FINANCING AGREEMENT

SPECIAL CONDITIONS

The European Commission, hereinafter referred to as "the Commission", acting on behalf of the European Union, hereinafter referred to as "the EU",

of the one part, and

the Government of the Republic of Moldova hereinafter referred to as "the Partner Country",

of the other part,

have agreed as follows:

Article 1 - Nature of the action

1.1. The EU agrees to finance and the Partner Country agrees to accept the financing of the following action:

Support to Public Administration Reform (PAR)

CRIS number: ENI/2015/038-933

This action is financed from the EU Budget under the following basic act: European Neighbourhood Instrument.

1.2. The total estimated cost of this action is EUR 15,000,000 and the maximum EU contribution to this action is set at EUR 15,000,000.

1.3. The Partner Country shall not co-finance the action.

Article 2 – Execution period

2.1. The execution period of this Financing Agreement as defined in Article 15 of Annex II (General Conditions) shall commence on the entry into force of this Financing Agreement and end 72 months after this date.

2.2. The duration of the operational implementation phase is fixed at 48 months.

2.3. The duration of the closure phase is fixed at 24 months.

Article 3 – Addresses

All communications concerning the implementation of this Financing Agreement shall be in writing, shall refer expressly to this action as identified in Article 1.1 of these Special Conditions and shall be sent to the following addresses:

  1. for the Commission

Mr Pirkka TAPIOLA

Head of the EU Delegation to the Republic of Moldova

12, Kogalniceanu Street

MD-2001 Chisinau

Republic of Moldova

DELEGATION-MOLDOVA@eeas.europa.eu

  1. for the Partner Country

Mr Pavel FILIP

Prime Minister of the Republic of Moldova

1, Piata Marii Adunari Nationale

MD-2001 Chisinau

Republic of Moldova

Article 4 – OLAF contact point

The contact point of the Partner Country having the appropriate powers to cooperate directly with the European Anti-Fraud Office (OLAF) in order to facilitate OLAF's operational activities shall be:

Mr Serafim Urechean

President

Court of Accounts of the Republic of Moldova

Address: Stefan cel Mare Bd. 69, Chisinau 2001, Moldova

Tel: +373 22 233-776

E-mail: s_urechean@ccrm.md

Article 5 - Annexes

5.1. This Financing Agreement is composed of:

(a) these Special Conditions;

(b) Annex I: Technical and Administrative Provisions, detailing the objectives, expected results, activities, description of the budget-implementation tasks entrusted and budget of this Action;

(c) Annex II: General Conditions.

(d) Annex III: Reporting Template – not applicable to and not included in this Financing Agreement;

(e) Annex IV: Management Declaration Template - not applicable to and not included in this Financing Agreement;

5.2. In the event of a conflict between, on the one hand, the provisions of the Annexes and, on the other hand, the provisions of these Special Conditions, the latter shall take precedence. In the event of a conflict between, on the one hand, the provisions of Annex I (Technical and Administrative Provisions) and, on the other hand, the provisions of Annex II (General Conditions), the latter shall take precedence.

Article 6 – Entry into force

This Financing Agreement shall enter into force on the date on which the Commission receives a notification from the Partner Country confirming the completion of the internal procedures of the Partner Country necessary for its entry into force. The Commission shall inform the Partner Country of the date of the receipt of this notification. This Financing Agreement shall not enter into force if such a notification is not received by the Commission by 31 December 2016.

Done in two original copies, one copy being handed to the Commission and one to the Partner Country.

For the Partner Country: For the Commission:

H.E. Pavel FILIP Mr Lawrence MEREDITH

Prime Minister of the Republic of Moldova Director Neighbourhood East

Directorate-General for Neighbourhood and Enlargement Negotiations

Brussels

Annex I: Technical and Administrative Provisions

1. Title/basic act/ CRIS number

Support to Public Administration Reform (PAR)I

CRIS number: ENI/2015/038-933

Financed under the European Neighbourhood Instrument

2. Zone benefiting from the action/location

Republic of Moldova

The action shall be carried out at the following location: the whole territory of the Republic of Moldova

3. Programming document

Single Support Framework (SSF) for EU support to the Republic of Moldova (2014-2017)

4. Sector of concentration/ thematic area

Public Administration Reform

5. Amounts concerned

Total estimated cost: EUR 15 million

Total amount of EU budget contribution: EUR 15 million

6. Aid modality(ies)

and implementation modality(ies)

Direct management - procurement of services and supplies

7. DAC code(s)

15140- Government administration

15112- Decentralisation and support to subnational government

8. Markers (from CRIS DAC form)

General policy objective

Not targeted

Significant objective

Main objective

Participation development/good governance

□

□

x

Aid to environment

□

x

□

Gender equality (including Women In Development)

□

x

□

Trade Development

□

x

□

Reproductive, Maternal, New born and child health

x

□

□

RIO Convention markers

Not targeted

Significant objective

Main objective

Biological diversity

x

□

□

Combat desertification

x

□

□

Climate change mitigation

x

□

□

Climate change adaptation

x

□

□

9. Global Public Goods and Challenges (GPGC) thematic flagships

Not applicable (N/A)

Summary

The proposed action "Support to Public Administration Reform (PAR)" in the Republic of Moldova, in line with the Single Support Framework (SSF) 2014-2017, aims to support public administration reform efforts and to strengthen administrative capacity of Moldovan administration to meet the specific requirements arising from the Association Agenda with the European Union (EU).

The financial support for Moldova is provided through two components.

Under the first component support will be provided to the public administration reform process in order to improve efficiency, effectiveness and accountability of Moldovan public administration. To this aim, the action will provide assistance to the implementation of domestic reforms as planned in the new PAR Strategy 2016-2020; namely the action will support the harmonisation of the strategic framework of public administration reform and its related coordination and monitoring system, will contribute to improve the policy development system, to professionalise the public service and human resources management system and to modernise public services.

Under the second component support will be provided to the National Bureau of Statistics in order to enhance their capacities for collecting and processing quality and timely data for ensuring economic and social impact assessment of public policies as well as their monitoring.

Description of the action

Objectives/results

The overall objective of this action is to enhance the institutional and human resource capacity of the central and local public administrations to elaborate and implement inclusive and evidence based policy and to ensure the efficient and effective delivery of high quality public services in line with the European Principles of Public Administration.

The specific objectives are (1) to contribute to the horizontal Public Administration reform process in Moldova in order to improve efficiency, effectiveness and accountability by improving the strategic framework, institutional set-up and administrative capacities of Moldovan Public Administration and (2) to strengthen administrative capacity of Moldovan Administration to meet the requirements of the Association Agenda, including implementation of public policies and monitoring of their outcomes, delivery of public service, and statistical data collection and processing systems for better economic and social impact assessment of public policies by decision-makers and citizens.

Results/Outputs

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions

Component 1: Horizontal Public Administration Reform process

1.1 The strategic framework of Public Administration Reform is comprehensive, harmonised across the central planning documents and provides for regular implementation plans and monitoring of reforms;

1.2 Institutional set-up, procedures and capacities for inclusive and evidence-based policy development and coordination and legal approximation are clarified and improved;

1.3 Professionalism and transparency of the human resources management system are strengthened and effectively monitored leading to increased and improved staff professional capacity and motivation;

1.4 Steering of public service delivery reforms across the administration is strengthened and selected priority services are re-engineered and implemented country-wide.

Component 2: Administrative capacity development for the Association Agenda

2.1 The data produced by the National Bureau of Statistics (NBS) is used by decision-makers for economic and social impact assessment policies as well as for monitoring of public policies, including systematic production of gender and age disaggregated data wherever appropriate.

Main activities

The main activities to be performed under component 1 include:

Result 1.1

Result 1.2

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions

Result 1.3

Result 1.4

(i) Opening and Closing a Business

(ii) Public Procurement – e-Procurement

(iii) Application for Social Benefits (Social Insurance Service)

(iv) Admission to the Higher Education Institutions

(v) Land registration

The main activities to be performed under component 2 include:

Result 2.1

1.3 Intervention logic

This action is aimed at consolidating the Public Administration System of Moldova at all levels, its increased efficiency and effectiveness, particularly through the operational implementation of

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions

the principles of the transparent and evidence based policy making, supported by the improved institutional and human resources capacities.

Implementation

Implementation modalities

2.1.1 Activities under component 1

Subject

Type (works, supplies, services)

Indicative number of contracts

Indicative trimester of launch of the procedure

(1) Call for tender <Support to PAR processes> (direct management) – Result 1.1

Services

1

third trimester 2016

(2) Call for tender <Policy Development - Association Agreement> (direct management) - Result 1.2

Services

1

third trimester 2016

(3) Call for tender <PA employees capacity building and motivation> (direct management) – Result 1.3

Services

1

third trimester 2016

(4) Call for tender <Re-engineering of selected public services delivery> (direct management) – Result 1.4

Services

1

third trimester 2016

2.1.2 Activities under component 2

Subject

Type (works, supplies, services)

Indicative number of contracts

Indicative trimester of launch of the procedure

Call for tender <NBS services> (direct management) – Result 2.1

Services

1

third trimester 2016

Call for tender <NBS supplies> (direct management) – Result 2.1

Supplies

1

third trimester 2016

Scope of geographical eligibility for procurement and grants

The geographical eligibility in terms of place of establishment for participating in procurement and grant award procedures and in terms of origin of supplies purchased as established in the basic act and set out in the relevant contractual documents shall apply.

The Commission’s authorising officer responsible may extend the geographical eligibility in accordance with Article 9(2)(b) of Regulation (EU) No 236/2014 on the basis of urgency or of

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions

unavailability of products and services in the markets of the countries concerned, or in other duly substantiated cases where the eligibility rules would make the achievement of this action impossible or exceedingly difficult.

Indicative budget

EU contribution

(amount in EUR)

Component 1: Horizontal Public Administration Reform process – procurement (direct management)

10 800 000

Component 2: Administrative capacity development for the Association Agenda

- Procurement of NBS services and supplies (direct management)

4 000 000

Evaluation and Audit

200 000

Totals

15 000 000

Organizational set-up and responsibilities

A multi-stakeholder approach will be followed in a single Project Steering Committee that will ensure complementarity and synergies between all actions covering the component 1.Main counterparts of the activities under component 1 will be the following (list is indicative):State Chancellery; Representatives from Regional and Local authorities; Academy of Public Administration; Ministry of Foreign Affairs and European Integration; Ministry of Finance; Ministry of Economy.

Activities under component 2 will have the following stakeholders in the relevant Project Steering Committee: State Chancellery; National Bureau of Statistics; Ministry of Regional Development and Construction.

Performance monitoring and reporting

At the top level, the overall strategic monitoring of the implementation of this programme implementation will be carried out by National PAR Committee. Overall donor coordination will be ensured by the National Coordinator.

As contracting authority, the European Union Delegation to the Republic of Moldova will execute regular monitoring tasks as per its monitoring plan, using standard procedures and tools.

The day-to-day technical and financial monitoring of the implementation of this action will be a continuous process and part of the implementing partner’s responsibilities. To this aim, the implementing partner shall establish a permanent internal, technical and financial monitoring system for the action and elaborate regular progress reports (not less than annual) and final reports. Every report shall provide an accurate account of implementation of the action, difficulties encountered, changes introduced, as well as the degree of achievement of its results

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions (outputs and direct outcomes) as measured by corresponding indicators, using as reference the log frame matrix. The report shall be laid out in such a way as to allow monitoring of the means envisaged and employed and of the budget details for the action. The final report, narrative and financial, will cover the entire period of the action implementation.

The Commission may undertake additional project monitoring visits both through its own staff and through independent consultants recruited directly by the Commission for independent monitoring reviews (or recruited by the responsible agent contracted by the Commission for implementing such reviews).

Evaluation

Having regard to the nature of the action, amid-term review will be carried out as well as a final evaluation for this action and its components via independent consultants contracted by the Commission.

It will be carried out for accountability and learning purposes at various levels (including for policy revision), taking into account in particular the fact that the public administration reform is a central area of EU-Republic of Moldova cooperation.

The Commission shall inform the implementing partners at least two months in advance of the dates foreseen for the evaluation missions. The implementing partners shall collaborate efficiently and effectively with the evaluation experts, and inter alia provide them with all necessary information and documentation, as well as access to the project premises and activities.

The evaluation reports shall be shared with the partner country and other key stakeholders. The implementing partner and the Commission shall analyse the conclusions and recommendations of the evaluations and, where appropriate, in agreement with the partner country, jointly decide on the follow-up actions to be taken and any adjustments necessary, including, if indicated, the reorientation of the project.

Indicatively, two contracts for evaluation services shall be concluded under a framework contract in the first trimester 2018 and the final evaluation to be tendered in the first trimester 2020. The contracts will be funded under the budget of the current Action.

Audit

Without prejudice to the obligations applicable to contracts concluded for the implementation of this action, the Commission may, on the basis of a risk assessment, contract independent audits or expenditure verification assignments for one or several contracts or agreements.

Indicatively, two contracts for audit services shall be concluded under a framework contract indicatively in first trimester 2019 and first trimester 2020.

Financing Agreement ENI/2015/038-933-Annex I - Technical and Administrative Provisions

Communication and visibility

Communication and visibility of the EU is a legal obligation for all external actions funded by the EU.

This action shall contain communication and visibility measures which shall be based on a specific Communication and Visibility Plan of the Action, to be elaborated at the start of implementation and supported with the budget indicated in section 2.3 above.

In terms of legal obligations on communication and visibility, the measures shall be implemented by the Commission, the partner country, contractors, grant beneficiaries and/or entrusted entities. Appropriate contractual obligations shall be included in, respectively, the financing agreement, procurement and grant contracts, and delegation agreements.

The individual actions shall each contain communication and visibility measures which shall be based on a specific Communication and Visibility Plan, to be elaborated at the start of implementation of the contracts.

The Communication and Visibility Manual for European Union External Action shall be used to establish the Communication and Visibility Plan of the Action and the appropriate contractual obligations. The Communication and Visibility activities will be conducted in accordance with the Communication and Visibility Manual.

APPENDIX - Indicative Log frame matrix (for project modality)[1]

The activities, the expected outputs and all the indicators, targets and baselines included in the log frame matrix are indicative and may be updated during the implementation of the action without an amendment to the financing decision. The indicative log frame matrix will evolve during the lifetime of the action: new lines will be added for listing the activities as well as new columns for intermediary targets (milestones) when it is relevant and for reporting purpose on the achievement of results as measured by indicators.

Intervention logic

Indicators

Baselines

(incl. reference year)

Targets

(incl. reference year)

Sources and means of verification

Assumptions

Overall objective: Impact

The overall objective of this programme is to enhance the institutional and human resource capacity of the central and local public administrations to elaborate and implement evidence based policy and to ensure the efficient and effective delivery of high quality public services in line with the European Principles of Public Administration.

Corruption index perception (CPI) in public sector decreased*

Aggregate Government effectiveness

Savings in administrative costs for state budget coming from rationalization of Public Administration structures

103th (2015)

46,8 (2014)

0% Savings of Administrative costs are coming from rationalization of Public Administration structures

48th (2020)

71,6 (2020)

At least 5% of administrative costs are saved due to rationalization of Public Administration structures (2016-2020)

Transparency International,

World Governance Indicators (World Bank)

Annual reports from Government and State Budget

The Republic of Moldova pursues its objective of improved relations and economic integration with the EU and pursues its efforts to modernize its administration.

Sufficient resources (human and material) are allocated by the beneficiary institutions to achieve project outputs.

The Public Procurement regulation is aligned with the relevant EU standards.

Specific objective: Outcome

(1) To achieve horizontal Public Administration reform process by improving the strategic framework, institutional set-up and administrative capacities of Moldovan Public Administration to implement public policies and monitor their outcomes, to deliver public service and to meet the requirements of the Association Agenda,

(2) To strengthen statistical data collection and processing systems for better economic and social impact assessment of public policies by decision-makers and citizens..

Percentage of fulfilled PAR objectives.

Aggregate Regulatory Quality

Aggregate Voice and Accountability of Public Administration

% of citizens satisfaction of public services

% of public policies and legislative proposals which include by economic and social impact assessment

Statistical data from NBS is used for economic and social impact assessment of public policies

5% (2016)

53,8 (2014)

46,8 (2014)

Baseline based on independent survey is to be established in 2017

N/A (2015)Baseline to be established in 2017

No (2015)

80% (2020)

79,3 (2020)

55,7 (2020)

80% (2020)

Yes, fully incorporated (2020)

Ministry of Finance

State Chancellery

World Governance Indicators (World Bank)

Harmonised mechanisms of Public Administration Reforms

  1. Annual reports from Government and Parliament.

Outputs

Results/Outputsr

1.1 The strategic framework of Public Administration Reform is comprehensive, harmonised across the central planning documents and provides for regular implementation plans and monitoring of reforms

Share of costed and resourced PAR measures.

Harmonized monitoring and evaluation system for PAR is in place and allows measuring achievements against objectives.

11% (2015)

N/A (2016)

100 % (2020)

Yes (2017)

SIGMA Baseline Assessments.

Reports on PAR by Government of Moldova.

1.2 Institutional set-up, procedures and capacities for inclusive and evidence-based policy development and coordination and legal approximation are clarified and improved;

Percentage of legislative initiatives linked with EU approximation accordingly budgeted in the Medium-Term Budgetary Framework

Number of inter-ministerial meetings per year for policy coordination

Proportion of critical CoG functions that are fulfilled by the institutions.

Extent to which policy development process makes the best use of analytical tools.

Completeness of financial estimates in sector strategies.

Ratio between total funds estimated in the sectoral strategies and total funding identified for the corresponding sectors within the MTBF.

Extent to which reporting provides information on the outcomes achieved.

N/A (2014)

4 (2014)

4 (2015)

3 (2015)

2 (2015)

0% (2015)

3 (2015)

At least 80% (2018)

12 (2018)

5 (2020)

4 (2020)

4 (2020)

50% (2020)

4 (2020)

Parliament Activity Report

Minutes of inter-ministerial meetings

SIGMA Assessment

SIGMA Assessment

SIGMA Assessment

SIGMA Assessment

SIGMA Assessment

1.3 Professionalism and transparency of the human resources management system are strengthened and effectively monitored;

Annual turnover of civil servants within Central Public Administration in average

Annual turnover of senior managerial civil servants at the level of the central administration.

% of recruitments in public authorities are carried out following competition

% of State Secretaries nominated and deployed out of total number of line ministries.

% of Civil Servants receiving more than 40 hours of training per year

% of Civil Servants feel satisfied with the work

Extent to which the remuneration system of public servants is fair and transparent and applied in practice.

16% (2014)

0%

51,9% (2014)

43.77 % (2016)

31.2% (2014)

No survey available (2014)

3 (2015)

10% (2019)

15%

60% (2020)

100% (2018)

At least 50% (2019)

At least 50% (2019)

4 (2020)

State Chancellery (2015) Report on the Public Office and Status of Civil Servant.

SIGMA Assessment

Annual Reports on Civil Service by Government of Moldova

State Chancellery (2015) Report on the Public Office and Status of Civil Servant.

Annual Reports on Civil Service by Government of Moldova

Survey on Public Employees and working conditions

SIGMA Assessment

1.4 Steering of service delivery reforms across the administration is strengthened and selected priority services are re-engineered and furtherly digitalised

Geographical coverage of one stop shop for opening and closure of business service

Geographical coverage of e-Application for the selected Social Benefit Service

Geographical coverage of the service e-Admission to Higher Education Institutions

% of Moldovan citizens satisfied with the quality of selected PSs

% Public Tenders done via e-Procurement tool.

0% (2014)

0% (2014)

0% (2014)

0% (2014)

0% (2014)

At least 90% (2019)

At least 80% (2019)

At least 80% (2019)

At least 60% (2019)

At least 80% (2019)

IT application

Survey on access points

E-Government Center reports

National Citizen Satisfaction Survey 2019

Report from Ministry of Finance.

Project reports

2.1 The National Bureau of Statistics (NBS) is compliant towards approximation to EU norms and standards in line with Chapter 6 to the AA including systematic production of gender and age disaggregated data wherever appropriate

National Strategy for Statistics (NSS) is in place and adopted Multi-annual programme for statistical works

% of implementation of Annual Programme for statistical works

NSS not in place (2014)

N/A (2014)

NSS in place and developed through annual plans (2018)

90% (2018)

National Bureau of Statistics

National Bureau of Statistics

Part One: Provisions Applicable to Activities for which the Beneficiary is the Contracting Authority

Article 1 - General principles

1.1 The purpose of Part One is to define the budget-implementation tasks entrusted to the
Beneficiary in indirect management as described in Annex I (Technical and Administrative
Provisions) and to define the rights and obligations of the Beneficiary and of the Commission in
carrying out these tasks.

Part One shall apply to the budget-implementation tasks related to the EU contribution alone or in combination with the funds of the Beneficiary or of a third party where such funds are implemented in joint co-financing, i.e. where they are pooled. These tasks encompass the implementation by the Beneficiary as contracting authority of procurement and grant award procedures, and the awarding, signing and enforcing the resulting procurement and grant contracts.

As a rule, the Commission shall carry out related payments to contractors and grant beneficiaries. However, the Beneficiary shall carry out certain payments including to its own staff on the basis of a programme estimate as defined in Article 5 of these General Conditions.

Where the Beneficiary is an ACP State and the action is financed by the EDF pursuant to Article 1.1 of the Special Conditions, the tasks entrusted shall be those listed in points (c) to (k) of the sixth subparagraph of Article 35(1) and in Article 35(2) of Annex IV to the ACP-EC Partnership Agreement.

Where the Beneficiary is an OCT and the action is financed by the EDF pursuant to Article 1.1 of the Special Conditions, the exercise of tasks entrusted shall also respect the conditions of Article 86(3) of Council Decision 2013/755/EU of 25 November 2013 on the association of the overseas countries and territories with the European Union (Overseas Association Decision) .

1.2 The Beneficiary shall remain responsible for the fulfilment of the obligations stipulated in this
Financing Agreement even if it designates other entities identified in Annex I (Technical and
Administrative Provisions) to carry out certain budget-implementation tasks in the context of
the implementation of a programme estimate referred to in Article 5 of these General
Conditions. The Commission, in particular, reserves the right to suspend payments, and to
suspend and/or terminate this Financing Agreement on the basis of the acts, omissions and/or
situations of any designated entity.

  1. The tasks identified in Article 1.1 of these General Conditions shall be carried out by the Beneficiary in accordance with the procedures and standard documents laid down and published by the Commission for the award of procurement and grant contracts, in force at the time of the launch of the procedure in question.
  2. The Beneficiary shall set up and ensure the functioning of an effective and efficient internal control system. The Beneficiary shall respect the principles of sound financial management, transparency and non-discrimination and avoid situations of conflict of interest.

A conflict of interest exists where the impartial and objective exercise of the functions of any responsible person is compromised for reasons involving family, emotional life, political or national affinity, economic interest or any other shared interest with a tenderer or applicant, or contractor or grant beneficiary.

Internal control system is a process aimed at providing reasonable assurance that operations are effective, efficient and economical, that the reporting is reliable, that assets and information are safeguarded, that fraud and irregularities are prevented, detected and corrected, and that risks relating to the legality and regularity of the financial operation are adequately managed, taking into account the multiannual character of the activities as well as the nature of the payments concerned.

In particular, where the Beneficiary carries out payments pursuant to a programme estimate, the functions of the authorising and accounting officers shall be segregated and mutually incompatible and the Beneficiary shall operate an accounting system that provides accurate, complete, reliable and timely information. The Beneficiary shall also reasonably protect data enabling the identification of a natural person (personal data).

  1. Where made a part of this Financing Agreement pursuant to Article 5 of the Special Conditions, the report on the implementation of the tasks entrusted to the Beneficiary shall follow the template provided in Annex III. However, where programme estimates are used pursuant to Article 5 of these General Conditions, the report shall follow the requirements stipulated in the standard documents referred to in Article 5.3 of these General Conditions. Where made a part of this Financing Agreement pursuant to Article 5 of the Special Conditions, the management declaration shall follow the template provided in Annex IV.
  2. An independent external audit opinion on the management declaration, performed in accordance with internationally accepted auditing standards, does not have to be provided in this case as the Commission shall conduct the audits for this action. These audits will verify the truthfulness of the assertions made in the management declaration and the legality and regularity of the underlying transactions made.
  3. The Beneficiary shall conduct the procurement and grant award procedures and conclude the resulting contracts in the language of this Financing Agreement.

1.8 The Beneficiary shall inform the Commission when a candidate, tenderer or applicant is in a
situation of exclusion from participating in procurement and grant award procedures referred to
in Article 1.3 and when a contractor or grant beneficiary has been guilty of making false
declarations or has made substantial errors or committed irregularities and fraud, or has been
found in serious breach of its contractual obligations.

In such cases, without prejudice to the power of the Commission to take measures against such entity according to the applicable Financial Regulation, financial penalties mentioned in the provisions on administrative and financial penalties of the General Conditions of procurement and grant contracts concluded by the Beneficiary pursuant to standard documents referred to in Article 1.3 may be imposed on the contractors and grant beneficiaries by the Beneficiary if this is allowed by its national law. Such financial penalties shall be imposed following an adversarial procedure ensuring the right of defence of the contractor or grant beneficiary.

The Beneficiary may take into account, as appropriate and on its own responsibility the information contained in the Central Exclusion Database, when awarding procurement and grant contracts. Access to the information can be provided through the liaison point(s) or via consultation to the Commission1 (European Commission, Directorate- General for Budget, Accounting Officer of the Commission, BRE2-13/505, B-1049 Brussels, Belgium and by email to BUDG-C01-EXCL-DB@ec.europa.eu in copy to the Commission address identified in Article 3 of the Special Conditions). The Commission may refuse payments to a contractor or grant beneficiary in an exclusion situation.

1.9 The Beneficiary shall keep all relevant financial and contractual supporting documents from the
date of the entry into force of this Financing Agreement or as from an earlier date which is
stipulated as the start date of cost eligibility in Article 6 of the Special Conditions for five years
as from the end of the execution period, in particular, the following:

Procurement procedures:

a. Forecast notice with proof of publication of the procurement notice and any corrigenda

b. Appointment of shortlist panel

c. Shortlist report (incl. annexes) and applications

d. Proof of publication of the shortlist notice

e. Letters to non-shortlisted candidates

1 The Beneficiary shall be allowed to have direct access to the Central exclusion database through a liaison point when the Beneficiary certifies to the Commission service responsible that it applies the adequate data protection measures as provided in the Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data (OJ L 8, 12.1.2001, p. 1).

f. Invitation to tender or equivalent

g. Tender dossier including annexes, clarifications, minutes of the meetings, proof of
publication

h. Appointment of the evaluation committee

i. Tender opening report, including annexes

j. Evaluation / negotiation report, including annexes and bids received2

k. Notification letter

l. Supporting documents

m. Cover letter for submission of contract

n. Letters to unsuccessful candidates

0. Award / cancellation notice, including proof of publication
p. Signed contracts, amendments, riders and relevant correspondence

Calls for proposals and direct award of grants:

a. Appointment of the evaluation committee

b. Opening and administrative report including annexes and applications received3

c. Letters to successful and unsuccessful applicants following concept note evaluation

d. Concept note evaluation report

e. Evaluation report of the full application or negotiation report with relevant annexes

f. Eligibility check and supporting documents

g. Letters to successful and unsuccessful applicants with approved reserve list following full
application evaluation

h. Cover letter for submission of grant contract

1. Award/cancellation notice with proof of publication

j. Signed contracts, amendments, riders and relevant correspondence

In case of programme estimates: In addition to the above, all relevant documentation relating to payments, recoveries and operating costs.

1.10 The Beneficiary shall ensure an appropriate protection of personal data. Personal data means any information relating to an identified or identifiable natural person. Any involving the processing of personal data, such as collection, recording, organisation, storage, adaption or

2 Elimination of unsuccessful bids five years after the closure of the procurement procedure

3 Elimination of unsuccessful applications three years after the closure of the grant procedure.

alteration, retrieval, consultation, use, disclosure, erasure or destruction, shall be based on rules and procedures of the Beneficiary and shall only be done as far as it is necessary for the implementation of this Financing Agreement.

In particular, the Beneficiary shall take appropriate technical and organisational security measures concerning the risks inherent in any such operation and the nature of the information relating to the natural person concerned, in order to:

  1. Prevent any unauthorised person from gaining access to computer systems performing such operations, and especially unauthorised reading, copying, alteration or removal of storage media; unauthorised data input as well as any unauthorised disclosure, alteration or erasure of stored information;
  2. Ensure that authorised users of an IT system performing such operations can access only the information to which their access right refers;
  3. Design its organisational structure in such a way that it meets the above requirements.

Article 2 - Deadline for the signature of the procurement and grant contracts by the Beneficiary

2.1 The procurement and grant contracts shall be duly signed by both parties during the operational
implementation phase of this Financing Agreement and at the latest within three years of the
entry into force of this Financing Agreement. Additional procurement and grant contracts
resulting from an amendment of this Financing Agreement that adds new activities and
increases the EU contribution shall be duly signed by both parties during the operational
implementation phase of this Financing Agreement and at the latest within three years of the
entry into force of that amendment of this Financing Agreement.

Where this action is financed from the EDF, programme estimates referred to in Article 5 of these General Conditions shall also be endorsed by the Commission within that three-year deadline.

That three-year deadline may not be extended, except when the action is financed by the EDF. The extension shall be stipulated in Article 6 of the Special Conditions.

2.2 However, the following transactions may be signed at any time during the operational
implementation phase.

a. procurement and grant contracts implementing the imprest component of a programme
estimate financed under the EDF;

b. amendments to procurement and grant contracts already signed;

c. individual procurement contracts to be concluded after early termination of an existing
procurement contract;

d. amendment of this Financing Agreement resulting from the change of the entity
charged with the entrusted tasks, referred to in Article 1.2 of these General
Conditions; the amendment shall also stipulate a new period within which
procurement and grant contracts shall be concluded by this new entity in accordance

with Article 2.1:

e. Contracts relating to audit and evaluation, which may also be signed during the

closure phase.

  1. After expiry of the three years of the entry into force of this Financing Agreement, any financial balance for activities entrusted to the Beneficiary for which contracts have not been duly signed shall be decommitted by the Commission.
  2. Article 2.3 shall not apply to any financial balance of the contingency reserve or to funds available again after early termination of a contract. This balance or funds may be used to finance contracts referred to in Article 2.2.
  3. A procurement or grant contract which has not given rise to any payment within three years of its signature shall be automatically terminated and its funding shall be decommitted.

Article 3 - Visibility

The Beneficiary shall take the necessary measures to ensure the visibility of EU funding for the activities entrusted to it or for other activities under this action. These measures shall either be defined in Annex I (Technical and Administrative Provisions) or shall be agreed later between the Beneficiary and the Commission.

These communication and information measures shall comply with the Communications and Visibility Manual for EU External Actions laid down and published by the Commission, in force at the time of the measures.

Article 4 - Provisions on payments made by the Commission to contractors and grant beneficiaries on behalf of the Beneficiary

4.1 The Beneficiary shall provide the Commission with the approved payment requests within the
following deadlines, starting from the date of receipt of the payment request, not counting the
periods of suspension of the time-limit for payment:
(a) for pre-financing specified in the procurement or grant contract:

(i) 15 calendar days for an action financed under the Budget;

(ii) 30 calendar days for an action financed under the EDF; b) 45 calendar days for other payments.

The Commission shall act in accordance with Articles 4.6 and 4.7 within the period amounting to the time-limit for payment provided for in the procurement and grant contracts minus the above deadlines.

4.2 Upon receipt of a payment request from a contractor or grant beneficiary, the Beneficiary shall
inform the Commission of its receipt and shall immediately examine whether the request is
admissible, i.e. whether it contains the identification of that contractor or grant beneficiary, the
contract concerned, the amount, the currency and the date. If the Beneficiary concludes that the
request is inadmissible, it shall reject it and inform the contractor or grant beneficiary of this
rejection and of its reasons within 30 days of receipt of the request. The Beneficiary shall also

inform the Commission of this rejection and its reasons.

  1. Upon receipt of an admissible payment request, the Beneficiary shall examine whether a payment is due, i.e. whether all contractual obligations justifying the payment have been fulfilled, including examining a report, where applicable. If the Beneficiary concludes that a payment is not due, it shall inform the contractor or grant beneficiary thereof and of the reasons. The dispatch of this information suspends the time-limit for payment. The Commission shall receive a copy of the information so dispatched. The Commission shall also be informed of the reply or corrective action of the contractor or grant beneficiary. That reply or action aimed at correcting the non-compliance with its contractual obligations shall restart the time-limit for payment. The Beneficiary shall examine this reply or action pursuant to this paragraph.
  2. If the Commission disagrees with the Beneficiary's conclusion that a payment is not due, it shall inform the Beneficiary thereof. The Beneficiary shall re-examine its positions and, if it concludes that the payment is due, it shall inform thereof the contractor or grant beneficiary. The suspension of the time-limit for payment shall be lifted upon dispatch of this information. The Beneficiary shall also inform the Commission. The Beneficiary shall further proceed as provided for in Article 4.5.

If disagreement between the Beneficiary and the Commission persists, the Commission may pay the undisputed part of the invoiced amount provided that it is clearly separable from the disputed amount. It shall inform the Beneficiary and the contractor or grant beneficiary of this partial payment.

  1. Where the Beneficiary concludes that the payment is due, it shall transfer the payment request and all necessary accompanying documents to the Commission for approval and payment. It shall provide an overview of how many days of the time-limit for payment are left and of all periods of suspension of this time-limit.
  2. After transfer of the payment request pursuant to Article 4.5, if the Commission concludes that the payment is not due, it shall inform the Beneficiary and, in copy, the contractor or grant beneficiary thereof and of the reasons. Informing the contractor or grant beneficiary shall have the effect of suspending the time-limit for payment, as provided for in the contract concluded. A reply or corrective action of the contractor or grant beneficiary shall be treated by the Beneficiary in accordance with Article 4.3.
  3. Where the Beneficiary and the Commission concludes that the payment is due, the Commission shall execute the payment.
  4. Where late-payment interest is due to the contractor or grant beneficiary, it shall be allocated between the Beneficiary and the Commission pro rata to the days of delay in excess of the time limits stipulated in Article 4.1, subject to the following:

(a) the number of days used by the Beneficiary is calculated from the date of the

registration of an admissible payment request referred to in Article 4.3 to the date of the transfer of the request to the Commission referred to in Article 4.5 and from the date of information by the Commission referred to Article 4.6 to the following transfer

of the request to the Commission referred to in Article 4.5. Any period of suspension of the time-limit for payment shall be deducted.

(b) the number of days used by the Commission is calculated from the date following that

of transfer of the request by the Beneficiary referred to in Article 4.5 to the date of payment and from the date of transfer to the date of informing the Beneficiary pursuant to Article 4.6.

4.9 Any circumstances unforeseen by the above procedure shall be solved in a spirit of cooperation

between the Beneficiary and the Commission by analogy to the above provisions while respecting the contractual relations of the Beneficiary with the contractor or grant beneficiary.

Where feasible, one party shall cooperate at the request of the other party in providing useful information for the assessment of the payment request, even before the payment request is formally transferred to or returned from the first party.

Article 5 - Programme estimate

  1. When the Beneficiary is additionally entrusted with making payments to contractors, grant beneficiaries and/or in the context of direct labour, it shall do so on the basis of a programme estimate agreed by the Beneficiary and the Commission beforehand.
  2. The programme estimate is a document laying down the programme of activities to be carried out and the human and material resources required, the corresponding budget and the detailed technical and administrative implementing arrangements for the execution of these activities over a specified period by means of procurement, grants and/or direct labour.

The programme estimate shall have an imprest component and a component of specific commitments.

Under the imprest component of a programme estimate, the Beneficiary shall be entrusted with implementing the procurement and grant award procedures and carry out the related payments and the payments for direct labour.

Under the component for specific commitments, the Beneficiary shall carry out tasks as referred to in the second subparagraph of Article 1.1 of these General Conditions; the Commission shall carry out related payment to contractors and grant beneficiaries. Certain identified activities, including audits, evaluations and recourse to the framework contract, shall be implemented directly by the Commission.

Where the action is financed under the EDF, the tasks described in Annex I may be implemented by a body governed by private law on the basis of a service contract, awarded by the Beneficiary in accordance with the procedures and standard documents referred to in Article 1.3.

5.3 All programme estimates implementing the Financing Agreement must respect the procedures
and standard documents concerning programme estimates and laid down by the Commission, in
force at the time of the adoption of the programme estimate in question.

Ordinary operating costs incurred by the entity in charge of the tasks entrusted to the Beneficiary referred to in Articles 1.1 and 5.1 of these General Conditions shall be eligible for EU financing under the imprest component of a programme estimate during the entire duration of the execution period of this Financing Agreement, unless an earlier start of cost eligibility is stipulated in Article 6 of the Special Conditions. These costs are incurred in carrying out budget-implementation tasks and include local staff, utilities (e.g. water, gas, and electricity), rental of premises, consumables, maintenance, short-term business trips and fuel for vehicles. They shall not include purchase of vehicles or of any other equipment, or any operational activity. Article 1.3 and 2.1 of these General Conditions shall not apply to these ordinary operating costs.

5.4 The Beneficiary shall submit to the Commission annually, by the date stipulated in Article 6 of

the Special Conditions, a management declaration signed by the Beneficiary at the appropriate level using the template in Annex IV.

Article 6 - Payments to the Beneficiary implementing the imprest component of a programme estimate

  1. The Commission shall transfer funds no later than 30 calendar days after the date on which it registers an admissible payment request for pre-financing from the Beneficiary which contains the date, the amount and the currency; the time-limit shall be 90 calendar days for a payment request for replenishment or closure. Late-payment interest shall be due pursuant to the applicable Financial Regulation. The time-limit for the payment may be suspended by the Commission by informing the Beneficiary, at any time during the period referred to above, that the payment request cannot be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request comes to the notice of the Commission, the Commission may suspend the time-limit for the payment for the purpose of further verification, including an on-the-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible. The suspension and the reasons for it shall be communicated to the Beneficiary as soon as possible. The time-limit for the payment shall resume once the missing supporting documents have been provided or the payment request has been corrected.
  2. The Commission shall make payments to a bank account opened at a financial institution accepted by the Commission.
  3. The Beneficiary shall guarantee that funds paid by the Commission can be identified in this bank account.
  4. Transfers in euro shall, if necessary, be converted into the Beneficiary's national currency as and when payments have to be made by the Beneficiary, at the bank rate in force on the day of payment by the Beneficiary.
  5. The imprest component of a programme estimate which has not given rise to any payment to the Beneficiary within three years of the conclusion of the programme estimate shall be

automatically terminated, and the corresponding committed amount shall be decommitted.

Article 7 - Publication of information on procurement and grant contracts by the Beneficiary

7.1 The Beneficiary undertakes to publish each year in a dedicated and easily accessible place of its
internet site, for each procurement and grant contract for which it is contracting authority under
the programme estimates referred to in Article 5, its nature and purpose, the name and locality
of the contractor (contractors in case of a consortium) or grant beneficiary (grant beneficiaries in
case of a multi-beneficiary grant), as well as the amount of the contract.

The locality of a natural person shall be a region at NUTS2 level. The locality of a legal person shall be its address.

If such internet publication is impossible, the information shall be published by any other appropriate means, including the official journal of the Beneficiary.

Article 6 of the Special Conditions shall stipulate the location, on the internet or otherwise, of the place of publication; reference shall be made to this location in the dedicated place of the internet site of the Commission.

7.2 Scholarships to, and direct financial support of natural persons most in need shall be published
anonymously and in an accumulated manner by category of expenditure.

Otherwise, names of natural persons shall be replaced by "natural person" two years after publication. The name of a legal entity containing that of a natural person involved in this entity shall be treated as a natural person's name.

Publication of names of natural persons shall be waived if such publication risks violating their fundamental rights or damaging their commercial interests.

The Beneficiary shall present a list of data to be published on natural persons with any justifications for proposed waivers of publication to the Commission which must grant prior approval to this list. Where necessary, the Commission shall complete the locality of the natural person limited to a region at NUTS2 level.

  1. Publication of the procurement and grant contracts concluded (i.e. signed by the Beneficiary and the contractor or grant beneficiary) during the reporting period shall take place within six months following the date for submitting the report pursuant to Article 6 of Special Conditions.
  2. Publication of contracts may be waived if such publication risks harming the commercial interests of contractors or grant beneficiaries. The Beneficiary shall present a list with such justifications to the Commission which must grant prior approval to such publication waiver.
  3. Where the Commission carries out payments to contractors and grant beneficiaries, it shall ensure the publication of information on procurement and grant contracts according to its rules..

Article 8 - Recovery of funds

8.1 The Beneficiary shall take any appropriate measures to recover the funds unduly paid.

Amounts unduly paid and recovered by the Beneficiary, amounts from financial guarantees

lodged on the basis of procurement and grant award procedures, amounts from financial penalties imposed by the Beneficiary on candidates, tenderers, applicants, contractors or grant beneficiaries, as well as damages awarded to the Beneficiary shall be returned to the Commission.

  1. Without prejudice to the above responsibility of the Beneficiary to recover funds unduly paid, the Beneficiary agrees that the Commission may, in accordance with the provisions of the Financial Regulation applicable and this Financing Agreement, formally establish an amount as being unduly paid under procurement and grant contracts financed under Part One and proceed to its recovery by any means on behalf of the Beneficiary, including by offsetting the amount owed by the contractor or grant beneficiary against any of his claims against the EU and by forced recovery before the competent courts.
  2. To this end, the Beneficiary shall provide to the Commission all the documentation and information necessary. The Beneficiary hereby empowers the Commission to carry out the recovery in particular by calling on a guarantee of a contractor or grant beneficiary of which the Beneficiary is the contracting authority or by offsetting the funds to be recovered against any amounts owed to the contractor or grant beneficiary by the Beneficiary as contracting authority and financed by the EU under this or another Financing Agreement or by forced recovery before the competent courts.
  3. The Commission shall inform the Beneficiary that the recovery proceedings have been initiated (including where necessary before a national court).
  4. Where the Beneficiary is a sub-delegatee of an entity with which the Commission concluded a delegation agreement, the Commission may recover funds from the Beneficiary which are due to the entity but which the entity was not able to recover itself.

Article 9 - Financial claims under procurement and grant contracts

The Beneficiary undertakes to confer with the Commission before taking any decision concerning a request for compensation made by a contractor or grant beneficiary and considered by the Beneficiary to be justified in whole or in part. The financial consequences may be borne by the EU only where the Commission has given its prior approval. Such prior approval is also required for any use of funds committed under the present Financing Agreement to cover costs arising from disputes relating to contracts.

Article 10 - Cost overruns and ways of financing them

  1. Individual overruns of the budget headings of the activities implemented by the Beneficiary shall be dealt with by reallocating funds within the overall budget, in accordance with Article 25 of these General Conditions.
  2. Wherever there is a risk of overrunning the amount foreseen for the activity implemented by the Beneficiary, the Beneficiary shall immediately inform the Commission and seek its prior approval for the corrective activities planned to cover the overrun, proposing either to scale

down the activities or to draw on its own or other non-EU resources.

10.3 If the activities cannot be scaled down, or if the overrun cannot be covered either by the Beneficiary's own resources or other resources, the Commission may, at the Beneficiary's duly substantiated request, decide to grant additional EU financing. Should the Commission take such a decision, the excess costs shall be financed, without prejudice to the relevant EU rules and procedures, by the release of an additional financial contribution to be set by the Commission. This Financing Agreement shall be amended accordingly.

Part Two: Provisions Applicable to Budget Support

Article 11 - Policy dialogue

The Beneficiary and the EU commit to engage in a regular constructive dialogue at the appropriate level on the implementation of this Financing Agreement.

Where the Beneficiary is an ACP State and this action is financed under the EDF pursuant to Article 1.1 of the Special Conditions, this dialogue may form a part of the broader political dialogue provided for in Article 8 of the ACP-EC Partnership Agreement.

Article 12 - Verification of conditions and disbursement

12.1. The Commission shall verify the conditions for the payment of the tranches of the budget
support component, as identified in Annex I (Technical and Administrative Provisions).

Where the Commission concludes that the conditions for payment are not fulfilled, it shall inform the Beneficiary thereof without undue delay.

  1. Disbursement requests submitted by the Beneficiary shall be eligible for EU financing provided that they are in accordance with the provisions set out in Annex I (Technical and Administrative Provisions) and that they are submitted during the operational implementation phase.
  2. The Beneficiary shall apply its national foreign exchange regulations in a nondiscriminatory manner to all disbursements of the budget support component.

Article 13 - Transparency of budget support

The Beneficiary hereby agrees to the publication by the Commission, of this Financing Agreement and any amendment thereof, including by electronic means, and of such basic information on the budget support which the Commission deems appropriate. Such publication shall not contain any data in violation of the EU laws applicable to the protection of personal data.

Article 14 - Recovery of budget support

All or part of the budget support disbursements may be recovered by the Commission, with due respect to the principle of proportionality, if the Commission establishes that payment has

been vitiated by a serious irregularity attributable to the Beneficiary, in particular if the Beneficiary provided unreliable or incorrect information, or if corruption or fraud was involved.

Part Three: Provisions Applicable to This Action as a Whole, Irrespective of the Management Mode

Article 15 - Execution period and contracting deadline in direct management

15.1 The execution period of this Financing Agreement shall comprise two phases:

These periods shall be reflected in the agreements to be concluded by the Beneficiary and by the Commission in the implementation of this Financing Agreement, in particular in delegation agreements and procurement and grant contracts.

  1. Costs related to the principal operational activities shall be eligible for EU financing only if they have been incurred during the operational implementation phase; the costs incurred by the Beneficiary before the entry into force of this Financing Agreement shall not be eligible for EU financing unless provided otherwise in Article 6 of the Special Conditions. Costs related to final audits and evaluation, and to closure activities shall be eligible until the end of the closure phase.
  2. Any balance remaining from the EU contribution will be automatically decommitted no later than six months after the end of the execution period.
  3. In exceptional and duly substantiated cases, a request may be made for the extension of the operational implementation phase and correlatively of the execution period. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the operational implementation phase and approved by the Commission before that end. This Financing Agreement shall be amended accordingly.
  4. In exceptional and duly substantiated cases, and after the end of the operational implementation phase, a request may be made for the extension of the closure phase and correlatively of the execution period. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the closure phase and approved by the Commission before that end. This Financing Agreement shall be amended accordingly.
  5. Article 2 of these General Conditions shall apply to activities implemented by the Commission as contracting authority (direct management) with the exception of the second

and third subparagraph of Article 2.1.

Article 16 - Verifications and checks by the Commission, the European Anti-Fraud Office (OLAF) and the European Court of Auditors

16.1 The Beneficiary shall assist and support the verifications and checks carried out by the
Commission, OLAF and the European Court of Auditors at their request.

The Beneficiary agrees to the Commission, OLAF and the European Court of Auditors conducting documentary and on-the-spot controls on the use made of EU financing under the activities under this Financing Agreement and carrying out a full audit, if necessary, on the basis of supporting documents of accounts and accounting documents and any other documents relating to the financing of the activities, throughout the duration of this Financing Agreement and for five years from the end of the execution period.

16.2 The Beneficiary also agrees that OLAF may carry out on-the-spot checks and verifications in
accordance with the procedures laid down by EU law for the protection of the EU's financial
interests against fraud and other irregularities.

To that end, pursuant to Regulation (EC, Euratom) No 2185/96 and to Regulation (EC, Euratom) No 883/2013, the Beneficiary shall grant officials of the Commission, OLAF and the European Court of Auditors and their authorised agents access to sites and premises at which operations financed under this Financing Agreement are carried out, including their computer systems, and to any documents and computerised data concerning the technical and financial management of those operations, and to take every appropriate measure to facilitate their work. Access by authorised agents of the Commission, OLAF and the European Court of Auditors shall be granted on conditions of strict confidentiality with regard to third parties, without prejudice to public law obligations to which they are subject. Documents must be accessible and filed in a manner permitting easy inspection, the Beneficiary being bound to inform the Commission, OLAF or the European Court of Auditors of the exact location at which they are kept.

  1. The checks and audits described above shall also apply to contractors and grant beneficiaries, and subcontractors who have received EU financing.
  2. The Beneficiary shall be notified of on the spot missions by agents appointed by the Commission, OLAF or the European Court of Auditors.

Article 17 - Tasks of the Beneficiary in fighting irregularities, fraud and corruption

  1. The Beneficiary shall immediately inform the Commission of any element brought to its attention which arouses suspicions of irregularities, fraud or corruption and of any measure taken or planned to deal with them.
  2. The Beneficiary shall ensure and check regularly that the actions financed from the budget are effectively carried out and implemented correctly. It shall take appropriate measures to prevent, detect and correct irregularities and fraud and where necessary, bring prosecutions and recover funds unduly paid.

"Irregularity" shall mean any infringement of this Financing Agreement, implementing contracts and programme estimates or of EU law resulting from an act or omission by anyone who has, or would have, the effect of prejudicing the funds of the EU, either by reducing or losing revenue owed to the EU, or by an unjustified item of expenditure. "Fraud" shall mean any intentional act or omission concerning:

17.3 The Beneficiary undertakes to take every appropriate measure to prevent, detect and punish any
practices of active or passive corruption during the implementation of the Financing Agreement.

"Passive corruption" shall mean the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or for a third party, or accepts a promise of such an advantage, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

"Active corruption" shall mean the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official, for himself or for a third party, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

  1. The Beneficiary shall immediately inform the Commission (contacts pursuant to the third subparagraph of the Article 1.8 of the General Conditions) of the name of the entity that has been the subject of a judgment which has the force of res judicata for fraud, corruption, involvement in a criminal organisation, money laundering or any other illegal activity detrimental to the EU's financial interests.
  2. If the Beneficiary does not take appropriate measures to prevent fraud, irregularities and corruption, the Commission may adopt precautionary measures including the suspension of this Financing Agreement.

Article 18 - Suspension of payments

18.1 Without prejudice to the suspension or termination of this Financing Agreement according to Articles 26 and 27, respectively, the Commission may suspend payments partially or fully, if:

a) the Commission has established that or has serious concerns, on the basis of information it received, and needs to verify, whether the Beneficiary has committed substantial errors, irregularities or fraud in the procurement and grant award procedure or in the implementation of the action, or the Beneficiary has failed to comply with its

obligations under this Financing Agreement, including obligations regarding the implementation of the Communications and Visibility plan;

b) the Commission has established that or has serious concerns, on the basis of information it

received, and needs to verify, whether the Beneficiary has committed systemic or recurrent errors, irregularities, fraud or breach of obligations under this or other Financing Agreements, provided that those errors, irregularities, fraud or breach of obligations have a material impact on the implementation on this Financing Agreement or call into question the reliability of the Beneficiary's internal control system or the legality and regularity of the underlying expenditure;

c) the Commission suspects that the Beneficiary committed substantial errors, irregularities,

fraud or breach of obligations in the procurement and grant award procedure or in the implementation of the action and needs to verify whether they have occurred.

d) it is necessary to prevent significant damage to the financial interests of the EU.

  1. The Commission shall immediately inform the Beneficiary about the suspension of payments and of the reasons for this suspension.
  2. The suspension of payments shall have the effect of suspending payment time-limits for any payment request pending.
  3. In order to resume payments the Beneficiary shall endeavour to remedy the situation leading to the suspension as soon as possible and shall inform the Commission of any progress made in this respect. The Commission shall, as soon as it considers that the conditions for resuming payments have been met, inform the Beneficiary thereof.

Article 19 - Allocation of funds recovered by the Commission to the action

Where the action is financed under the EDF, amounts unduly paid and recovered by the Commission, amounts from financial guarantees lodged on the basis of procurement and grant award procedures, amounts from financial penalties imposed on candidates, tenderers, applicants, contractors or grant beneficiaries, as well as damages awarded to the Commission shall be allocated to this action.

Article 20 - Right of establishment and residence

  1. Where justified by the nature of the procurement or grant contract, the Beneficiary shall entitle natural and legal persons participating in invitations to tender for works, supply or service contracts or calls for proposals and entities expected to be entrusted with budget-implementation tasks identified in Annex I with a provisional right of establishment and residence in the Beneficiary's territory(ies). This right shall remain valid for one month after the contract is awarded.
  2. The Beneficiary shall also entitle procurement contractors and grant beneficiaries, entities entrusted with budget-implementation tasks identified in Annex I (Technical and

Administrative Provisions), natural persons whose services are required for the performance of this action and members of their families with similar rights during the implementation of the action.

Article 21 - Tax and customs provisions

21.1 The Beneficiary shall apply to procurement contracts and grants financed by the EU the most
favoured tax and customs arrangements applied to States or international development
organisations with which it has relations.

Where the Beneficiary is an ACP State, account shall not be taken of arrangements applied by it to the other ACP States or to other developing countries for the purpose of determining the most-favoured-State treatment.

21.2 Where a Framework Agreement is applicable, which includes more detailed provisions on this
subject, these provisions shall apply as well.

Article 22 - Confidentiality

  1. The Beneficiary agrees that its documents and data held by an entity with which the Beneficiary is in a contractual relationship regarding them may be forwarded to the Commission by that entity for the sole purpose of implementing this or another Financing Agreement. The Commission shall respect all confidentiality arrangements agreed between the Beneficiary and that entity.
  2. Without prejudice to Article 16 of these General Conditions, the Beneficiary and the Commission shall preserve the confidentiality of any document, information or other material directly related to the implementation of this Financing Agreement that is classified as confidential.
  3. The Parties shall obtain each other's prior written consent before publicly disclosing such information.
  4. The Parties shall remain bound by the confidentiality until five years after the end of the execution period.

Article 23 - Use of studies

The contract related to any study financed under this Financing Agreement shall include the right for the Beneficiary and for the Commission to use the study, to publish it and to disclose it to third parties.

Article 24 - Consultation between the Beneficiary and the Commission

24.1 The Beneficiary and the Commission shall consult each other before taking any dispute relating to the implementation or interpretation of this Financing Agreement further pursuant to Article 29 of these General Conditions.

  1. Where the Commission becomes aware of problems in carrying out procedures relating to management of this Financing Agreement, it shall establish all necessary contacts with the Beneficiary to remedy the situation and take any steps that are necessary.
  2. The consultation may lead to the amendment, suspension or termination of this Financing Agreement.
  3. The Commission shall regularly inform the Beneficiary of the implementation of activities described in Annex I which do not fall under Part One of these General Conditions.

Article 25 - Amendment of this Financing Agreement

  1. Any amendment of this Financing Agreement shall be made in writing, including an exchange of letters.
  2. If the request for an amendment comes from the Beneficiary, the latter shall submit that request to the Commission at least three months before the amendment is intended to enter into force, except in cases which are duly substantiated by the Beneficiary and accepted by the Commission. In the exceptional cases of an adjustment of the objectives of the action and/or an increase in the EU contribution, such request shall be submitted at least six months before the amendment is intended to enter into force.
  3. If the adjustment both does not significantly affect the objectives of the activity implemented pursuant to Part One of these General Conditions, and if it concerns matters of detail which do not affect the technical solution adopted, and if it does not include the reallocation of funds, or if it concerns reallocations of funds within the limit of the contingency reserve, the Beneficiary shall inform the Commission of the adjustment and its justification in writing as soon as possible and may apply that adjustment.
  4. The use of contingency reserve provided for an action shall be subject to the Commission's prior written approval.
  5. Where the Commission considers that the Beneficiary ceases to perform satisfactorily the tasks entrusted pursuant to Article 1.1 of these General Conditions and without prejudice to Articles 26 and 27 of these General Conditions, the Commission may decide to retake the tasks entrusted from the Beneficiary in order to continue the implementation of the activities on behalf of the Beneficiary after informing the latter in writing.

Article 26 - Suspension of this Financing Agreement

26.1 The Financing Agreement may be suspended in the following cases:

  1. The Commission may suspend this Financing Agreement without prior notice.
  2. The Commission may take any appropriate precautionary measure before suspension takes place.
  3. When the suspension is notified, the consequences for the on-going procurement and grant contracts, delegation agreements and programme estimates and for such contracts, delegation agreements and programme estimates to be signed shall be indicated.
  4. A suspension of this Financing Agreement is without prejudice to the suspension of payments and termination of this Financing Agreement by the Commission in accordance with Article 18 and 27 of the General Conditions.

26.6 The parties shall resume the implementation of the Financing Agreement once the

conditions allow with the prior written approval of the Commission. This is without prejudice to any amendments of this Financing Agreement which may be necessary to adapt the action to the new implementing conditions, including, if possible, the extension of the implementation period, or the termination of this Financing Agreement in accordance with Article 27.

Article 27 - Termination of this Financing Agreement

  1. If the issues which led to the suspension of this Financing Agreement have not been resolved within a maximum period of 180 days, either party may terminate this Financing Agreement at 30 days' notice.
  2. This Financing Agreement shall be automatically terminated, if within the period of three years of its signature:
  3. it has not given rise to any payment;
  4. no implementing contract or delegation agreement has been signed;
  5. and where this action is financed under the EDF, no programme estimate has been signed;

27.3 When the termination is notified, the consequences for the on-going procurement and grant

contracts, delegation agreements and programme estimates and for such contracts, delegation agreements and programme estimates to be signed shall be indicated.

Article 28 - Dispute settlement arrangements

28.1 Any dispute concerning this Financing Agreement which cannot be settled within a six-month
period by the consultations between the parties provided for in Article 24 of these General
Conditions may be settled by arbitration at one of the parties' request.

Where the Beneficiary is an ACP State or an ACP regional body or organisation and this action is financed under the EDF, the dispute shall be submitted, prior to arbitration and after the consultations provided for in Article 24 of these General Conditions, to the ACP-EC Council of Ministers, or, between its meetings, to the ACP-EC Committee of Ambassadors, pursuant to Article 98 of the ACP-EC Partnership Agreement. If the Council or Committee does not succeed in settling the dispute, either party may request settlement of the dispute by arbitration in accordance with Articles 28.2, 28.3 and 28.4.

  1. Each party shall designate an arbitrator within 30 days of the request for arbitration. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration (The Hague) to designate a second arbitrator. The two arbitrators shall in their turn designate a third arbitrator within 30 days. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration to designate the third arbitrator.
  2. Unless the arbitrators decide otherwise, the procedure laid down in the Permanent Court of Arbitration Optional Rules for Arbitration Involving International Organisations and States shall apply. The arbitrators' decisions shall be taken by a majority within a period of three months.
  3. Each party shall be bound to take the measures necessary for the application of the arbitrators' decision.
  1. Indicators aligned with the relevant programming document are marked with '*' and indicators aligned to the EU Results Framework with '**'. ↑