FINANCING AGREEMENT

Special Conditions

The European Union, hereinafter referred to as "the EU", represented by the European Commission, hereinafter referred to as "the Commission",

of the one part, and the Government of the Republic of Moldova, hereinafter referred to as "the Beneficiary", of the other part, have agreed as follows:

ARTICLE 1 - NATURE AND PURPOSE OF THE OPERATION

1.1. The EU shall contribute to the financing of the following programme:

CRIS decision number: ENPI/2012/023-420 Title: Support for Justice Sector Reforms

hereinafter referred to as "the programme", which is described in the Technical and Administrative Provisions.

1.2 This programme shall be implemented in accordance with this Financing Agreement and the annexes thereto.

ARTICLE 2 - TOTAL ESTIMATED COST AND THE EU'S FINANCIAL CONTRIBUTION

2.1 The total cost of the programme is estimated at 60,000,000 euro with the following components:

  1. Budget support: 58,200,000 euro
  2. Complementary support: 1,800,000 euro 2.2 The EU undertakes to finance a maximum of 60,000,000 euro, of which 52,000,000.00 euro from the ENPI 2012 Annual Action Programme in favour of the Republic of Moldova (ENPI/2012/023-420) and 8,000,000.00 euro from the ENPI 2012 Special Measure "EaPIC" (Eastern Partnership Integration and Cooperation) programme (ENPI/2012/024-359).

The breakdown of the EU's financial contribution into budget headings is shown in the budget included in the Technical and Administrative Provisions.

ARTICLE 3 - THE BENEFICIARY'S CONTRIBUTION

  1. The Beneficiary undertakes to co-finance the programme with zero euro. The breakdown of the Beneficiary's financial contribution into budget headings is shown in the budget included in the Technical and Administrative Provisions.
  2. Where there is a non-financial contribution by the Beneficiary, detailed arrangements for the delivery of such contribution shall be set out in the Technical and Administrative Provisions.

ARTICLE 4 - IMPLEMENTATION

  1. By derogation to Article 3 of the General Conditions, the programme shall be implemented by the Commission acting for and on behalf of the Beneficiary.
  2. The following clauses of the General Conditions shall not be applicable: Articles 1.3, 5, 6, 7,8.2, 8.3, 11, 16.2, 17, 19.4, 20.6, 22.3, 22.4 and 22.6.
  3. The following clauses of the General Conditions shall be replaced by the following:
  4. Article 2.2: Wherever there is a risk of overrunning the global amount set in the Financing Agreement, the Commission may either scale down the project/programme or draw on the Beneficiary's own resources, after its approval, or on other non-EU resources.
  5. Article 2.3: If the project/programme cannot be scaled down, or if the overrun cannot be covered by other resources including those of the Beneficiary, the Commission may decide to grant additional EU financing. Should it take such a decision, the excess costs shall be financed, without prejudice to the relevant EU rules and procedures, by the release of an additional financial contribution to be set by the Commission.
  6. Article 18.1: Every project/programme financed by the EU shall be subject to the appropriate communication and information operations. These operations shall be defined with the approval of the Commission.
  7. Article 19.1: The Beneficiary shall take appropriate measures to prevent irregularities and fraud and, on request of the Commission, bring prosecutions to recover funds wrongly paid. The Beneficiary shall inform the Commission of any measure taken.

4.3.5 Article 19.3: The Beneficiary shall immediately inform the Commission of any element brought to its attention which arouses suspicions of irregularities or fraud.

ARTICLE 5 - PERIOD OF EXECUTION

  1. The period of execution of the Financing Agreement as defined in Article 4 of the General Conditions shall commence on the entry into force of the Financing Agreement and end 72 months after this date.
  2. The duration of the operational implementation phase is fixed at 48 months.
  3. The duration of the closure phase is fixed at 24 months.

ARTICLE 6 - ADDRESSES

All communications concerning the implementation of this Financing Agreement shall be in writing, refer expressly to the programme and be sent to the following addresses:

  1. for the Commission Mr Dirk SCHUEBEL

Head of the EU Delegation to the Republic of Moldova 12, Kogalniceanu Street MD-2001 Chisinau Republic of Moldova

  1. for the Beneficiary Mr Iurie LEANCA

The Prime Minister of the Republic of Moldova 1, Piata Marii Adunari Nationale MD-2001 Chisinau Republic of Moldova

ARTICLE 7 - ANNEXES

  1. The following documents shall be annexed to this Financing Agreement and form an integral part thereof:

Annex I: General Conditions

Annex II: Technical and Administrative Provisions

  1. In the event of a conflict between the provisions of the Annexes and those of the Special Conditions of the Financing Agreement, the provisions of the Special Conditions shall take precedence. In the event of a conflict between the provisions of Annex I and those of Annex II, the provisions of Annex I shall take precedence.

ARTICLE 8 - SPECIAL CONDITIONS APPLYING TO A BUDGET SUPPORT OPERATION

  1. The following clauses of the General Conditions shall not be applicable to the part of the programme related to the budget support operation: Articles 1.3, 2, 4.2 first sentence, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16.2, 17 and 18.2, 19.5, 20.6, 22.3,22.4 and 22.6.
  2. Furthermore, the following clauses of the General Conditions shall be replaced respectively by the following:
  3. Article 3: The part of the programme related to the budget support operation shall be implemented by the Commission. This consists in verifying compliance with the conditions for payment, and in the payment of the amounts due for each instalment, in conformity with this Financing Agreement.
  4. Article 14: The Beneficiary undertakes to apply its national foreign exchange regulations in a non-discriminatory manner to the payments made under this Financing Agreement. The foreign exchange transfers will be accounted for under the value date of the notification of credit to the Treasury account to the Central Bank. The exchange rate will be the average rate of the interbank foreign currency market on the value date of the notification of credit.
  5. Article 18.1: Every project/programme financed by the EU shall be subject to the appropriate communication and information operations. These operations shall be defined with the approval of the Commission.
  6. Article 19.1: The Beneficiary shall take appropriate measures to prevent irregularities and fraud and, on request of the Commission, bring prosecutions to recover funds wrongly paid. The Beneficiary shall inform the Commission of any measure taken.
  7. Article 19.3: The Beneficiary shall immediately inform the Commission of any element brought to its attention which arouses suspicions of irregularities or fraud.
  8. Article 4.1 of the General Conditions shall be supplemented by the following: All payment requests submitted by the Beneficiary in accordance with the provisions set out in the Technical and Administrative Provisions shall be eligible for EU financing provided that such requests are submitted during the operational implementation phase.
  9. Article 19.6 of the General Conditions shall be applicable mutatis mutandis in relation to any practices of active or passive corruption whatsoever in relation to the implementation of the operation.

ARTICLE 9 - ENTRY INTO FORCE OF THE FINANCING AGREEMENT

The Financing Agreement shall enter into force on the date on which the Commission receives a notification from the Beneficiary confirming the completion of the internal procedures of the Beneficiary necessary for its entry into force. The Financing Agreement will not enter into force if such a notification is not received by the Commission by 31 December 2013.

Done in two original copies in English, one copy being handed to the Commission and one to the Beneficiary.

[imagine]

[imagine]

Directorate-General for Development and Cooperation - EuropeAid

[imagine]

Prime Minister

Government of the Republic of Moldova

FOR THE BENEFICIARY

[imagine]

[imagine]

ANNEX I - GENERAL CONDITIONS

TITLE I - PROJECT/PROGRAMME FINANCING

ARTICLE 1 - GENERAL PRINCIPLE

  1. The EU's financial contribution shall be limited to the amount specified in the Financing Agreement.
  2. The provision of the EU financing shall be subject to fulfilment of the Beneficiary's obligations under this Financing Agreement.

1.3. The expenditure incurred by the Beneficiary before the entry into force of the Financing Agreement is not eligible for the EU financing.

ARTICLE 2 - COST OVERRUNS AND COVERING THEM

  1. Individual overruns of the budget headings of the Financing Agreement shall be dealt with by reallocating funds within the overall budget, in accordance with Article 22 of these General Conditions.
  2. Wherever there is a risk of overrunning the global amount set in the Financing Agreement, the Beneficiary shall immediately inform the Commission and seek its prior approval for the corrective measures planned to cover the overrun, proposing either to scale down the project/programme or to draw on its own or other non-EU resources.
  3. If the project/programme cannot be seated down, or if the overrun cannot be covered either by the Beneficiary's own resources or other resources, the Commission may, at the Beneficiary's duly substantiated request, decide to grant additional EU financing. Should the Commission take such a decision, the excess costs shall be financed, without prejudice to the relevant EU rules and procedures, by the release of an additional financial contribution to be set by the Commission.

TITLE II - IMPLEMENTATION

ARTICLE 3 - GENERAL PRINCIPLE

The project/programme shall be implemented under the responsibility of the Beneficiary with the approval of the Commission.

ARTICLE 4 - PERIOD OF EXECUTION

  1. The period of execution of the Financing Agreement shall comprise two phases:
  1. Costs related to the principal activities shall be eligible for EU financing only if they have been incurred during the operational implementation phase. Costs related to final audits and evaluation and closure activities shall be eligible up to the end of the closure phase.
  2. Any balance remaining from the EU contribution will be automatically decomrnitted no later than six months after the end of the period of execution.
  3. In exceptional and duly substantiated cases, a request may be made for the extension of the operational implementation phase and correbtively of the period of execution. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the operational implementation phase and approved by the Commission before that latter date.
  4. In exceptional and duly substantiated cases, and after the end of the operational implementation phase, a request may be made for the extension of the closure phase and correlatively of the period of execution. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the closure phase and approved by the Commission before that latter date.

TITLE III - PAYMENTS TO BE MADE BY THE COMMISSION

TO THIRD PARTIES

ARTICLE 5 - DEADLINE FOR PAYMENTS TO BE MADE BY THE COMMISSION TO THIRD PARTIES

5.1 When the Commission is making payments related to contracts implementing the Financing Agreement and awarded by the Beneficiary, the Beneficiary shall undertake to provide the Commission with the payment requests or invoice no later than 15 calendar days before the payment deadline for the initial pre-financings specified in the contract. In case of further pre-financing for grants, and interim and final payments, the Beneficiary shall undertake to provide the Commission with the payment request or invoice not later than 30 calendar days before the expiry of the payment deadline specified in the contract. The Beneficiary shall notify the Commission of the date of registration of this request. The payment request is not admissible if at least one essential requirement is not met. The time limit for payments may be suspended at any time by the Commission by informing the Beneficiary, that the payment request can not be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request, comes to the notice of the Commission the Commission may suspend the time limit for payment for the purpose of further verification, including an on-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible. The suspension should be communicated to the Beneficiary as soon as possible. The time limit for payment shall resume once the payment request becomes admissible.

  1. The deadline referred to in paragraph 1 shall also apply when payment is conditional on approval of a report. The approval of any report is included in the payment deadline specified in the contract. To this end, the Beneficiary has to approve the report and provide the Commission with the payment request or invoice within the deadline set above in article 5.1. When the Beneficiary does not approve the report he shall send, as soon as possible, to the contractor or grant beneficiary a document formally suspending the deadline for payment and explaining the reasons for suspension. Suspension is effective from the sending of the notification. The contractor or grant beneficiary must provide clarifications, modifications or further information within 30 days of the notification. The time limit for payment begins to run again from the date on which the clarifications are registered.
  2. In the event of any delay in forwarding payment requests attributable to the Beneficiary, the Commission shall not be obliged to pay the contractor the late-payment interest provided for in contracts, which will be payable by the Beneficiary. The contractor is entitled to payment of late-payment interest, unless he is a government department or public body in an EU Member State.

TITLE IV - PAYMENTS TO BE MADE BY THE BENEFICIARY TO THIRD PARTIES AND DISBURSEMENT TO BE MADE BY THE COMMISSION THROUGH PROGRAMME ESTIMATES

ARTICLE 6 - GENERAL PRINCIPLE

  1. When the Beneficiary is making payments to third parties, programme estimates must be drawn up and adopted beforehand.
  2. The programme estimate is a document laying down the programme of measures to be carried out and the human and material resources required, the corresponding budget and the detailed technical and administrative implementing arrangements for decentralised execution of a project/programme over a specified period by direct labour and/or by means of public procurement and/or the award of grants.

6.3. All programme estimates implementing the Financing Agreement must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question.

ARTICLE 7 - DISBURSEMENT

  1. The Commission shall transfer funds no later than 45 calendar days after the date on which it registers an admissible payment request from the Beneficiary. The payment request is not admissible if at least one essential requirement is not met. The time limit for payments may be suspended by the Commission by informing the Beneficiary, at any time during the period referred to above, that the payment request can not be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request comes to the notice of the Commission, the Commission may suspend the time limit for payment for the purpose of further verification, including an on-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible The suspension should be communicated to the Beneficiary as soon as possible. The time limit for payment shall resume once the payment request becomes admissible.
  2. The Commission shall make payments to a bank account denominated in euro and opened at a financial institution accepted by the Commission.
  3. The Beneficiary shall guarantee that funds paid by the Commission by way of pre­financing can be identified in this bank account.
  4. Transfers in euro shall, if necessary, be converted into the Beneficiary's national currency as and when payments have to be made by the Beneficiary, at the bank rate in force on the day of payment by the Beneficiary.
  5. The funds paid by the Commission to this bank account shall yield interest or equivalent benefits. The Beneficiar}' shall notify the Commission of interest or equivalent benefits yielded by those funds at least once a year.
  6. Interest or equivalent benefits yielded by the funds paid of more than two hundred fifty thousand euro shall be repaid to the Commission within 45 days of receipt of the Commission's request.
  7. For a programme estimate which has not given rise to any transfer of funds within three years of its signature, the corresponding committed amount shall be decommitted.

TITLE V AWARD OF PROCUREMENT AND GRANT CONTRACTS

ARTICLE 8 - GENERAL PRINCIPLES.

8.1 All contracts implementing the Financing Agreement must be awarded and implemented in accordance with the procedures and standard documents laid
down and published by the Commission for the award of procurement and grant contracts, in force at the time of the launch of the procedure in question.

8.2 The Beneficiary shall use the language of this Financing Agreement for the award
of procurement and grant contracts ,

8.3 In cases of decentralised contracts, the Beneficiary will inform the Commission when a candidate, tenderer or applicant is in a situation of exclusion from
participation in award procedures according to the relevant provisions of the Financial Regulation applicable to the general budget of the European Union or
when a contractor has been guilty of making false declarations or has made substantial errors or committed irregularities and fraud, or has been found in
serious breach of its contractual obligatbns.

In such cases, without prejudice to the power of the Commission to exclude an entity from future procurement and grant contracts financed by the EU according to the Financial Regulation applicable to the general budget of the European Union, financial penalties to contractors mentioned in the provision on "Administrative and Financial Penalties" of the General Conditions of decentralised contracts may be imposed to the contractors by the Beneficiary if this is alb wed by its national law. Such financial penalties shall be imposed following an adversarial procedure and ensuring the right of defence of the contractor.

8.4 The Beneficiary undertakes to take every appropriate measure to remedy any practices of active or passive corruption whatsoever at any stage of the procedure for the award of contracts or grants. 'Passive corruption" shall mean the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or for a third party, or accepts a promise of such an advantage, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests. "Active corruption" shall mean the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official, for himself or for a third party, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

ARTICLE 9 - DEADLINE FOR THE SIGNATURE OF THE CONTRACTS IMPLEMENTING THE FINANCING AGREEMENT

  1. Except for those components of this Financial Agreement implemented under Joint Management or Indirect Centralised Management, the contracts implementing the Financing Agreement shall be signed by both parties within three years of the entry into force of the Financing Agreement. That deadline may not be extended.
  2. The above provision shall not apply to:
  1. At the end of the three years of the entry into force of the Financing Agreement, any balance for which contracts have not been signed, except those referred to in Article 9.2 here above, will be decommitted
  2. The above provision shall not apply to any balance of the contingency reserve.
  3. A contract which has not given rise to any payment within three years of its signature shall be automatically terminated and its funding shall be decommitted.

Financing Agreement - Annex I - General Conditions - BUDGET

ARTICLE 10 - ELIGIBILITY

  1. Participation in invitations to tender for works, supply or service contracts and in calls for proposals shall be open on equal terms to all natural and legal persons of the Member States of the EU and, in accordance wih the specific provisions in the basic acts governing the cooperation sector concerned, to all natural and legal persons of the beneficiary third countries or of any other third country expressly mentioned in those acts.
  2. It may be decided, on the basis of the specific conditions laid down in the basic acts governing the cooperatbn sector concerned, to albw third-country natbnals other than those referred to in paragraph 1 to tender for contracts.
  3. Goods and supplies financed by the EU and necessary for the performance of works, supply and service contracts and procurement procedures launched by the grant beneficiaries for the execution of the action financed must originate in countries eligible to participate in the terms laid down in the previous two paragraphs, except when it is provided otherwise in the basic act.

ARTICLE 11-PUBLICATION OF INFORMATION

  1. The Beneficiary undertakes to publish each year in a dedicated and easily accessible place of its internet site the title of each contract financed by the Financing Agreement, the name and natbnality of the grant beneficiary or successful tenderer as well as the amount of the corresponding grant or contract.
  2. If such internet publication is impossible, the informatbn shall be published by any other appropriate means, including the official journal of the Beneficiary. Publication shall take place during the first half of the year folbwing the cfosure of the year in respect of which the contracts and grants were awarded by the Beneficiary. The Beneficiary shall communicate to the Commissfon the address of the place of publicatbn and reference shall be made to this address in the dedicated place of the internet site of EuropeAid . If the informatbn is published otherwise, the Beneficiary shall give the Commissbn full details ofthe means used.

TITLE VI - RULES APPLICABLE TO THE PERFORMANCE OF

CONTRACTS

ARTICLE 12 - ESTABLISHMENT AND RIGHT OF RESIDENCE

  1. Where justified by the nature of the contract the Beneficiary shall entitle natural and legal persons participating in invitations to tender for works, supply or service contracts with a provisional right of establishment and residence in the Beneficiary's territory(ies). This right shall remain valid for one month after the contract is awarded.
  2. The Beneficiary shall also entitle contractors (procurement and grant contracts) and natural persons whose services are required for the performance of the contract and members of their ftunily with similar rights during the implementation of the project/programme.

ARTICLE 13 - TAX AND CUSTOMS PROVISIONS

  1. The Beneficiary shall apply to procurement contracts and grants financed by the EU the most favoured tax and customs arrangements applied to States or international development organisations with which it has relations.
  2. Where a Framework Agreement is applicable, which includes more detailed provisions on this subject, these provisions shall apply as well.

ARTICLE 14-FOREIGN EXCHANGE ARRANGEMENTS

  1. The Beneficiary undertakes to authorise the import or purchase of the foreign currency necessary for the implementation of the project. It also undertakes to apply its national foreign exchange regulations in a non-discriminatory manner to the contractors allowed to participate referred to in Article 10 of these General Conditions.
  2. Where a Framework Agreement is applicable, which includes more detailed provisions on this subject, these provisions shall apply as well.

ARTICLE 15 - USE OF DATA FROM STUDIES

Where the Financing Agreement involves the financing of a study, the contract related to this study, signed for the implementation of the Financing Agreement, shall govern the ownership of that study and shall include the right for the Beneficiary and the Commission to use data in the study, to publish it or to disclose it to third parties.

ARTICLE 16 - ALLOCATIONS OF AMOUNTS RECOVERED UNDERCONTRACTS

  1. Without prejudice to the responsibilities of the Beneficiary, the Commission may, in accordance with the relevant provisions of the Financial Regulation applicable to the general budget of the European Union formally establish an amount as being wrongly рай under a contract financed under this Financing Agreement and proceed to its recover}-- by any means.
  2. Amounts recovered by the Beneficiary from payments wrongly effected, from financial guarantees bdged on the basis of procedures of award of contracts or under a contract financed under this Financing Agreement, as well as from financial penalties imposed by the Beneficiary on candidate, tenderer, contractor or grant beneficiary, shall be returned to the Commission. The damages granted to the Beneficiary shall also be returned to the Commission.

ARTICLE 17 - FINANCIAL CLAIMS UNDER CONTRACTS

The Beneficiary undertakes to confer with the Commission before taking any decision concerning a request for compensation made by a contractor and considered by the Beneficiary to be justified in whole or in part. The financial consequences may be borne by the EU only where the Commission has given its prior approval. Such prior approval is also required for any use of funds committed under the present Financing Agreement to cover costs arising from disputes relating to contracts.

TITLE VII - GENERAL AND FINAL PROVISIONS ARTICLE 18 - VISIBILITY

  1. Every project/programme financed by the EU shall be subject to the appropriate communication and information measures. Unless otherwise agreed, the Beneficiary shall take the necessary measures to ensure the visibility of the EU funding for the project/programme. These measures shall be defined under the responsibility of the Beneficiary wih the approval of the Commissbn.
  2. These communieatbn and informatbn measures shall folbw the rules in the Communicatbns and Visibility Manual for EU External Actbns laid down and published by the Commissbn, in force at the time of the measures.

ARTICLE 19 - PREVENTION OF IRREGULARITIES, FRAUD AND CORRUPTION

  1. The Beneficiary undertakes to check regularly that the operations financed with the EU funds have been properly implemented. It shall take appropriate measures to prevent irregularities and fraud and, if necessary, bring prosecutions to recover funds wrong!}' paid.
  2. 'Irregularity" shall mean any infringement of the Financing Agreement, implementing contracts and programme estimates or of EU law resulting from an act or omission by an economic operator, which has, or would have, the effect of prejudicing the general budget of the EU, either by reducing or losing revenue accruing from own resources collected directly on behalf of the EU, or by an unjustified item of expenditure.

"Fraud" shall mean any intentional act or omission concerning:

19.3 The Beneficiary shall immediately inform the Commission of any element brough tto its attention which arouses suspicions of irregularities or fraud and of any
measure taken to deal with them.

19.4 As stated in Article 8.3, in cases of decentralised contracts, the Beneficiary will inform the Commission when a contractor has been guilty of making false
declarations or has made substantial errors or committed irregularities and fraud, or has been found in serious breach of its contractual obligations.

Without prejudice to the power of the Commission to exclude a natural or legal person from future procurement and grant contracts financed by the EU according to the Financial Regulation applicable to the general budget of the European Union financial penalties to contractors mentioned in the provision on "Administrative and Financial Penalties" of the General Conditions of decentralised contracts may be imposed to contractors by the Beneficiary if this is allowed by its national law. Such financial penalties shall be imposed , following an adversarial procedure and ensuring the right of defence of the contractor.

  1. The Beneficiary shall immediately inform the Commission of the name of the economic operators whom have been the subject of a judgment which has the force of res judicata for fraud, corruption, involvement in a criminal organisation or any other illegal activity detrimental to the EU's financial interests.
  2. The Beneficiary undertakes to take every appropriate measure to remedy any practices of active or passive corruption whatsoever in the implementation of the related contracts. Definitions in Article 8.3 apply herein.

If the Beneficiary does not take the appropriate measures to remedy any practices of corruption or fraud mentioned under this article, the Commission may adopt itself such measures including the recovery of the EU finding by any means.

ARTICLE 20 - VERIFICATIONS AND CHECKS BY THE COMMISSION, THE EUROPEAN ANTI-FRAUD OFFICE (OLAF) AND THE EUROPEAN COURT OF AUDITORS

  1. The Beneficiary agrees to the Commission, OLAF and the European Court of Auditors conducting documentary and on-the-spot checks on the use made of EU funding under the Financing Agreement (including procedures for the award of contracts and grants) and carrying out a full audit, if necessary, on the basis of supporting documents of accounts and accounting documents and any other documents relating to the financing of the project/programme, throughout the duration of the agreement and for seven years after the date of the last payment.
  2. The Beneficiary also agrees that OLAF may carry out on-the-spot checks and verifications in accordance with the procedures laid down by EU law for the protection of the EU's financial interests against fraud and other irregularities.
  3. To that end, the Beneficiary undertakes to grant officials of the Commission, OLAF and the European Court of Auditors and their authorised agents access to sites and premises at which operations financed under the Financing Agreement are carried out, including their computer systems, and to any documents and computerised data concerning the technical and financial management of those operations, and to take every appropriate measure to facilitate their work. Access by authorised agents of the Commission, OLAF and the European Court of Auditors shall be granted on conditions of strict confidentiality with regard to third parties, without prejudice to public law obligations to which they are subject. Documents must be accessible and filed in a manner permitting easy inspection, the Beneficiary being bound to inform the Commission, OLAF or the European Court of Auditors of the exact bcation at which they are kept.
  4. The checks and audits described above shall also apply to contractors and subcontractors who have received EU funding.
  5. The Beneficiary shall be notified of on-the-spot missions by agents appointed by the Commission, OLAF or the European Court of Auditors.
  6. The Beneficiary shall keep the following financial and contractual supporting documents

Procurement procedures:

Calls for proposals and direct award of grants:

In case of decentralised operations:

Elimination of unsuccessful bids five years after the closure of the procurement procedure. Elimination of unsuccessful applications three years after the closure of the grant procedure.

ARTICLE 21 - CONSULTATION BETWEEN THE COMMISSION AND THE BENEFICIARY

  1. The Beneficiary and the Commission shall consult each other before taking any dispute relating to the implementation or interpretation of this Financing Agreement further.
  2. Where the Commission becomes aware of problems in carrying out procedures relating to management of this Financing Agreement, it shall establish all necessary contacts with the Beneficiar)' to remedy the situation and, take any steps that are necessary, including, where the Beneficiary does not, or is unable to, perform the duties incumbent on it, temporarily taking the Beneficiary's place
  3. The consultation may lead to the amendment, suspension or termination of the Financing Agreement.

ARTICLE 22 - AMENDMENT OF THE FINANCING AGREEMENT

  1. Any amendment to the Special Conditions, Annex II and Annex III to the Financing Agreement shall be made in writing and be the subject of an addendum.
  2. If the request for an amendment comes from the Beneficiary, the latter shall submit that request to the Commission at least three months before the amendment is intended to enter into force, except in cases which are duly substantiated by the Beneficiary and accepted by the Commission.
  3. For technical adjustments which do not affect the objectives and results of the project/programme and alterations in matters of detail which do not affect the technical solution adopted, and with no reallocation of funds, the Beneficiary shall inform the Commission of the amendment and its justification in writing as soon as possible and apply that amendment.
  4. The use of contingency reserve shall be subject to the Commission's prior written approval.
  5. The specific cases of the extension of the operational implementation phase or closure phase are governed by Article 4 (4) and (5) of these General Conditions.
  6. Where the Commission considers that the Beneficiary ceases to satisfy the decentralisation criteria and without prejudice to Articles 23 and 24 of these General Conditions, the Commission may decide to retake the financial implementation tasks entrusted to the Beneficiary in order to continue the implementation of the project/programme on behalf, and for the account, of the Beneficiary after informing the latter in written form

ARTICLE 23. SUSPENSION OF THE FINANCING AGREEMENT

23.1 The Financing Agreement may be suspended in the following cases:

  1. No prbr notice shall be given of the suspension decisbn.
  2. The Commissbn may take any appropriate precautionary measure before suspensbn takes place.
  3. When the suspension is notified, the consequences on the ongoing contracts and programme estimates or contracts and programme estimates to be signed will be indicated.
  4. A suspensbn of the Financing Agreement is without prejudice to the suspensbn of payments by the Commissbn for the sake of ensuring sound financial management or protecting the EU's financial interests.

ARTICLE 24 - TERMINATION OF THE FINANCING AGREEMENT

  1. If the issues which led to the suspension of the Financing Agreement have not been resolved within a maximum period of 180 days, ether party may terminate the Financing Agreement at 30 days' notice.
  2. Where a Financing Agreement has not given rise to any payment within three years of is signature or no implementing contract has been signed within this period, that Financing Agreement will be terminated.

24.3 When the termination is notified, the consequences on the ongoing contracts and programme estimates or contracts and programme estimates to be signed will be indicated.

ARTICLE 25 - DISPUTE-SETTLEMENT ARRANGEMENTS

  1. Any dispute concerning the Financing Agreement which cannot be settled within a six-month period by the consultations between the parties provided for in Article 21 of these General Conditions may be settled by arbitration at one of the parties' request.
  2. In this case the parties shall each designate an arbitrator within 30 days of the request for arbitration. Failing that, either party may ask the Secretary-General of the Pennanent Court of Arbitration (The Hague) to designate a second arbitrator. The two arbitrators shall in their turn designate a third arbitrator within 30 days. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration to designate the third arbitrator.
  3. Unless the arbitrators deckle otherwise, the procedure laid down in the Permanent Court of Arbitration Optional Rules for Arbitration Involving International Organisations and States shall apply. The arbitrators' decisions shall be taken by a majority within a period of three months.
  4. Each party shall be bound to take the measures necessary for the application of the arbitrators' decision.

ANNEX II TO FINANCING AGREEMENT № ENPI72012/023-420

TECHNICAL AND ADMINISTRATIVE PROVISIONS

Beneficiary country / region

The Republic of Moldova

Requesting Authority

The Government of the Republic of Moldova

Budget heading

Budget line 19.080103

Title

Support for the Justice Sector

Total cost

EUR 60 million, out of which:

- EUR 52 million from the ENPI 2012 Annual Action Programme in favour of the Republic of Moldova (ENPI/2012/023-420)

- EUR 8 million from the ENPI 2012 Special Measure "EaPIC" (Eastern Partnership Integration and Cooperation) programme (ENPI/2012/024-3 59)

Aid method/ Management

mode

Sector Policy Support Programme (direct centralised management)

Sector budget support: EUR 58.2 million Project approach: EUR 1.8 million

DAC-code

15130

Sector

Legal and judicial development

1. INTERVENTION

  1. Objectives

The overall objective of the Justice Sector Reform Strategy is to build an accessible, efficient, independent, transparent, professional justice sector, with high public accountability and consistent with European standards, to ensure the rule of law and protection of human rights.

Specific objectives of the Strategy include:

The objective of the EU Sector Policy Support Programme is to support the Government of the Republic of Moldova in the implementation of its Justice Sector Reform Strategy and the realisation of its objectives.

The Programme is focussed on issues of governance and the protection of human rights within the justice system. Climate change, environmental sustainability, and gender equality issues are not directly relevant, although the improved and impartial application of the law will have significant benefits in these areas. Gender equality in the justice system, both in terms of employment and appointments and in terms of treatment as litigants, is a central feature of equal and fair treatment and access to justice. Practices that discriminate on the basis of gender, race, poverty or any other characteristic will be actively discouraged and where they occur penalised.

In line with the principle of "more for more", this Programme benefits from an additional EUR 8 million funding under the Eastern Partnership Integration and Cooperation (EaPIC) programme, with the aim of fostering democratic transformation and institution building.

  1. Expected results and Main activities

While it has the same overall objectives as the Republic of Moldova Government's Justice Sector Reform Strategy, the Programme will focus on key areas of reform in its conditions for disbursement.

Under Sector Reform Management:

Under Reform of the Judiciary:

Under Reform of Investigation and Prosecution:

Under the Enforcement of Judgements:

Under Juvenile Justice:

Under Intolerance towards Corruption:

Under Additional Measures to Improve Human Rights Protection in Moldova:

1.3 Duration

The execution period of the Agreement (for complementary assistance) will be 72 months. This execution period will comprise 2 phases under the conditions provided for in article 4.1 of the General Conditions (Annex I of the present Agreement):

  1. Operational implementation phase that starts from the entry into force of the financing agreement and will have duration of 48 months.
  2. Closure phase of a duration of 24 months that starts from the expiry date of the operational implementation phase.

Pursuant to article 6 of the General Conditions (Annex I of the present Agreement), the contracts implementing the financing agreement shall be signed at the latest within three years of the entry into force of the financing agreement (except audit and evaluation). That deadline may not be extended ('sunset clause').

2. IMPLEMENTATION

2.1 Implementation method and Procurement and Payment clauses Sector Budget Support

Up to EUR 58.2 million, including EUR 8 million from the Eastern Partnership Integration and Cooperation (EaPIC) programme, will be released as untargeted budget support under direct centralised management to the State Treasury.

The Government of the Republic of Moldova will confirm that the relevant Treasury account has been credited and provide documentary evidence of the transfer, including the exchange rate used.

Disbursement shall be made in four instalments. First instalment shall be made of a fixed component only. The subsequent instalments shall be made of a fixed share and of a variable share.

The release of each instalment shall depend on the assessment of the level of compliance with specific conditions as described in sections 2.2 and 2.3 below and as detailed in appendices 1 and 2.

The EUR 8 million funding from the Eastern Partnership Integration and Cooperation (EaPIC) programme, payable in fixed tranches, is included in the three first instalments, as described in section 2.2 below and as detailed in appendix 2.

Project Approach (complementary technical assistance)

EUR 1.8 million is reserved for complementary technical assistance under direct centralised management.

Procurement Clause: All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents drawn up and published by the Commission for the implementation of external operations in force at the time of the launch of the procedure in question.

Payment Clause: All payments must be made by the Commission in accordance with the general and specific conditions of the Financing Agreement and with the procedures and standard documents drawn up and published by the Commission for the implementation of external operations in force at the time of the launch of the procedure in question.

Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by ENPI Regulation. Further extensions of this participation to other natural or legal persons by the concerned authorising officer shall be subject to the conditions provided for in article 21(7) of the ENPI Regulation.

Amount

EU contribution

Sector/ministry budget/funding over programme duration

Budget Support

EUR 58.2 million

EUR 58.2 million

EUR 88.1 million1

Technical Cooperation (including audit, evaluation and visibility)

EUR 1.8 million

EUR 1.8 million

Total

EUR 60.0 million

EUR 60.0 million

EUR 88.1 million

2.2.1 Budget

2.2 Budget and calendar

2.2.2 Calendar

The operational implementation phase of the programme will be 48 months following the entry into force of the Financing Agreement.

Budget Support

Up to EUR 58.2 million will be disbursed in four instalments:

The amount and specific timing of each disbursement shall be based on an assessment of compliance with the General and Specific Conditions detailed in Appendix 2 of these Technical and Administrative Provisions. With the exception of the first instalment, which will be fixed, instalments will comprise both a fixed and a variable component.

Fixed components relate to management of the sector reform and are considered a prior requirement for successful reform at the subsector level, which is covered by variable components. EaPIC funds also specifically link to additional measures aimed at improving human rights protection.

First

Second

Third

Fourth

Instalment

Instalment

Instalment

Instalment

Indicative Assessment

2nd quarter 2013

1st quarter 2014

1st quarter 2015

1st quarter 2016

Indicative Disbursement

2nd quarter 2013

2nd quarter 2014

2nd quarter 2015

2nd quarter 2016

Fixed Component

(2012 annual action programme)

13.0

6.0

3.0

1.3

Forecasts as per Medium Term Budget Framework 2012-2014

Indicative Disbursement Calendar Budget Support (amounts in EUR millions)

Fixed Component (2012 EaPIC programme)

2.0

3.0

3.0

-

Variable Component (maximum)

-

6.0

9.0

11.9

Total (up to)

15.0

15.0

15.0

13.2

Disbursements will be paid into the Treasury Account, indicatively in the second quarter of each year (subsequent to an independent review of compliance) of the programme operational implementation phase of the Financing Agreement.

Instalments will be released subject to compliance with the General Conditions defined in Section 3 of Appendix 2 and the relevant Specific Conditions defined in Section 4 of Appendix 2. The amounts of every fixed and variable component of each instalment, as well as the weight of the conditions linked with the payment of the variable components are further detailed in section 5 of Appendix 2.

Amounts under the variable component may be lower than those shown where government fails to fully comply with the specific conditions for disbursement. Funds withheld for limited performance in variable components will be lost at the end of the Programme. In duly justified cases, however, a re-assessment of unmet targets in the following year against the original target will be possible during the implementation of the Programme:

  1. if there is an overall positive trend at programme level, and
  2. if the government did not reach the target as originally scheduled because of external factors.

Complementary assistance will be scheduled as required and will include at least the compliance reviews for the second, third, and fourth instalments, and an ex-post evaluation after the fourth instalment.

2.3 Performance monitoring and criteria for disbursement

This operation may be subject to review in light of the implications of the Commission's revised policy on budget support.

2.3.1. Description of performance monitoring arrangements:

Ongoing technical and financial monitoring of implementation of the Justice Sector Reform Strategy and, inter alia, of the European Union Sector Policy Support Programme (EU SPSP) for Justice Sector Reform, is the responsibility Strategic Planning and Development Department of the Ministry of Justice, in cooperation with justice sector stakeholder institutions, coordinated under the auspices of the justice sector coordination body: the National Council for Law Enforcement Bodies' Reform.

Elaboration of an efficient monitoring and reporting mechanism is a condition for disbursement of the first instalment of the Programme, and its further improvement and effective operation is a condition for release of subsequent instalments. Generation and improved management of data for this monitoring of performance in implementing reforms and achieving desired impacts are also built into the stages of the reform process and reflected in EU SPSP disbursement conditions.

A coordination mechanism for justice sector reform is proposed under the Justice Sector Reform Strategy. An inter-agency coordination mechanism: the National Council for Law Enforcement Bodies' Reform was established by the President in May 2011, with membership comprising representatives from all sector agencies (whether part of the executive, legislature, or judiciary), as well as civil society and donor organisations as observers. The Ministry of Justice has day-to-day responsibility for managing the reform process and intends to strengthen its Strategy Planning and Development Department for this purpose. Seven working groups are to be established to support implementation of reforms in each of the seven pillars of the Strategy, with each working group comprising members of all relevant stakeholder organisations.

Overall donor coordination is the responsibility of the State Chancellery, but each sector is overseen by the relevant sector ministry. The Ministry of Justice has established a donor coordination mechanism that meets periodically to examine progress and new requirements. The process is expected to be strengthened during the implementation of the SPSP through assistance provided under the ENPIAAP 2011 technical assistance projects. Meanwhile, donors themselves coordinate through a justice sector coordination group.

2.3.2 Programme Oversight

Oversight of the Programme, and responsibility for the overall monitoring of the status of compliance with the conditions for disbursement, will be entrusted to a Steering Committee chaired by the Minister of Justice. This Steering Committee will include members of key ministries and institutions directly involved in the implementation of the present programme2, and representatives of the European Union.

The following permanent members of the Steering Committee are foreseen:

Representatives of the following Institutions will also participate according to the areas of reform in discussion:

The Minister of Justice may propose additional members to the Steering Committee.

The Ministry of Justice shall be in charge of organising and convening Steering Committee meetings. The members shall be notified in writing, with draft agenda and, if any, minutes of the previous meeting. The composition of the Steering Committee may be changed in the light of the institutional changes.

If relevant, the Steering Committee may decide to invite, as observers or as experts, members of other ministries or institutions relevant for the reforms, representatives of Moldovan civil society, EU technical assistance teams supporting justice sector reforms in Moldova, experts from international organisations or other relevant stakeholders.

The Steering Committee shall meet at least twice a year to assess progress of the reforms promoted by the Programme. The Steering Committee will identify possible constraints to compliance with the conditions for instalment release and resolve these in a timely manner, prior to the compliance reviews. The Steering Committee shall review and approve annual progress reports drafted by the Working Groups for each pillar of the Strategy. Where appropriate and due to external factors or change of circumstances, the Steering Committee may propose modifications to the implementation of the Programme.

To guarantee sound implementation of the Programme, the Steering Committee will ensure that the Government of the Republic of Moldova fulfils its commitment to:

  1. associate the European Union in all government-donor discussions and institutional arrangements on the elaboration and implementation of annual budgets and related Medium-Term Budgetary Framework;
  2. associate the European Union in all government-donor discussions and institutional arrangements on the elaboration and implementation of its strategy and action plan for reform of the justice system and any developments related to the rule of law and human rights;
  3. ensure that any substantial revision undertaken by the government and sector agencies of the structure

* Representatives of those sub-sectors only where specific policy conditions have been identified

and/or charter of justice sector institutions supported through the Programme will be subject to prior notification of the European Union; and

4. ensure that the Ministry of Finance makes the draft annual budget, particularly for fiscal years 2013, 2014, 2015 and 2016 available to the European Union prior to its adoption.

The Steering Committee will also ensure that the Government of the Republic of Moldova, at all times, makes available to the European Union (including the EU Delegation, EU Justice Sector Reform technical assistance teams under ENPI AAP2011, members of short-term specialist missions, and the compliance reviews) the following documentation related to the implementation of the Programme:

  1. bank statements relevant to the transfer referred to in Section 2.1 of these Technical and Administrative Provisions;
  2. statements of expenditures (Treasury) on sectors relevant to the Programme;
  3. reports on budget execution of the general and specific budgets, developed in line with instruction of the Ministry of Finance, of the involved bodies: the National Council for Law Enforcement Bodies' Reform, the Ministry of Justice (including the Penitentiary Department, Probation Service, Judicial Administration, and Legal Approximation Centre), the Ministry of Internal Affairs (including investigative services), Prosecutor General's Office, Superior Council of Prosecutors, Superior Council of Magistrates, the various levels of Courts (Supreme, Appeals, District and), Constitutional Court, the National Institute of Justice, the National Council for State Guaranteed Legal Assistance, the National Union of Bailiffs, the Centre for Combatting Economic Crime and Corruption, the Parliamentary Advocates and the Centre for Human Rights, Ministry of Education and Science, and Ministry of Health;
  4. laws, government decrees, and other legislative acts and administrative provisions, draft and final, related to the implementation of the Programme;
  5. reports and agreements with the IMF and World Bank, the United Nations and its agencies, the Council of Europe and its agencies; and
  6. government and other donor policy documents and reports, draft and final, relevant to the implementation of the Programme.

2.3.3. Criteria for disbursement

General and specific conditions for the disbursement of all budget support instalments are specified in Appendix 2. They are drawn from the government's Action Plan for implementation of the Justice Sector Reform Strategy 2011-2016.

General Conditions for the disbursement of all instalments cover the eligibility criteria for budget support, and include:

Compliance with these General Conditions is a precondition for any disbursement of every instalment and for the consideration of compliance with Specific Conditions for disbursement of each instalment.

The levels of disbursement of each instalment will depend on compliance with the performance indicators and Specific Conditions specified in the Financing Agreement for each instalment, with compliance with fixed component indicators and variable component disbursement conditions. Details of Specific Conditions for the disbursement of instalments are elaborated in Appendices 1 and 2 with expected performance levels and timetable, indicators, base and target values for the first year and indicative values for subsequent years; standard table listing conditions for instalment release. In summary, Specific Conditions for disbursement relate to:

for the fixed component,

• additional measures to improve human rights in Moldova (as part of EaPIC additional funds), and for the variable component,

Analysis of the chosen performance indicators in Appendix 1 confirms that they are of adequate quality to justify their use for the disbursement of budget support.

The chosen performance targets and indicators specified in Appendix 1 for each instalment will apply for the duration of the programme. However, in duly justified circumstances, the Government of the Republic of Moldova, subject to approval by the Steering Committee and suitable justification, may submit a request through the European Union Delegation to the European Commission for the targets and indicators to be changed. This must be done at least 3 months in advance of the planned compliance review. Changes agreed to the targets and indicators may be authorised by exchange of letters between the the European Commission and the Government of the Republic of Moldova.

3. MONITORING. EVALUATION AND AUDIT

Day-to-day technical and financial monitoring will be the responsibility of the Beneficiary and a continuous process. To this aim, the Beneficiary shall establish a monitoring and reporting system3 for regular reporting on implementation of justice sector reforms specified in the government's approved Strategy and Action Plan and, inter alia, compliance with EU SPSP policy reform disbursement conditions as identified in Appendices 1 and 2.

The Programme will be reviewed once a year to assess compliance with the conditions for release of the instalments as detailed in the Appendix 2 of these Technical and Administrative Provisions. These compliance reviews will be timed to meet the indicative disbursement schedule presented in the Appendix. With the exception of the first instalment, the compliance review of which will follow signature of the Financing Agreement, the review of the programme to assess compliance with the conditions for disbursement of the other instalments shall be carried out indicatively in the first quarter of each year from 2014-2016 to meet the foreseen (indicative) disbursement schedule of releasing instalments in the second quarter of each year (2014, 2015 and 2016). Upon the request of the Steering Committee the compliance review might be carried out in two phases through an interim review in the third quarter of the year

Agreed upon by the inter-agency justice sector coordination council, Ministry of Justice and relevant stakeholders.

reviewed and a final review in first quarter of the following year. A final review in 2016 will also undertake an evaluation of the Programme, including its impact and sustainability.

The European Commission may also launch a full ex-post evaluation at a later date.

Compliance reviews and evaluation will be funded from the complementary technical assistance component of the Programme.

4. COMMUNICATION AND VISIBILITY

As part of the Financing Agreement, the Government of the Republic of Moldova undertakes to ensure that the visibility of the EU contribution to the SPSP Programme is given appropriate coverage in the various publicity media. The project will endeavour to further enhance the positive image of the EU in the context of its work in Moldova. At appropriate milestones during the project duration and after appropriate events, press releases will be issued, in co-operation with the EU Delegation in Chisinau. Communication and Visibility Manual for EU External Actions will be applied. Support for visibility will be financed from the complementary technical assistance component of the Programme or from other budgetary sources.

APPENDICES

  1. - Performance criteria and indicators used for disbursement (Policy Matrix)
  2. - Disbursement arrangements and timetable

Appendix 1: Performance criteria and indicators used for disbursements (Policy Matrix)

NU - National Institute of Justice PGO - Prosecutor General's Office PFM - Public Finance Management

PEFA - Public Expenditure Finance Accountability Assessment PFP - Public Finance Policy SCM - Superior Council of Magistrates SCP - Superior Council of Prosecutors NSA - Non-state Actors

GRECO - Council of Europe's Group of States against Corruption

List of acronyms

GoM - Government of the Republic of Moldova JSRS - Justice Sector Reform Strategy ICC - Interagency Coordination Council represented by the National Council for Law Enforcement Bodies Reform (NCLEBR) MoF - Ministry of Finance MoIA - Ministry of Internal Affairs MoJ - Ministry of Justice CSO - Civil Society Organizations ECHR - European Court of Human Rights

SUMMARY

Budget Support Components

Is' Instalment

Indicative review date - 2nd quarter 2013

2nd Instalment

Indicative review date - lsl quarter 2014

3rd Instalment

Indicative review date - 1sl quarter 2015

4"' Instalment

Indicative review date - lsl quarter 2016

ANNUAL ACTION PROGRAMME (EUR 50.2 million)

FIXED COMPONENT (EUR 23.3 million) (TABLE A)

Relative share of instalment

100%

50%

25%

10%

Value

EUR 13.0 million

EUR 6 million

EUR 3 million

EUR 1.3 million

VARIABLE COMPONENT (EUR 26.9 million) (TABLE B)

Relative share of instalment

50%

75%

90%

Value

EUR 6 million

EUR 9 million

EUR 11.9 million

EaPIC PROGRAMME (EUR 8.0 million)

FIXED COMPONENT (EUR 8.0 million) (TABLE C)

Relative share of instalment

100%

100%

100%

Value

EUR 2.0 million

EUR 3 million

EUR 3 million

TOTAL

EUR 15 million

EUR 15 million

EUR 15 million

EUR 13.2 million

Budget Support Components

1st Instalment

Indicative review date - 2nd quarter 2013

2nd Instalment

Indicative review date - Is' quarter 2014

3rd Instalment

Indicative review date - 1sl quarter 2015

4th Instalment

Indicative review date - Is' quarter 2016

Relative Share of Fixed Instalment

100%

50%

25%>

10%

Value

EUR 13.0 million

EUR 6 million

EUR 3 million

EUR 1.3 million

Al. Justice Sector Reform Institutional and Legislative Framework

A 1.1 Institutional set-up for sector reform management, coordination, monitoring and consultative mechanism

Reporting Coordinators: MoJ, ICC

1. The Strategy Implementation
Coordination group established

Means of verification: list of membership.

2. Working groups for the
monitoring of each of the 6 JSRS
pillars established, Secretariat
created and staffed.

Means of verification: MoJ's order on the creation of the working groups and nomination of the Secretariat.

3. Mechanism for consultations and
cooperation with CSO/NSA and
donors established and
institutionalized.

Means of verification: Mechanism established under MoJ coordination

1. Reports of performance in the
implementation of the reform
strategy submitted to MoJ.

Means of verification: annual progress report, including on staffing training achieved, submitted by each working group.

2. Mechanism for consultations and
cooperation with CSO/NSA and
donors is functional.

Means of verification: Minutes of the meetings.

1. Reports of performance in the
implementation of the reform
strategy submitted by justice sector
institutions.

Means of verification: annual progress report, including on staffing training achieved, submitted by each working group.

2. Mechanism for consultations and
cooperation with CSO/NSA and
donors is functional.

Means of verification: Minutes of

1. A consolidated Implementation
report per each pillar is approved
and published.

Means of verification: approved reports published on the SRSJ's web-site.

2. Mechanism for consultations and
cooperation with CSO/NSA and
donors is functional.

Means of verification: Minutes of

the meetings.

the meetings.

A 1.2 Legislative Framework

1. Action Plan to implement the SRSJ (Action Plan) is budgeted.

Means of verification: Evidence

1. Action Plan to implement the SRSJ (Action Plan) is budgeted.

Means of verification: Evidence

1.1. Action Plan to implement the SRSJ (Action Plan) is budgeted.

Means of verification: Evidence

1.1. Action Plan to implement the SRSJ (Action Plan) is budgeted.

Means of verification: Evidence

Reporting Coordinator:

MoJ in close collaboration with MoF

that Action Plan costs are reflected in the state annual budget.

that Action Plan costs are reflected in the stale annual budget and in the Medium-Term Budget Framework (MTBF)

that Action Plan costs are reflected in the state annual budget and in the Medium-Term Budget Framework (MTBF).

that Action Plan costs are reflected in the state annual budget and in the Medium-Term Budget Framework (MTBF).

A 1.3 Public Awareness Reporting Coordinator:

1. Public communication plan to disseminate the results of the SRSJ's implementation developed.

Means of verification: preliminary

1. SRSJ's web-page developed and regularly updated.

Means of verification: functional

1. SRSJ's web-page developed and regularly updated.

Means of verification: functional

1. SRSJ's web-page developed and regularly updated.

Means of verification: functional

MoJ

report on the public communication plan (including media outlets, frequency of communication, target audiences, cost and responsibility for delivery)

and updated web-page.

and updated web-page.

and updated web-page.

A 2. Public Finance

A 2.1 Public Finance Management

Reporting Coordinator: MoF

1. Public Finance Management
Consolidation (PFMC) Strategy
2013-2020 and Action Plan
approved (also based on 2008-2010
PEFA Assessment).

Means of verification: the PFMC Strategy 2013-2020 approved and transmitted to the EU Delegation.

2. At least one meeting held on
PFMC Strategy 2013-2020
involving Parliament and the Court
of Accounts.

Means of verification: MoF transmission of (i) minutes and (ii) press release of the meeting.

1. Public Finance Management
Consolidation Strategy 2013-2020
with Action Plan put into force.

Means of verification: (i) Strategy published in the MoF website.

2. At least one meeting held on
PFMC Strategy 2013-2020 and
related Action Plan development,
involving Parliament. Court of
Accounts.

Means of verification: MoF transmission of (i) minutes and (ii) press release of the meeting.

3. At least one consultative meeting
held on PFMC Strategy 2013-2020
and related Action Plan
development, involving civil
society/NGOs specialised in budget
policy and donors community.

Means of verification: MoF transmission of (i) minutes and (ii) press release of the meeting.

1. Public Finance Management
Consolidation Strategy 2013-2020
with Action Plan on-going
implementation.

Means of verification: a synthetic and result-oriented progress implementation report transmitted to the EU Delegation

2. At least one meeting held on
PFMC Strategy 2013-2020 and
related Action Plan development,
involving Parliament, Court of
Accounts.

Means of verification: MoF

1. Public Finance Management
Consolidation Strategy 2013-2020
with Action Plan on-going
implementation.

Means of verification: a synthetic and result-oriented progress implementation report transmitted to the EU Delegation

2. At least one meeting held on
PFMC Strategy 2013-2020 and
related Action Plan development,
involving Parliament, Court of
Accounts.

Means of verification: MoF

transmission of (i) minutes and (ii) press release of the meeting.

3. At least one consultative meeting held on PFMC Strategy 2013-2020 and related Action Plan development, involving civil society/NGOs specialised in budget policy and donors community.

Means of verification: MoF transmission of (i) minutes and (ii) press release of the meeting.

transmission of (i) minutes and (ii) press release of the meeting.

3. At least one consultative meeting held on PFMC Strategy 2013-2020 and related Action Plan development, involving civil society/NGOs specialised in budget policy and donors community.

Means of verification: MoF transmission of (i) minutes and (ii) press release of the meeting.

A 2.2 Budget Planning

Reporting Coordinator: MoF

1. Medium-Term Budget Framework (MTBF) 2014-2016 approved and published;

Means of verification: Decision on, and publication of the MTBF 2014-2016 on the appropriate government website.

1. Medium-Term Budget Framework (MTBF) 2015-2017 approved and published.

Means of verification: Decision on. and publication of the MTBF 2013-2015 on the appropriate government website.

1. Medium-Term Budget Framework (MTBF) 2016-2018 approved and published.

Means of verification: Decision on, and publication of the MTBF 2016-2018 on the appropriate government website

A 2.3 Debt management Reporting Coordinator: MoF

1. Medium-term Debt Management Strategy 2014-2016 approved and published;

Means of verification: Decision on Debt Management Strategy 2014-2016.

1. Medium-term Debt Management Strategy 2015-2017 approved and published.

Means of verification: Decision on Debt Management Strategy 2015-2017.

1. Medium-term Debt Management Strategy 2016-2018 approved and published.

Means of verification: Decision on Debt Management Strategy 2016-2018.

A 2.4 Reporting

Reportina Coordinator: MoF

1. PEFA Assessment 2011-2013 completed.

Means of verification: Public-Financial Management Performance Report 2011-2013 published in the MoF website.

Budget Support Components

2nd Instalment

Indicative review date - 1st quarter 2014

3rd Instalment

Indicative review date - 1st quarter 2015

4th Instalment

Indicative review date - lsl quarter 2016

Relative Share of Variable Instalment

50%

75%

90%

Value

EUR 6.0 million

EUR 9.0 million

EUR 11.9 million

B lJTudiciary system

B 1.1 Legislative and Regulatory Framework

Reporting Coordinators: MoJ, SCM, PGO

1. Criminal procedure code amended to modernise the appeal system by determining the legal grounds for appeal and introduction of admissibility stage.

Means of verification: amendments drafted and submitted to Parliament.

1. Amendments to the relevant legislation
drafted to ensure independence of the judiciary,
duty of impartiality; strengthening self-
regulation through SCM; criteria and procedures
for selection, appointment, promotion and
dismissal of judges.

Means of verification: amendments to the relevant laws drafted and submitted to Parliament.

2. Excluding from the Criminal Procedure Code
"unless it is not possible" clause as related to
the obligation to audio record hearings in court
and introducing the obligation of judge to
inform the parties in a trial on their right to
have their trial audio-recorded.

Means of verification: amendments to relevant Codes adopted.

1. Changes implemented and new procedures applied in practice.

Means of verification: Reports bv independent experts on the application of the new procedures, independence and efficiency of the judiciary system.

B 1.2 Institutional, Organisational and Functional Framework

Reporting Coordinators: MoJ, SCM

1. Audio recording performed for all cases of very serious and exceptionally serious crimes at trial level.

Means of verification: Percentage of cases in which audio recording is performed.

1. New procedure for selection, promotion and
transfer of judges is fully functional;

Means of verification: number of judges selected, promoted and transferred in accordance with new procedures.

2. Amendments to the Law on judicial
organisation adopted in line with conclusions of
the study on court network adjustment;

Means of verification: amendments adopted.

3. Audio recording performed for all cases
examined by the courts of appeals;

Means of verification: number of courts using audio recording, percentage of cases in which audio recording is performed.

1. Judiciary Information and Management
System in use across judiciary network.

Means of verification: number of courts using the information and management system.

2. Fully costed projects for the
renovation/replacement of the court facilities.

Means of verification: projects for the renovation/replacement of the court facilities.

3. Audio recording performed for all cases in all
courts.

Means of verification: number of courts using audio recording, percentage of cases in which audio recording is performed.

B 2. Pre-judicial investigation process

B 2.1 Legislative and Regulatory Framework

Reporting Coordinators: MoJ, PGO, MoIA

1. Amendments to criminal procedure and other
relevant acts are drafted to ensure efficiency of
the investigation and prosecution and
compliance of criminal legislation with human
rights standards in line with the SJSR and
ECHR.

Means of verification: Amendments to Criminal Procedure Code and other relevant legislation drafted and submitted to Parliament.

2. Amendments to the Law on the public
prosecution office and other relevant acts
drafted to ensure a strengthened role and
financial autonomy of the Superior Council of
Prosecutors according to the SJSR.

Means of verification: Amendments to the Law on prosecution office and other relevant legislation drafted and submitted to Parliament.

1. Amendments to Criminal Procedure Code
and to the Law on public prosecution office
adopted.

Means of verification: amendments adopted.

2. Development of the informational system
"The Register of criminalist and criminological
information".

Means of verification: Register developed.

1. New procedures applied in practice.

Means of verification: Reports bv independent experts on the application of new procedures.

B 2.2 Institutional, Organisational and Functional Framework

Reportine Coordinators: MoJ, PGO, MoIA, NIJ

1. Performance indicators for criminal
investigation bodies and prosecution are
developed.

Means of verification: Regulation on performance indicators for criminal prosecution bodies and prosecutors drafted.

2. A concept of automated system to register
and analyse criminal statistics and other data
and to record offences and complaints
developed.

Means of verification: the concept developed.

1. Performance indicators and merits based system of selection and promotion is functional.

Means of verification: number of criminal prosecution officers and prosecutors selected and evaluated in accordance to new procedures.

1. Programs for information, assistance, and
rehabilitation of the victims of crimes are
drafted.

Means of verification: Programmes drafted.

2. Information Management System compatible
with the one used in judiciary in use across PGO
and MoIA.

Means of verification: Reports on compatibility across the justice institutions.

B 3. Enforcement of Court Decisions

B 3.1 Legislative and Regulatory Framework

Reporting Coordinators: MoJ

1. Amendments to regulatory framework drafted for probation to ensure management through individual plans.

Means of verification: amendments drafted.

1. Amendments to primary and secondary legislation to remove deficiencies in enforcement of courts decisions, including ECHR and foreign court decisions drafted;

Means of verification: amendments drafted.

1. Amendments to primary and secondary legislation to remove deficiencies in enforcement of courts decisions adopted.

Means of verification: Amendments adopted.

B 3.2 Institutional, Organisational and Functional Framework

Reporting Coordinators:

MoJ, Probation Service, Union of Bailiffs, Department of Penitentiary Institutions

1. A standardised system developed for recording and registering restraint, arrest and detention.

Means of verification: system for recording and registering restraint, arrest and detention developed and submitted to relevant authorities for approval.

2. Reorganisation of probation service as autonomous agency under MoJ and electronic database and information management system for probation created.

Means of verification: reports/decisions on reorganisation adopted. Information Management System created.

1. Introduction of individual probation plans for probationers initiated.

Means of verification: number of probationers with individual probation plans.

2. Implementation of recommendations for institutional reform to strengthen the effectiveness of judicial execution.

Means of verification: amendments drafted.

  1. Psycho-social assistance at the pre-sentence stage available across the country.

Means of verification: number of staff hired/trained, number of persons assisted.

  1. Medium term plan for the reconstruction and/or rehabilitation of the custody facilitates implemented.

Means of verification: plan for the reconstruction, funds allocated, number of custody facilities reconstructed.

  1. Information Management System compatible with the one used in judiciary in use across Department of Penitentiary Institutions, Probation Services and Bailiffs.

Means of verification: Reports on compatibility across the justice institutions.

B 4. Juvenile justice system

B 4.1 Legislative and Regulatory Framework

Reporting Coordinators: MoJ 1. Assessment on the need for amendments to the primary and secondary legislative framework affecting agencies in the justice system working with children and juveniles.

Means of verification: Assessment completed, recommendations formulated and results presented to relevant stakeholders.

  1. Legislative amendments related to juveniles within the justice system developed and submitted to relevant authorities.

Means of verification: amendments drafted and submitted to relevant authorities.

  1. The normative framework for strengthening the juvenile justice system improved, including strengthening the institution of protection of children victims or witnesses in the criminal proceedings and the system of collection and analysis of data on children in contact with the justice system

Means of verification: Amendments drafted.

1. The normative framework for strengthening the juvenile justice system improved, including strengthening the juvenile probation system and ensuring respect for the rights of detained children.

Means of verification: Amendments approved.

B 4.2 Institutional. Organisational and Functional Framework

Reporting Coordinators:

MoJ, Department of Penitentiary Institutions, Probation Service 1. Transfer carried out of all pre-trial and sentenced juveniles in custody to refurbished Goieni prison.

Means of verification: percentage of the juveniles in custody transferred and detained in Goieni prison.

1. Development, testing and application of general and professional education programs for children in custody.

Means of verification: programmes developed and applied.

  1. All children and juveniles in custody and in contact with probation services managed through individual development plans based on psychological and educational assessment, agreed with the juvenile and his/her family.

Means of verification: number of the individual development plans for juveniles.

  1. Opportunity created for juveniles in conflict
    with the law to participate in

apprenticeship/employment schemes.

Means of verification: number of juveniles trained/employed on the basis of the apprenticeship/employment schemes.

  1. Recruitment of juvenile probation counsellors with psychology and social assistance background according to the approved plan.

Means of verification: number of staff recruited and trained.

  1. Effective complaints system for pre-trial and sentenced juveniles and independent monitoring mechanism expanded and operational nationally.

Means of verification: Report from independent experts.

B 5. Intolerance towards corruption

B 5.1 Legislative and Regulatory Framework

Reporting Coordinators: MoJ. NAC

1. Draft legal and regulatory framework in order
to:

- reduce the level of immunities forjudges and other justice sector professionals;

- make reporting of corruption obligatory for all justice sector professionals;

- introduce obligations that prevent public officials from hiding their property and/or its origin.

Means of verification: amendments drafted and submitted to Parliament.

2. A declaration on veracity and completeness
of information on the personal interest, asset
and income statement introduced in the
statement under the sanction of perjury.

Means of verification: declaration introduced.

1. Legislative and regulatory amendments
drafted to allow the application of integrity tests
to assess new and incumbent justice sector
professionals and on the completion and
verification of personal interest, asset, and
income statements by justice sector
professionals in order to combat illegal
enrichment.

Means of verification: amendments drafted and submitted to Parliament.

2. Amendment or, where appropriate,
development of codes of professional ethics for
the actors of the justice sector.

Means of verification: Amendments to the ethical codes elaborated and adopted.

3. Legal provisions on whistleblowers in line
with GRECO Recommendations enforced.

Means of verification: internal regulations on the protection of whistleblowers adopted.

1. The concept of civil forfeiture introduced and applied in cases of all illegal activity proceeds, including corruption.

Means of verification: amendments drafted and submitted to Parliament.

B 5.2 Institutional, Organisational and Functional Framework Reporting Coordinator: MoJ. MLSPF, MoF

1. Schedule for the progressive increase in salaries in the judicial sector, reflected in organic Law.

Means of verification: Law on salaries for justice sector adopted.

2. Completion of personal interest, asset and income statements, supported by a publicly accessible NIC website.

Means of verification: number of personal interest, asset and income statements submitted and published on the web-site.

1. Periodical performance evaluation system for judges introduced and majority of judges evaluated; new system for judges' disciplinary violations assessment introduced. Means of verification: number of judges evaluated according to the new system of performance evaluation.

1. Salaries in the judicial sector increased according to agreed schedule reflected in budget documents for FY2016.

Means of verification: Evidence in 2016 state budget law MTBF 2016-2018.

2. Regular integrity tests for new applicants and incumbent justice sector office introduced.

Means of verification: legal framework adopted.

Budget Support Components

1st Instalment

Indicative review date - 2nd quarter 2013

2nd Instalment

Indicative review date - Pl quarter 2014

3rd Instalment

Indicative review date - P' quarter 2015

Relative Share of Fixed Instalment

100%

100%,

100%

Value

EUR 2.0 million

EUR 3.0 million

EUR 3.0 million

CI. Additional measures to improve Human Rights Protection in Moldova

C 1.1 Legislative and Regulatory Framework

Reporting Coordinators: GoM. MoJ

1. Establishing of the Equality Council.

Means of verification: The Equalitv Council is established.

2. Development and adoption of the secondary
legislation, necessary for the implementation of
the Law on ensuring equality.

Means of verification: Secondarv legislation drafted and adopted.

1. Draft, approve and start the implementation
of the Road Map on implementation of the Law
on ensuring equality and raising awareness on
discrimination issues.

Means of verification: The Road Map is drafted and approved by the Equality Council; A national raising awareness campaign is launched.

2. Draft and approve training programmes and
issue training manuals forjudges based on local
and international jurisprudence and practices,
including on the comprehensive ban on
discrimination based on sexual orientation
according to the UN and CoE standards.

Means of verification: Training programmes developed and approved, training manuals issued; Number of judges informed and trained in line with the manuals.

1. Ensure the effective realisation of the Road
Map on implementation of the Law on ensuring
equality and raising awareness on discrimination
issues.

Means of verification: Number of actions from the Road Map implemented.

2. Draft, submit and adopt the Law on
ratification of the Protocol nr. 12 to the ECHR.

Means of verification: The Law is adopted and published.

C 1.2 Legislative and Regulatory Framework

Reporting Coordinators: GoM, MoJ

1. Creation of the working group for the identification of shortcomings and gaps existing in Moldovan criminal procedure code incompatible with the provisions of art. 5 of the Convention and ECHR case-law.

Means of verification: Working group created and its working plan confirmed.

1. Identification of shortcomings and gaps existing in Moldovan criminal procedure code incompatible with the provisions of art. 5 of the Convention and ECHR case-law and development of amendments to the Criminal Procedure Code.

Means of verification: ComDatibilitv studv completed, recommendations formulated and presented to relevant stakeholders; Amendments drafted.

1. Amendments to Criminal Procedure Code adopted.

Means of verification: Amendments adopted.

C 1.3 Legislative and Regulatory Framework

Reporting Coordinators

Parliament, GoM, MoJ, MoF, Centre for HR:

Assessment of real needs of the Centre for Human Rights in view of consolidation of its independence and institutional capacity, raising effectiveness of its activity.

Means of verification: Assessment report by independent experts completed, recommendations formulated and presented to relevant stakeholders.

1. Consolidation of independence and efficiency of Parliamentary Advocates, enhancing their institutional capacities, creation of necessary conditions for their effective activity through adducing the Centre for Human Rights' budget in line with the requirements of their legal duties and responsibilities.

Means of verification: Amendments drafted and adopted.

1. Centre for Human Rights has enhanced institutional capacity and has necessary conditions for effective activity.

Means of verification: Assessment report bv independent experts.

Appendix 2: Disbursement arrangements and timetable (budget support)

  1. Responsibilities

On the basis of the conditions for disbursement set out in this Financing Agreement the Ministry of Finance of the Republic of Moldova shall make a formal request to the Commission for the disbursement of each instalment according to the indicative dates set out in Table A below, including (i) the fullest possible analysis and justification for the release of funds, including supporting documentation which should be annexed; and (ii) a duly signed Financial Identification Form in order to facilitate subsequent payment.

  1. Indicative disbursement timetable

An indicative disbursement timetable is set out below.

Table A Summary Indicative disbursement timetable Sector Budget Support (EUR 58.2 million) and

Technical Assistance (EUR 1.8 million1)

Component

2013

2014

2015

2016

Total

Ql

Q2

Q3

Q4

Ql

Q2

Q3

Q4

Ql

Q2

Q3

Q4

Ql

Q2

ANNUAL ACTION PROGRAMME (EUR 50.2 million)

Fixed

13.0

6

3

1.3

23.3

Variable

Judiciary

1.2

1.8

2.38

5.38

Investigation and Prosecution

1.2

1.8

2.38

5.38

Enforcement

1.2

1.8

2.38

5.38

Juvenile Justice

1.2

1.8

2.38

5.38

Intolerance

towards

corruption

1.2

1.8

2.38

5.38

Total Annual

Action

Programme

13.0

12.0

12.0

13.2

50.2

EaPIC PROGRAMME (EUR 8.0 million)

Fixed

2.0

3.0

3.0

8.0

Additional measures to improve human rights protection

2.0

3.0

3.0

8.0

Total EaPIC

2.0

3.0

3.0

8.0

TOTAL

BUDGET

SUPPORT

15.0

15.0

15.0

13.2

58.2

Total Technical Assistance

0.15

1.5

0.15

1.8

Technical Assistance will be used to extend, if need be, the 4 Technical Assistance projects in Justice field from AAP 2011 and for the evaluations of Budget Support tranches and additional EaPIC top up tranches and for audit.

3. General conditions for instalment release

The General Conditions for instalment release are set out in Table B. They shall apply to the disbursement of all instalments and all requests for instalment release shall be accompanied by supporting information on the status of these.

Table B: General Conditions for tranche release

Area

Condition

Source of verification

Sector policies and reforms

Satisfactory progress in the implementation of the 2011-2016 Justice Sector Reform Strategy (JSRS) and Action Plans with financing requirements consistent with budgetary allocations.

Mo J JSRS progress reports; NCLEBR minutes; annual state budgets and MTBF.

Stable macro-economic framework

Maintenance of a credible and relevant stability-oriented macroeconomic policy or progress made towards restoring key balances.

IMF reviews and reports as appropriate.

Public Finance Management

Satisfactory progress in the implementation of the programme to improve public finance management.

GoM and/or donor reports on PFM strategy-implementation.

Transparency and oversight of the budget

Satisfactory progress with regard to the public availability of accessible, timely, comprehensive, and sound budgetary information.

Key budget documents (including the Executive's budget proposal, the Enacted Budget and the Audit report).

4. Specific Conditions for tranche release

Specific Conditions for release of each instalment apply in addition to the General Conditions which are applicable to all tranches. These are summarised in Table C and detailed in Appendix 1.

Table C: Specific Conditions for tranche release (in EUR million)

Instalment

Amount

Indicative disbursement request date (Quarter/Year)

Indicative disbursement

date (Quarter/Year)

Condition/Criteria/Activity for disbursement

Source of Verification

First

Instalment -fixed

component

15.0

2/2013

2/2013

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table A + in Appendix 1 - Table C (for EaPIC share only).

see Table B and

Appendix 1

Second Instalment -fixed

component

9.0

1/2014

2/2014

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table A + in Appendix 1 - Table C (for EaPIC share only).

see Table B and

Appendix 1

Second Instalment -variable component

6.0

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table B.

see Table B and

Appendix 1

Third

Instalment -fixed

component

6.0

1/2015

2/2015

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table A + in Appendix 1 - Table C (for EaPIC share only).

see Table B and

Appendix 1

Third

Instalment -

variable

component

9.0

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table B.

see Table B and

Appendix 1

Fourth Instalment -fixed

component

1.3

1/2016

2/2016

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table A.

see Table B and

Appendix 1

Fourth Instalment -variable component

11.9

General Conditions as set out in Table B and Specific Conditions on sector reform management as detailed in Appendix 1 - Table B.

see Table B and

Appendix 1

The conditions for disbursement under the variable tranche are fixed for the duration of the programme, but criteria for their assessment may be modified in accordance with Section 2.3.2 of the Technical and Administrative Provisions.

5. Performance assessment and variable instalments

The first instalment (or tranche) will be composed entirely of a fixed component.

The second, third, and fourth instalments will have both a fixed component and a variable component.

The instalment of the fixed components will be paid in full when the Government is in compliance with agreed fixed conditions, while nothing is to be paid when the Government is not in compliance with agreed fixed conditions.

In case of non-compliance with the fixed component conditions of the Annual Action Programme Funds, there will be no disbursement of EaPIC Programme funds.

It is important to note that compliance with fixed component conditions of the Annual Action Programme funds is a pre-condition for the review of the variable component and, therefore, non-compliance with the fixed component also means that there will be no disbursement of the variable component.

Concerning the assessment of the variable components, 4 (four) aggregate performance categories will apply. Performance categories and related score and disbursement are as follows:

Funds withheld for limited performance in variable components will be lost at the end of the Programme. In duly justified cases, however, a re-assessment of unmet targets in the following year against the original target will be possible during the implementation of the Programme:

  1. if there is an overall positive trend at programme level, and
  2. if the government did not reach the target as originally scheduled because of external factors.

Table D: Maximum Amounts (EUR million) to be paid and percentage of Fixed and Variable Components

1st

2nd

3rd

4th

Instalment

Instalment

Instalment

Instalment

% total

maximum

% total

maximum

% total

maximum

% total

maximum

instalment

amount

instalment

amount

instalment

amount

instalment

amount

A. Fixed component Conditions Al and A2

100

13.0

50

6

25

3

10

1.3

B. Variable component

50

75

90

Bl. Judiciary

(10)

1.2

(15)

1.8

(18)

2.38

B2. Investigation/Prosecution

(10)

1.2

(15)

1.8

(18)

2.38

B3. Enforcement

(10)

1.2

(15)

1.8

(18)

2.38

B4. Juvenile Justice

(10)

1.2

(15)

1.8

(18)

2.38

B5. Intolerance towards corruption

(10)

1.2

(15)

1.8

(18)

2.38

C. Fixed component

100

100

100

CI. Additional measures to improve Human Rights Protection in Moldova

2.0

3.0

3.0

Total

15.0

15.0

15.0

13.2

2 The table reflects the percentage and maximum amounts allocated for each variable component condition