ANNEX I - GENERAL CONDITIONS

TITLE I - PROJECT/PROGRAMME FINANCING ARTICLE 1 - GENERAL PRINCIPLE

  1. The EU's financial contribution shall be limited to the amount specified in the Financing Agreement.
  2. The provision of the EU financing shall be subject to fulfilment of the Beneficiary's obligations under this Financing Agreement.
  3. The expenditure incurred by the Beneficiary before the entry into force of the Financing Agreement is not eligible for the EU financing.

ARTICLE 2 - COST OVERRUNS AND COVERING THEM

  1. Individual overruns of the budget headings of the Financing Agreement shall be dealt with by reallocating funds within the overall budget, in accordance with Article 22 of these General Conditions.
  2. Wherever there is a risk of overrunning the global amount set in the Financing Agreement, the Beneficiary shall immediately inform the Commission and seek its prior approval for the corrective measures planned to cover the overrun, proposing either to scale down the project/programme or to draw on its own or other non-EU resources.
  3. If the project/programme cannot be scaled down, or if the overrun cannot be covered either by the Beneficiary's own resources or other resources, the Commission may, at the Beneficiary's duly substantiated request, decide to grant additional EU financing. Should the Commission take such a decision, the excess costs shall be financed, without prejudice to the relevant EU rules and procedures, by the release of an additional financial contribution to be set by the Commission.

TITLE II - IMPLEMENTATION

ARTICLE 3 - GENERAL PRINCIPLE

The project/programme shall be implemented under the responsibility of the Beneficiary

with the approval of the Commission.

ARTICLE 4 - PERIOD OF EXECUTION

  1. The period of execution of the Financing Agreement shall comprise two phases:
  1. Costs related to the principal activities shall be eligible for EU financing only if they have been incurred during the operational implementation phase. Costs related to final audits and evaluation and closure activities shall be eligible up to the end of the closure phase.
  2. Any balance remaining from the EU contribution will be automatically decommitted no later than six months after the end of the period of execution.
  3. In exceptional and duly substantiated cases, a request may be made for the extension of the operational implementation phase and correlatively of the period of execution. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the operational implementation phase and approved by the Commission before that latter date.
  4. In exceptional and duly substantiated cases, and after the end of the operational implementation phase, a request may be made for the extension of the closure phase and correlatively of the period of execution. If the extension is requested by the Beneficiary, the request must be made at least three months before the end of the closure phase and approved by the Commission before that latter date.

TITLE III - PAYMENTS TO BE MADE BY THE COMMISSION

TO THIRD PARTIES

ARTICLE 5 - DEADLINE FOR PAYMENTS TO BE MADE BY THE COMMISSION TO THIRD PARTIES

5.1 When the Commission is making payments related to contracts implementing the Financing Agreement and awarded by the Beneficiary, the Beneficiary shall undertake to provide the Commission with the payment requests or invoice no later than 15 calendar days before the payment deadline for the initial pre-financings specified in the contract. In case of further pre-financing for grants, and interim and final payments, the Beneficiary shall undertake to provide the Commission with the payment request or invoice not later than 30 calendar days before the expiry of the payment deadline specified in the contract. The Beneficiary shall notify the Commission of the date of registration of this request. The payment request is not admissible if at least one essential requirement is not met. The time limit for payments may be suspended at any time by the Commission by informing the Beneficiary, that the payment request can not be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request, comes to the notice of the Commission the Commission may suspend the time limit for payment for the purpose of further verification, including an on-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible. The suspension should be communicated to the Beneficiary as soon as possible. The time limit for payment shall resume once the payment request becomes admissible.

TITLE IV - PAYMENTS TO BE MADE BY THE BENEFICIARY TO THIRD PARTIES AND DISBURSEMENT TO BE MADE BY THE COMMISSION THROUGH PROGRAMME ESTIMATES

ARTICLE 6 - GENERAL PRINCIPLE

  1. When the Beneficiary is making payments to third parties, programme estimates must be drawn up and adopted beforehand.
  2. The programme estimate is a document laying down the programme of measures to be carried out and the human and material resources required, the corresponding budget and the detailed technical and administrative implementing arrangements for decentralised execution of a project/programme over a specified period by direct labour and/or by means of public procurement and/or the award of grants.
  3. All programme estimates implementing the Financing Agreement must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question.

ARTICLE 7 - DISBURSEMENT

  1. The Commission shall transfer funds no later than 45 calendar days after the date on which it registers an admissible payment request from the Beneficiary. The payment request is not admissible if at least one essential requirement is not met. The time limit for payments may be suspended by the Commission by informing the Beneficiary, at any time during the period referred to above, that the payment request can not be met, either because the amount is not due or because the appropriate supporting documents have not been produced. If information which puts in doubt the eligibility of expenditure appearing in a payment request comes to the notice of the Commission, the Commission may suspend the time limit for payment for the purpose of further verification, including an on-spot check, in order to ascertain, prior to payment, that the expenditure is indeed eligible The suspension should be communicated to the Beneficiary as soon as possible. The time limit for payment shall resume once the payment request becomes admissible.
  2. The Commission shall make payments to a bank account denominated in euro and opened at a financial institution accepted by the Commission.
  3. The Beneficiary shall guarantee that funds paid by the Commission by way of pre­financing can be identified in this bank account.
  4. Transfers in euro shall, if necessary, be converted into the Beneficiary's national currency as and when payments have to be made by the Beneficiary, at the bank rate in force on the day of payment by the Beneficiary.
  5. The funds paid by the Commission to this bank account shall yield interest or equivalent benefits. The Beneficiary shall notify the Commission of interest or equivalent benefits yielded by those funds at least once a year.
  6. Interest or equivalent benefits yielded by the funds paid of more than two hundred fifty thousand euro shall be repaid to the Commission within 45 days of receipt of the Commission's request.
  7. For a programme estimate which has not given rise to any transfer of funds within three years of its signature, the corresponding committed amount shall be decommitted.

TITLE V - AWARD OF PROCUREMENT AND GRANT

CONTRACTS

ARTICLE 8 - GENERAL PRINCIPLES.

  1. All contracts implementing the Financing Agreement must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the award of procurement and grant contracts , in force at the time of the launch of the procedure in question.
  2. The Beneficiary shall use the language of this Financing Agreement for the award of procurement and grant contracts ,
  3. In cases of decentralised contracts, the Beneficiary will inform the Commission when a candidate, tenderer or applicant is in a situation of exclusion from participation in award procedures according to the relevant provisions of the Financial Regulation applicable to the general budget of the European Union or when a contractor has been guilty of making false declarations or has made substantial errors or committed irregularities and fraud, or has been found in serious breach of its contractual obligations.

In such cases, without prejudice to the power of the Commission to exclude an entity from future procurement and grant contracts financed by the EU according to the Financial Regulation applicable to the general budget of the European Union, financial penalties to contractors mentioned in the provision on "Administrative and Financial Penalties" of the General Conditions of decentralised contracts may be imposed to the contractors by the Beneficiary if this is allowed by its national law. Such financial penalties shall be imposed following an adversarial procedure and ensuring the right of defence of the contractor.

8.4 The Beneficiary undertakes to take every appropriate measure to remedy any practices of active or passive corruption whatsoever at any stage of the procedure for the award of contracts or grants. "Passive corruption" shall mean the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or for a third party, or accepts a promise of such an advantage, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests. "Active corruption" shall mean the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official, for himself or for a third party, to act or refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties, which has, or would have, the effect of harming the EU's financial interests.

ARTICLE 9 - DEADLINE FOR THE SIGNATURE OF THE CONTRACTS IMPLEMENTING THE FINANCING AGREEMENT

  1. Except for those components of this Financial Agreement implemented under Joint Management or Indirect Centralised Management, the contracts implementing the Financing Agreement shall be signed by both parties within three years of the entry into force of the Financing Agreement. That deadline may not be extended.
  2. The above provision shall not apply to:
  1. At the end of the three years of the entry into force of the Financing Agreement, any balance for which contracts have not been signed, except those referred to in Article 9.2 here above, will be decommitted
  2. The above provision shall not apply to any balance of the contingency reserve.
  3. A contract which has not given rise to any payment within three years of its signature shall be automatically terminated and its funding shall be decommitted.

ARTICLE 10 - ELIGIBILITY

  1. Participation in invitations to tender for works, supply or service contracts and in calls for proposals shall be open on equal terms to all natural and legal persons of the Member States of the EU and, in accordance with the specific provisions in the basic acts governing the cooperation sector concerned, to all natural and legal persons of the beneficiary third countries or of any other third country expressly mentioned in those acts.
  2. It may be decided, on the basis of the specific conditions laid down in the basic acts governing the cooperation sector concerned, to allow third-country nationals other than those referred to in paragraph 1 to tender for contracts.
  3. Goods and supplies financed by the EU and necessary for the performance of works, supply and service contracts and procurement procedures launched by the grant beneficiaries for the execution of the action financed must originate in countries eligible to participate in the terms laid down in the previous two paragraphs, except when it is provided otherwise in the basic act.

ARTICLE 11 - PUBLICATION OF INFORMATION

  1. The Beneficiary undertakes to publish each year in a dedicated and easily accessible place of its internet site the title of each contract financed by the Financing Agreement, the name and nationality of the grant beneficiary or successful tenderer as well as the amount of the corresponding grant or contract.
  2. If such internet publication is impossible, the information shall be published by any other appropriate means, including the official journal of the Beneficiary. Publication shall take place during the first half of the year following the closure of the year in respect of which the contracts and grants were awarded by the Beneficiary. The Beneficiary shall communicate to the Commission the address of the place of publication and reference shall be made to this address in the dedicated place of the internet site of EuropeAid . If the information is published otherwise, the Beneficiary shall give the Commission full details of the means used.

TITLE VI - RULES APPLICABLE TO THE PERFORMANCE OF

CONTRACTS

ARTICLE 12 - ESTABLISHMENT AND RIGHT OF RESIDENCE

  1. Where justified by the nature of the contract the Beneficiary shall entitle natural and legal persons participating in invitations to tender for works, supply or service contracts with a provisional right of establishment and residence in the Beneficiary's territory(ies). This right shall remain valid for one month after the contract is awarded.
  2. The Beneficiary shall also entitle contractors (procurement and grant contracts) and natural persons whose services are required for the performance of the contract and members of their family with similar rights during the implementation of the project/programme.

ARTICLE 13 - TAX AND CUSTOMS PROVISIONS

  1. The Beneficiary shall apply to procurement contracts and grants financed by the EU the most favoured tax and customs arrangements applied to States or international development organisations with which it has relations.
  2. Where a Framework Agreement is applicable, which includes more detailed provisions on this subject, these provisions shall apply as well.

ARTICLE 14 - FOREIGN EXCHANGE ARRANGEMENTS

  1. The Beneficiary undertakes to authorise the import or purchase of the foreign currency necessary for the implementation of the project. It also undertakes to apply its national foreign exchange regulations in a non-discriminatory manner to the contractors allowed to participate referred to in Article 10 of these General Conditions.
  2. Where a Framework Agreement is applicable, which includes more detailed provisions on this subject, these provisions shall apply as well.

ARTICLE 15 - USE OF DATA FROM STUDIES

Where the Financing Agreement involves the financing of a study, the contract related to this study, signed for the implementation of the Financing Agreement, shall govern the ownership of that study and shall include the right for the Beneficiary and the Commission to use data in the study, to publish it or to disclose it to third parties.

ARTICLE 16 - ALLOCATIONS OF AMOUNTS RECOVERED UNDERCONTRACTS

  1. Without prejudice to the responsibilities of the Beneficiary, the Commission may, in accordance with the relevant provisions of the Financial Regulation applicable to the general budget of the European Union formally establish an amount as being wrongly paid under a contract financed under this Financing Agreement and proceed to its recovery by any means.
  2. Amounts recovered by the Beneficiary from payments wrongly effected, from financial guarantees lodged on the basis of procedures of award of contracts or under a contract financed under this Financing Agreement, as well as from financial penalties imposed by the Beneficiary on candidate, tenderer, contractor or grant beneficiary, shall be returned to the Commission. The damages granted to the Beneficiary shall also be returned to the Commission.

ARTICLE 17 - FINANCIAL CLAIMS UNDER CONTRACTS

The Beneficiary undertakes to confer with the Commission before taking any decision concerning a request for compensation made by a contractor and considered by the Beneficiary to be justified in whole or in part. The financial consequences may be borne by the EU only where the Commission has given its prior approval. Such prior approval is also required for any use of funds committed under the present Financing Agreement to cover costs arising from disputes relating to contracts.

TITLE VII - GENERAL AND FINAL PROVISIONS

ARTICLE 18-VISIBILITY

  1. Every project/programme financed by the EU shall be subject to the appropriate communication and information measures. Unless otherwise agreed, the Beneficiary shall take the necessary measures to ensure the visibility of the EU funding for the project/programme. These measures shall be defined under the responsibility of the Beneficiary with the approval of the Commission.
  2. These communication and information measures shall follow the rules in the Communications and Visibility Manual for EU External Actions laid down and published by the Commission, in force at the time of the measures.

ARTICLE 19 - PREVENTION OF IRREGULARITIES, FRAUD AND

CORRUPTION

  1. The Beneficiary undertakes to check regularly that the operations financed with the EU funds have been properly implemented. It shall take appropriate measures to prevent irregularities and fraud and, if necessary, bring prosecutions to recover funds wrongly paid.
  2. "Irregularity" shall mean any infringement of the Financing Agreement, implementing contracts and programme estimates or of EU law resulting from an act or omission by an economic operator, which has, or would have, the effect of prejudicing the general budget of the EU, either by reducing or losing revenue accruing from own resources collected directly on behalf of the EU, or by an unjustified item of expenditure.

"Fraud" shall mean any intentional act or omission concerning:

  1. The Beneficiary shall immediately inform the Commission of any element brought to its attention which arouses suspicions of irregularities or fraud and of any measure taken to deal with them.
  2. As stated in Article 8.3, in cases of decentralised contracts, the Beneficiary will inform the Commission when a contractor has been guilty of making false declarations or has made substantial errors or committed irregularities and fraud, or has been found in serious breach of its contractual obligations.

Without prejudice to the power of the Commission to exclude a natural or legal person from future procurement and grant contracts financed by the EU according to the Financial Regulation applicable to the general budget of the European Union financial penalties to contractors mentioned in the provision on "Administrative and Financial Penalties" of the General Conditions of decentralised contracts may be imposed to contractors by the Beneficiary if this is allowed by its national law. Such financial penalties shall be imposed , following an adversarial procedure and ensuring the right of defence of the contractor.

  1. The Beneficiary shall immediately inform the Commission of the name of the economic operators whom have been the subject of a judgment which has the force of res judicata for fraud, corruption, involvement in a criminal organisation or any other illegal activity detrimental to the EU's financial interests.
  2. The Beneficiary undertakes to take every appropriate measure to remedy any practices of active or passive corruption whatsoever in the implementation of the related contracts. Definitions in Article 8.3 apply herein.

If the Beneficiary does not take the appropriate measures to remedy any practices of corruption or fraud mentioned under this article, the Commission may adopt itself such measures including the recovery of the EU funding by any means.

ARTICLE 20 - VERIFICATIONS AND CHECKS BY THE COMMISSION, THE EUROPEAN ANTI-FRAUD OFFICE (OLAF) AND THE EUROPEAN COURT OF AUDITORS

  1. The Beneficiary agrees to the Commission, OLAF and the European Court of Auditors conducting documentary and on-the-spot checks on the use made of EU funding under the Financing Agreement (including procedures for the award of contracts and grants) and carrying out a full audit, if necessary, on the basis of supporting documents of accounts and accounting documents and any other documents relating to the financing of the project/programme, throughout the duration of the agreement and for seven years after the date of the last payment.
  2. The Beneficiary also agrees that OLAF may carry out on-the-spot checks and verifications in accordance with the procedures laid down by EU law for the protection of the EU's financial interests against fraud and other irregularities.
  3. To that end, the Beneficiary undertakes to grant officials of the Commission, OLAF and the European Court of Auditors and their authorised agents access to sites and premises at which operations financed under the Financing Agreement are carried out, including their computer systems, and to any documents and computerised data concerning the technical and financial management of those operations, and to take every appropriate measure to facilitate their work. Access by authorised agents of the Commission, OLAF and the European Court of Auditors shall be granted on conditions of strict confidentiality with regard to third parties, without prejudice to public law obligations to which they are subject. Documents must be accessible and filed in a manner permitting easy inspection, the Beneficiary being bound to inform the Commission, OLAF or the European Court of Auditors of the exact location at which they are kept.
  4. The checks and audits described above shall also apply to contractors and subcontractors who have received EU funding.
  5. The Beneficiary shall be notified of on-the-spot missions by agents appointed by the Commission, OLAF or the European Court of Auditors.
  6. The Beneficiary shall keep the following financial and contractual supporting documents

Procurement procedures:

Calls for proposals and direct award of grants:

In case of decentralised operations:

ARTICLE 21 - CONSULTATION BETWEEN THE COMMISSION AND THE

BENEFICIARY

  1. The Beneficiary and the Commission shall consult each other before taking any dispute relating to the implementation or interpretation of this Financing Agreement further.
  2. Where the Commission becomes aware of problems in carrying out procedures relating to management of this Financing Agreement, it shall establish all necessary contacts with the Beneficiary to remedy the situation and, take any steps that are necessary, including, where the Beneficiary does not, or is unable to, perform the duties incumbent on it, temporarily taking the Beneficiary's place
  3. The consultation may lead to the amendment, suspension or termination of the Financing Agreement.

ARTICLE 22 - AMENDMENT OF THE FINANCING AGREEMENT

  1. Any amendment to the Special Conditions, Annex II and Annex III to the Financing Agreement shall be made in writing and be the subject of an addendum.
  2. If the request for an amendment comes from the Beneficiary, the latter shall submit that request to the Commission at least three months before the amendment is intended to enter into force, except in cases which are duly substantiated by the Beneficiary and accepted by the Commission.
  3. For technical adjustments which do not affect the objectives and results of the project/programme and alterations in matters of detail which do not affect the technical solution adopted, and with no reallocation of funds, the Beneficiary shall inform the Commission of the amendment and its justification in writing as soon as possible and apply that amendment.
  4. The use of contingency reserve shall be subject to the Commission's prior written approval.
  5. The specific cases of the extension of the operational implementation phase or closure phase are governed by Article 4 (4) and (5) of these General Conditions.
  6. Where the Commission considers that the Beneficiary ceases to satisfy the decentralisation criteria and without prejudice to Articles 23 and 24 of these General Conditions, the Commission may decide to retake the financial implementation tasks entrusted to the Beneficiary in order to continue the implementation of the project/programme on behalf, and for the account, of the Beneficiary after informing the latter in written form

ARTICLE 23. SUSPENSION OF THE FINANCING AGREEMENT

23.1 The Financing Agreement may be suspended in the following cases:

  1. No prior notice shall be given of the suspension decision.
  2. The Commission may take any appropriate precautionary measure before suspension takes place.
  3. When the suspension is notified, the consequences on the ongoing contracts and programme estimates or contracts and programme estimates to be signed will be indicated.
  4. A suspension of the Financing Agreement is without prejudice to the suspension of payments by the Commission for the sake of ensuring sound financial management or protecting the EU's financial interests.

ARTICLE 24 - TERMINATION OF THE FINANCING AGREEMENT

  1. If the issues which led to the suspension of the Financing Agreement have not been resolved within a maximum period of 180 days, either party may terminate the Financing Agreement at 30 days' notice.
  2. Where a Financing Agreement has not given rise to any payment within three years of its signature or no implementing contract has been signed within this period, that Financing Agreement will be terminated.
  3. When the termination is notified, the consequences on the ongoing contracts and programme estimates or contracts and programme estimates to be signed will be indicated.

ARTICLE 25 - DISPUTE-SETTLEMENT ARRANGEMENTS

  1. Any dispute concerning the Financing Agreement which cannot be settled within a six-month period by the consultations between the parties provided for in Article 21 of these General Conditions may be settled by arbitration at one of the parties' request.
  2. In this case the parties shall each designate an arbitrator within 30 days of the request for arbitration. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration (The Hague) to designate a second arbitrator. The two arbitrators shall in their turn designate a third arbitrator within 30 days. Failing that, either party may ask the Secretary-General of the Permanent Court of Arbitration to designate the third arbitrator.
  3. Unless the arbitrators decide otherwise, the procedure laid down in the Permanent Court of Arbitration Optional Rules for Arbitration Involving International Organisations and States shall apply. The arbitrators' decisions shall be taken by a majority within a period of three months.
  4. Each party shall be bound to take the measures necessary for the application of the arbitrators' decision.
  1. Elimination of unsuccessful bids five years after the closure of the procurement procedure. ↑

  2. Elimination of unsuccessful applications three years after the closure of the grant procedure. ↑