measures including the suspension of this Financing Agreement.

Article 18 - Suspension of payments

  1. Without prejudice to the suspension or termination of this Financing Agreement according to Articles 26 and 27, respectively, the Commission may suspend payments partially or fully, if:
  2. the Commission has established or has serious concerns that, on the basis of information it

received, and needs to verify, the Partner Country has committed substantial errors, irregularities or fraud in the procurement and grant award procedure or in the implementation of the action, or the Partner Country has failed to comply with its obligations under this Financing Agreement, including obligations regarding the implementation of the Communication and Visibility plan;

  1. the Commission has established or has serious concerns that, on the basis of information it

received, and needs to verify, the Partner Country has committed systemic or recurrent errors, irregularities, fraud or breach of obligations under this or other Financing Agreements, provided that those errors, irregularities, fraud or breach of obligations have a material impact on the implementation on this Financing Agreement or call into question the reliability of the Partner Country's internal control system or the legality and regularity of the underlying expenditure;

  1. the Commission suspects that the Partner Country committed substantial errors,

irregularities, fraud or breach of obligations in the procurement and grant award procedure or in the implementation of the action and needs to verify whether they have occurred.

  1. it is necessary to prevent significant damage to the financial interests of the EU.
  2. The Commission shall immediately inform the Partner Country about the suspension of payments and of the reasons for this suspension.
  3. The suspension of payments shall have the effect of suspending payment time-limits for any payment request pending.
  4. In order to resume payments the Partner Country shall endeavour to remedy the situation leading to the suspension as soon as possible and shall inform the Commission of any progress made in this respect. The Commission shall, as soon as it considers that the conditions for resuming payments have been met, inform the Partner Country thereof.

Article 19 - Allocation of funds recovered by the Commission to the action

Where the action is financed under the EDF, amounts unduly paid and recovered by the Commission, amounts from financial guarantees lodged on the basis of procurement and grant award procedures, amounts from financial penalties imposed, as well as damages awarded to the Commission shall be allocated to this action.

Article 20 - Right of establishment and residence

  1. Where justified by the nature of the procurement contract or grant contract, the Partner Country shall entitle natural and legal persons participating in invitations to tender for works, supply or service contracts or calls for proposals and entities expected to be entrusted with implementation tasks identified in Annex I with a provisional right of establishment and residence in the Partner Country's territory(ies). This right shall remain valid for one month after the contract is awarded.
  2. The Partner Country shall also entitle procurement contractors and grant beneficiaries, entities entrusted with implementation tasks identified in Annex I (Technical and Administrative Provisions), natural persons whose services are required for the performance of this action and members of their families with similar rights during the implementation of the action.

Article 21 - Tax and customs provisions and foreign exchange arrangements

  1. The Partner Country shall apply to procurement contracts and grants contracts financed by the EU the most favoured tax and customs arrangements applied to States or international development organisations with which it has relations.

Where the Partner Country is an ACP State, account shall not be taken of arrangements applied by it to the other ACP States or to other developing countries for the purpose of determining the most-favoured-State treatment.

  1. Where a Framework Agreement is applicable, which includes more detailed provisions on this subject, these provisions shall apply as well.

Article 22 - Confidentiality

  1. The Partner Country agrees that its documents and data held by an entity with which the Partner Country is in a contractual relationship regarding them may be forwarded to the Commission by that entity for the sole purpose of implementing this or another Financing Agreement. The Commission shall respect all confidentiality arrangements agreed between the Partner Country and that entity.
  2. Without prejudice to Article 16 of these General Conditions, the Partner Country and the Commission shall preserve the confidentiality of any document, information or other material directly related to the implementation of this Financing Agreement that is classified as confidential.
  3. The Parties shall obtain each other's prior written consent before publicly disclosing such information.
  4. The Parties shall remain bound by the confidentiality until five years after the end of the execution period.

Article 23 - Use of studies

The contract related to any study financed under this Financing Agreement shall include the right for the Partner Country and for the Commission to use the study, to publish it and to disclose it to third parties.

Article 24 - Consultation between the Partner Country and the Commission

  1. The Partner Country and the Commission shall consult each other before taking any dispute relating to the implementation or interpretation of this Financing Agreement further pursuant to Article 29 of these General Conditions.
  2. Where the Commission becomes aware of problems in carrying out procedures relating to management of this Financing Agreement, it shall establish all necessary contacts with the Partner Country to remedy the situation and take any steps that are necessary.
  3. The consultation may lead to the amendment, suspension or termination of this Financing Agreement.
  4. The Commission shall regularly inform the Partner Country of the implementation of activities described in Annex I which do not fall under Parts One and Two of these General Conditions.

Article 25 - Amendment of this Financing Agreement

  1. Any amendment of this Financing Agreement shall be made in writing, including an exchange of letters.
  2. If the request for an amendment comes from the Partner Country, the latter shall submit that request to the Commission at least three months before the amendment is intended to enter into force, except in cases which are duly substantiated by the Partner Country and accepted by the Commission. In the exceptional cases of an adjustment of the objectives of the action and/or an increase in the EU contribution, such request shall be submitted at least six months before the amendment is intended to enter into force.
  3. If the adjustment both does not significantly affect the objectives of the activity implemented pursuant to Part One of these General Conditions, and if it concerns matters of detail which do not affect the technical solution adopted, and if it does not include the reallocation of funds, or if it concerns reallocations of funds for an amount equivalent to the amount of the contingency reserve, the Partner Country shall inform the Commission of the adjustment and its justification in writing as soon as possible and may apply that adjustment.
  4. The use of the contingency reserve provided for an action shall be subject to the Commission's prior written approval.
  5. Where the Commission considers that the Partner Country ceases to perform satisfactorily the tasks entrusted pursuant to Article 1.1 of these General Conditions and without prejudice to Articles 26 and 27 of these General Conditions, the Commission may decide to retake the tasks entrusted from the Partner Country in order to continue the implementation of the activities on behalf of the Partner Country after informing the latter in writing.

Article 26 - Suspension of this Financing Agreement

  1. The Financing Agreement may be suspended in the following cases:

Partner Country breaches any obligation set under the procedures and standard documents referred to in Articles 1, 4, 5 and 6 of these General Conditions.

  1. The Commission may suspend this Financing Agreement without prior notice.
  2. The Commission may take any appropriate precautionary measure before suspension takes place.
  3. When the suspension is notified, the consequences for the on-going procurement and grant contracts, delegation agreements and programme estimate shall be indicated.
  4. A suspension of this Financing Agreement is without prejudice to the suspension of payments and termination of this Financing Agreement by the Commission in accordance with Article 18 and 27 of the General Conditions.
  5. The parties shall resume the implementation of the Financing Agreement once the conditions allow with the prior written approval of the Commission. This is without prejudice to any amendments of this Financing Agreement which may be necessary to adapt the action to the new implementing conditions, including, if possible, the extension of the implementation period, or the termination of this Financing Agreement in accordance with Article 27.

27 - Termination of this Financing Agreement

Article

27.1.

27.2.

If the issues which led to the suspension of this Financing Agreement have not been resolved within a maximum period of 180 days, either party may terminate this Financing Agreement at 30 days' notice.

This Financing Agreement shall be automatically terminated, if no implementing contract has been signed within the deadlines of Article 2.

  1. When the termination is notified, the consequences for the on-going procurement contracts, grant contracts and programme estimate shall be indicated.

Article 28 - Dispute settlement arrangements

  1. Any dispute concerning this Financing Agreement which cannot be settled within a six-month period by the consultations between the parties provided for in Article 24 of these General Conditions may be settled by arbitration at one of the parties' request.

Where the Partner Country is an ACP State or an ACP regional body or organisation and this action is financed under the EDF, the dispute shall be submitted, prior to arbitration and after the consultations provided for in Article 24 of these General Conditions, to the ACP-EC Council of Ministers, or, between its meetings, to the ACP-EC Committee of Ambassadors, pursuant to Article 98 of the ACP-EC Partnership Agreement. If the Council or Committee does not succeed in settling the dispute, either party may request settlement of the dispute by arbitration in accordance with Articles 28.2, 28.3 and 28.4.

  1. Each party shall designate an arbitrator within 30 days of the request for arbitration. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration (The Hague) to designate a second arbitrator. The two arbitrators shall in their turn designate a third arbitrator within 30 days. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration to designate the third arbitrator.
  2. Unless the arbitrators decide otherwise, the procedure laid down in the Permanent Court of Arbitration Optional Rules for Arbitration Involving International Organisations and States shall apply. The arbitrators' decisions shall be taken by a majority within a period of three months.
  3. Each party shall be bound to take the measures necessary for the application of the arbitrators' decision.
  1. According to the methodology approved and published on the official web-site of the National Bank of Moldova: Regulation on the Setting of the Official Exchange Rate of Moldovan Leu against Foreign Currencies, Decision of the Council of Administration of the National Bank of Moldova No.3 of January 15, 2009, Official Monitor of the Republic of Moldova, No.27-29 of February 10, 2009, Art.100. ↑

  2. The Carabineer Reform Strategy 2017-2020 is currently under development. Once approved and in line with the objectives of this Programme and the Republic of Moldova's overall Police Strategy's orientation, the Performance indicators for disbursement (Policy Matrix) in Annex 1 could be amended with a view to introducing a new dedicated Carabineers budget support component into the Policy Matrix. ↑

  3. Based on the table Weights of Specific Conditions in Tranches and Timetable, it needs to be understood already here that the figures mentioned for 2018, 2019, 2020 and 2021 every time include EUR 2 million (i.e. EUR 8 million in total) that would only be released upon achieving mutually agreed on policy goals in the field of the reform of Carabineer Troops. Goals in this particular field can only be established – through an amendment of the Financing Agreement – if and when a Carabineer Troops Reform Strategy is formally adopted and in line with the objectives of this Programme and the Republic of Moldova's overall Police Strategy's orientation. ↑

  4. As provided for in the Twinning Manual. ↑

  5. Based on the table Weights of Specific Conditions in Tranches and Timetable, it needs to be understood already here that the figures mentioned for 2018, 2019, 2020 and 2021 every time include EUR 2 million(i.e. EUR 8 million in total) that would only be released upon achieving mutually agreed on policy goals in the field of the reform of Carabineer Troops. Goals in this particular field can only be established – through an amendment of the Financing Agreement – if and when a Carabineer Troops Reform Strategy is formally adopted and in line with the Objectives of this Programme and the Republic of Moldova's overall Police Strategy's orientation. ↑

  6. The Carabineer Reserve refers to four separate tranches of EUR 2 million (i.e. EUR 8 million in total) that can only be released upon achieving mutually agreed on policy goals in the field of the reform of Carabineer Troops. Goals in this particular field can only be established – through an amendment of the Financing Agreement – if and when a Carabineer Troops Reform Strategy is formally adopted in line with the objectives of this Programme and of the Republic of Moldova's overall Police Strategy's orientation. ↑

  7. Elimination of unsuccessful bids five years after the closure of the procurement procedure ↑

  8. Elimination of unsuccessful applications three years after the closure of the grant procedure. ↑