GENERAL СOST BREAKDOWN

Section I - Water Supply D = 315 mm, L = 650 m

No.

Description of Works

Unit.

Volume of Works

Estimated cost, Euro

Unit Price

Total

1.

Installation of pipe d= 315 atm-10 PE, including:

- development of soil in trenches over rough terrain, soils of 2 categories,

- cutting down and uprooting of trees,

- consolidation bottom of trenches

- installation of reinforced concrete manholes,

- sand beding under pipes,

- laying of water pipes,

- installation of concrete abutments

- installation of valves and control accessories (gate valves, control valves),

- backfilling of trenches,

- purchase and planting of new trees

M

650

222, 23

144 449, 50

2.

Laying of pipe d= 315, by a closed way through a steel sleeve d= 630 mm. including:

- horizontal drilling of a gallery with a diameter of 630 mm,

- the placing of a sleeve from a metal pipe with a diameter of 630 mm,

- installation of water pipes

M

50

367, 82

18 391,00

3.

Working documents for performance of work, including:

- development of project documentation,

- verification and approval of design documentation,

- geodesy, executive topographic survey,

- commissioning of the water pipeline

set

1

18 899,19

18 899,19

TOTAL SECTION I

 

 

 

181 739, 69

Section II - Water Supply D = 315 mm, L = 1500 m

Nr.

Description of Works

Unit.

Volume of Works

Estimated cost, Euro

Unit Price

Total

1

2

3

4

5

6

1.

Installation of pipe d= 315 atm-10 PE, including:

- cutting of asphalt pavement of roads and driveways

- transportation of construction waste from asphalt paving disassembly,

- trenches excavation,

- soil development by hand,

- compaction of a bottom of trenches,

- sand foundations for pipes,

- installation of reinforced concrete manholes,

- laying of water pipes,

- installation of concrete abutments,

- installation of valves and control accessories (gate valves, control valves),

- backfilling of trenches with compaction,

- restoration of asphalt pavement

М

500

270, 75

135 375,00

2.

Laying of pipes d= 315 atm 10 PE in rough terrain, including:

- cutting of trees,

- development of soil in trenches over rough terrain, soils of 2 nd categories,

- compaction the bottom of the trench,

- sand foundations for pipes

- laying of water pipes

- installation of reinforced concrete manholes,

- installation of concrete abutments,

- installation of shut-off and control valves (gate valves, vent valves),

- backfilling of trenches with compaction

- the cost of planting new trees

М

950

222, 22

211 109,00

3.

Laying of pipe d= 315, by a closed way through a steel sleeve d= 630 mm. including:

- horizontal drilling of a gallery with a diameter of 630 mm,

- the placing of a sleeve from a metal pipe with a diameter of 630 mm,

- installation of water pipes

М

50

367,82

18 391,00

4.

Working documents for performance of work, including:

- development of project documentation,

- verification and approval of design documentation,

- geodesy, executive topographic survey,

- pressure testing of water pipeline,

- commissioning of the water pipeline

set

1

18 911,20

18 911,20

TOTAL SECTION II

383 786,20

Section III – Waste water sewerage network L = 2890 m

No.

Description of Works

Unit.

Volume of Works

Estimated cost, Euro

Unit Price

Total

1

2

3

4

5

6

1.

Laying of waste water sewage d= 500 PP corrugated pipes sn 8, over rough terrain, including:

- cutting down, uprooting trees and shrubs,

- development of soil in trenches, soil 2 nd categories,

- compaction of bottom of trenches,

- sand foundation for pipes,

- installation of sewer manholes,

- laying of sewer pipes,

- leak test of pipes,

- trench backfilling with compaction,

- removal of construction waste (stumps, remains of trees)

M

800

163, 47

130 776,00

2.

Waste water sewage pipes installation d= 600 PP corrugated sn 8 over rough terrain, including:

- cutting down, uprooting trees and shrubs,

- development of soil in trenches, soil 2 nd categories,

- compaction of bottom of trenches,

- sand foundation for pipes,

- installation of sewer manholes,

- laying of sewer pipes,

- leak test of pipes,

- trench backfilling with compaction,

- removal of construction waste (stumps, remains of trees)

M

1900

189,02

359 138,00

3.

Laying waste water sewage pipes d= 600 PP corrugated sn 8 in the area of asphalt surfaces, including:

- cutting of asphalt pavement of roads and driveways

- loading of waste from cutting asphalt into trucks and transportation for recycling,

- development of soil in trenches, soil 2 nd categories,

- compaction of a bottom of trenches,

- sand foundation for pipes,

- installation of sewer manholes,

- laying of sewer pipes,

- leak test of pipes,

- trench backfilling with compaction,

- removal of construction waste

M

100

260, 20

26 020,00

4.

Laying waste water sewage pipes d= 500 PP corrugated sn 8 in a closed way through a steel sleeve d= 820 mm, including:

- drilling a horizontal gallery with a diameter of 820 mm,

- installation of a steel sleeve,

- laying of sewer pipes with a diameter of 500 mm

M

50

521, 08

26 054.00

5.

Laying of the waste water sewerage pipe d= 600 PP corrugated sn 8 in the closed way through a steel sleeve d= 1020 mm, including:

- drilling a horizontal gallery with a diameter of 1020 mm,

- installation of a steel sleeve,

- laying of sewer pipes with a diameter of 600 mm

M

40

633,47

25 338.80

6.

Coordination with ÎM Spaţii Verzi for the construction of the sewer network, cutting down trees and shrubs, purchasing and planting new trees

pcs

198

91,95

18 206, 10

7.

Working documentation for the performance of work, including:

- geodesy, executive topographic survey,

- design,

- commissioning

set

1

18 941, 21

18 941,21

TOTAL SECTION III

604 474, 11

GENERAL TOTAL

I+II+III INCLUDING VAT

1 170 000,00

COST OF WORKS WITHOUT VAT 975,000 Euro

COST OF EXPENSES (supported by SUMMA SRL) 68,250 Euro

GENERAL REMITTUS WITHOUT VAT 1,043,250 Euro

TOTAL RATE (for 11 years) 486,503 Euro

CONTRACTUAL COSTS WITHOUT VAT 1,529,753 Euro